INSTALLATION INSTRUCTIONS
SQDP, SQDPH, SQDTH, SQDLV ADJ
Mounting Frame
Upon receipt, thoroughly inspect for any freight damage which should be brought to the attention of the delivery carrier. Compare the catalog des cription listed on the packing slip with the label on the carto n to ensure you have received the correct merchandise.
IMPORTANT SAFETY INFORMATION
For Your Protection, Read Carefully
WARNING: Risk of fire. Do not install insulation within 3 inches of fixture sides or wiring compartment, nor above the fixture in such a manner as to entrap heat.
This product must be installed by a person familiar with the construction and operation of the product and the hazards involved, in accordance with the applicable installation code.
Open
Figure 1
Channel
bar
Figure 2
Mounting
Figure 3
SAVE THESE INSTRUCTIONS
NEW INSTALLATION FOR SQ SERIES
frame
Ceiling
Clamping latch arms
Closed
Bent tab
T-Bar
Wire tie
Flush or
slightly
above
ceiling line
Lay-in panel T-bar ceiling:
1. Cut ceiling opening slightly larg er than the outside opening of the mounting frame.
2. Position mounting frame through openin g in ceiling. Release clamping latch arms and adjust channel bars to the correct spacing between T-bar (see Figure 1). Secure channel bars to T-bar by means of wire ties, screws or by bending ends onto T-bar (see Figure 2).
3. Once mounting frame has been secured in structure, adjust the mounting frame vertic ally to align the bottom edge to either flush or slightly above (1/8" max) the ceiling line (see Figure 3). Secure mounting frame into position by closing the clamping latc h arm. The notch located in the draw-down flange of the ho us ing can be used to assist with alignment of multiple fixtures (see Figure 4).
4. If additional security is required, a No. 8 sheet metal screw, wire tie or wire (not supplied) may be used to tie the latc h arm to the mounting frame (see Figure 1).
5. Remove knockouts on junction box to feed power supply to fixture (see Figure 5). Supp ly wire must meet applicable electrical co des an d be rated for a minimum of 90°C. Junctio n bo x is thru-wire rated for 8-No. 12 AWG conductors (4 in-4 out).
6. Complete necessary wire connections. Snap the door onto the junction box.
1. Electric current can cause painful shock or serious injury unless handled properly. For you safety, always remember the following:
Turn off the supply power.
Ground the fixture to avoid potential electrical
shocks.
Do not handle an energized fixture or ener gize any fixture with wet hands, when standing on a wet or damp surface, or in water.
2. Specific safety information concerning lamps:
Match wattage of fixture and lamp exactly.
Do not remove or insert lamp when power is
on.
Do not scratch glass or subjec t lamp to undue pressure as either may cause lamp breakage.
Protect operating lamp from sources of moisture.
If lamp is marked it contains mercury. Follow disposal laws. See: www.lamprecycle.org
.
Figure 4
Figure 5
Sight
Notches
Remove
knockouts
as needed
7. To adjust housing alignment after installation, see “Post Installation
Adjustment.”
!
CAUTION! For T4/T6 and low voltage MR16 downlights, lens must be in place in front of lamp before fixture is energized.
1/10 1 of 2
©2009 Acuity Brands Lighting, Inc.
All Rights Reserved.
SQDP, SQDPH, SQDTH, SQDLV ADJ Mounting Frame Installation Instructions
NEW INSTALLATION FOR SQ SERIES Non-accessible ceiling
(plaster, drywall, etc.):
1. Release clamping latch arms and adjust channel bars to the corr ect spacin g between joists (see Figure 1).
Mounting Channel Bar-Flexible Wiring Method
2. Bend ends of channel bars 90° and adjustment at its lowest point on the mounting frame. Make sure bottom of the flange is flush with the bottom of the joists. Secure mounting frame into position by closing the clamping latch a rm. Channel bars will accommodate up to 24” O.C. joists. The notch located in the draw-down flange of the housing can be used to assist with alignment of multiple fixtures.
Non-Flexible Wiring Method
If non-flexible wiring methods are used, follow procedure for Flexible Wiring Method, then lower mounting frame equal to the thickness of the finished ceiling or slightly above ( 1/8” max. – see Figure 3). The notch located in the draw-down flange of the housing can be used to assist with alignment of multiple fixtures.
3. Remove knockouts on junction box to feed power supply to fixture (see Figure 5). Supply wire must meet applicable electrical codes and be rated for a minimum of 90°C. Junction box is thru-wire rated for 8-No. 12 AWG conductors(4in-4out).
Figure 6
Thumb screw
Wing nut
Figure 7
Figure 8
Figure 9
(located in center of assembly)
Wing nuts
Thumb screw
Junction box
Speed nuts
ACCESSING JUNCTION BOX FROM BELOW FOR REPLACING BALLAST AND THERMAL PROTECTOR
To gain access to junction box from below ceiling.
1. Remove trim.
2. Adjust lamp mounting bracket allowin g access to door, loosen thumb screw to remove door from housing and set aside (see Figure 6).
AIMING LAMPS SQDP, SQDPH, SQDTH housings
1. Remove trim.
2. Loosen wing nut securing lamp mounting brac ket in place, adjust to desired vertical position and retighten (see Figure 7).
3. Loosen thumb screw securing lamp mounting bracket to top of housing, adjust to desire d horiz ontal position and retighten (see Figure 7).
4. Reinstall trim.
SQDLV ADJ housings
1. Remove trim.
2. Loosen wing nut securing lamp mounting brac ket in place, adjust to desired vertical position and retighten (see Figure 8).
3. Loosen wing nut securing lamp mounting brac ket to top of housing, adjust to desired h orizo ntal pos ition and retighten (see Figure 8).
4. Reinstall trim.
POST INSTALLATION HOUSING ALIGNMENT
In the event that the trim is in need of alignment after installation, adjustments can be made to the housing.
1. Remove trim by gripping edge of flange and pulling it out of housing.
2. To adjust housing for trim alignment, reac h thr o ugh aperture and loosen two speed nuts. Adjust housing as required and retighten nuts (see Figure 9).
3. Reinstall trim.
1/10 2 of 2
©2009 Acuity Brands Lighting, Inc.
All Rights Reserved.