Gotham PDPH Elevations User Manual

INSTALLATION INSTRUCTIONS
!
®
Elevations
®
Performance Decorative Pendant
PDPF EL, PDPH
Upon receipt, thoroughly inspect for any freight damage which should be brought to the attention of the delivery carrier. Com­pare the catalog description listed on the packing slip with the label on the carton to ensure you have received the correct mer­chandise.
IMPORTANT SAFETY INFORMATION
For Your Protection, Read Carefully
1. Electric current can cause painful shock or serious injury unless handled properly. For your safety, always remember the fol­lowing:
Turn off the power supply.
Ground the fixture to avoid potential
Do not handle an energized fixture or energize any fixture with wet hands, when standing on a wet or damp sur­face, or in water.
Double check all electrical connections to be sure they are tight and correct.
SA VE THESE INSTRUCTIONS
Direct Mount (Emergency PDPF and Standard PDPH)
I. Ground Prep
1. Temporarily remove top cap and any decorative piece to expose support bracket.
2. Removing socket assembly from box, attach socket cup to reflector (per trim instructions).
3. Route socket conductors through center hole on exposed support bracket.
4. Route socket conductors through top cap, replace top cap leaving screws protruding 1/2 in. through keyholes (See Figure 1A).
5. Clip off any packaging ties from the bottom of the canopy and loosen the 1/4-20 nut to remove the bolt.
6. Slide the ballast assembly out of the canopy and rotate the flat plate to align its keyholes with the bracket slots. VERIFY THAT THE ROUND DECORATIVE ELEMENT (IF REQUIRED) IS ON PRIOR TO CONTINUING!
7. Route socket conductors from the fixture through the flat plate and ballast bracket hole. (Place a screwdriver in the side hole of the ballast bracket to hold open if needed - See Figure 1B).
8. Place the fixture screws into both T-shaped slots on ballast bracket. Push screw heads completey forward and twist the fixture cap to center. Use socket wrench tool to tighten both screws. ALL SCREWS MUST BE COMPLETELY FORWARD IN KEYHOLES FOR FIXTURE TO BE CENTERED! Adjust if necessary (See Figures 1B and 1B-2).
9.
10. Tuck all wires, close canopy assembly and replace the 1/4-20 bolt into large
11. Seat bolt head flush and securely replace the nut on opposite side of assembly.
12. Separate j-box pan from canopy by loosening the 3 side screws.
II. Ceiling Installation
13. Hang mounting pan by routing j-box wires through back of pan, and using
Figure 1A
WARNING! Possible falling hazard and risk of serious injury. Gather both cord and socket leads into tie strap strain relief so that a minimum of two inches of cord conductors with socket conductors are pulled inside tie strap. Pull tie strap tight enough to strain relieve all connections. Trim excess strap material (See Figure 1B). Make necessary conductor connections between ballast, socket and ground wires using wire nuts.
hole near bottom of canopy.
either the 3.5 in. or 4.5 in. key holes, secure to j-box (See Figure 1C).
Figure 1B
2. Specific safety information concern­ing lamps:
Match wattage of fixture and lamp ex-
actly.
Do not remove or insert lamp when power
is on.
Do not scratch glass or subject lamp to
undue pressure as either may cause lamp breakage.
Protect operating lamp from sources
of moisture.
ivynarofkcehC
motpmySesuaCelbissoPnoitcAevitcerroC
OTSLIAFPMAL
THGIL
TUOSEOGPMAL
GNITHGILRETFA
DNA
NOSELCYCPMAL
FFO
TRAHCGNITOOHSELBUORT
omrotiucricnirorregniriW·
pmalytluaF·
tuptuotsallabroeniL·
tsallabytluaF·
pmalytluaF· naht
wolooterutarepmettneibmA·
erutxifotesolcootsinoitalusnI·
hgihootegattawpmaL·
wolegatlovtuptuotsallaB·
.snoitcaevitcerrocdnasesuacelbissopfotsilgniwollofeht
dezigrenetonerutxifehtgnideeftiucriC·
noitcennocelud
.tcerroc
ilotnwonksitahteno
.enowenahtiw
ehC·
enilkcehC·
.ytiunitnoctiucrickc
.pmalwenaetutitsbuS.thgilotgniliafylpmis
rfnoitalusnievomeR·
.gnisuohnideificepsegattawpmalllatsnI·
nimelborpehtetacol,noitidnocdoognimeesyehtfI.eludomni-emarfropmalehtotegamadelbis
.dezig
renesitiucrictahterusneotesufrorekaerbtiucrickcehC· erasnoitcennoctahterusneotxobecilpserutxifenimaxE·
ylbareferp,pmalrehtonaetutitsbusdnapmalytluafehtevomeR·
lanigiroehtecalper,sthgilpmalehtfI.thg
.egatlovtiucricnepokcehC.erutxiftaegatlovenilkcehC·
.snoitidnoclatnemnorivnegnitsixetsniagagnitartsallabkcehC·
rehtarmotpmyssihttibihxelliwpmalayllanoisaccO·
)"3tsaelta(eludomdnuoramo
.egatlovtiucricnepokcehC.erutxifehttaegatlov
Part No. CJ52007
©2005 Gotham Rev B. 11/07
Elevations
®
- Part II
!
Fixture connections and hanging instructions
Figure 1B-2
1/2
4
1/2
1/2
3
1/2
4
3
Figure 1C
Figure 1D
14. Attach the safety chain hook to an open hole to secure and suspend the entire assembly. Make power and ground connec­tions. For EL, cap the unused 120V or 277V line from the canopy and connect the battery activation leads (small red and white wires).
15. Position the complete assembly to align the "V" notch on the canopy with the "V" notch on the mounting pan. Tuck in all wires, close assembly to mounting pan and twist to engage screws into L­slots (See Figure 1D).
16. Tighten screws. INSTALLATION COMPLETE.
Cord Mount (Emergency PDPF and Standard PDPH) I. Ground Prep
1. Temporarily remove top cap and any round decorative piece to ex­pose support bracket.
2. Removing socket assembly from box, attach socket cup to reflector (per trim instructions).
3. Route socket wires through housing and bundle wires underneath the L-shaped support bracket. Do NOT pass wires through the bracket center .875 hole.
4. Replace the top cap and round decorative piece, leaving screws loose for later steps.
5. Measure desired hanging length from ceiling to top of fixture, then subtract the thickness of the canopy and add 6 inches. **Ceiling suspension length - canopy thickness + 6 inches = cord length.**
6. Strip off 4 inches of cord jacket to expose inner conductors and strip 1/2 in. from each conductor to expose copper.
7. Secure the provided strain relief bushing a minimum of 2 inches above the stripped edge of the cord. Use pliers or vice grips to crimp around the cord jacket - flat side facing up. IF ADJUST­MENT IS REQUIRED, USE FLATHEAD SCREWDRIVER TO PRY OFF BUSHING AND RECRIMP, OR CUT BUSHING OFF AND USE EXTRA ONE PROVIDED (See Figure 2C).
8. Remove the fixture cap to expose support bracket and route cord through top center hole.
9. VERIFY CORD IS ROUTED THROUGH CAP AND ANY ROUND DECORATIVE PIECES ARE ON FIXTURE! Align cord attached bushing to bracket hole and press firmly into support bracket until all three snaps engage. Flat ledge of bushing should sit flush with
bracket surface.
10.
WARNING! Possible falling hazard and risk of serious injury.
Gather both cord and socket leads into tie strap strain relief so that a minimum of two inches of cord conductors with socket conduc­tors are pulled inside tie strap. Pull tie strap tight enough to strain relieve all connections. Trim excess strap material (See Figure 1B). Make necessary conductor connections between ballast, socket and ground wires using wire nuts.
11. Separate j-box mounting pan from top of canopy by loosening the 3 side screws, twisting and removing.
II. Ceiling Installation
12. Hang mounting pan by routing j-box wires through back of pan, and using either 3.5 in. or 4.5 in. keyholes, secure to j-box (See Figure 1C).
13. Attach safety chain hook to an open hole to secure and suspend the entire assembly. Make power and ground connections using wire nuts. For EL, cap the unused 120V or 277V line from the canopy and connect the battery activation leads (small red and white wires).
14. Align the "V" notch on the outer canopy with the "V" notch inside the mounting pan. Tuck in all wires, close assembly to mounting pan and twist to engage screws into L-slots (See Figure 1D).
Figure 2C
15. Tighten screws. INSTALLATION COMPLETE.
Part No. CJ52007
©2005 Gotham Rev. B 11/07
Elevations
®
- Part II
Loading...