Goodwe EH Series, GW5000-EH, GW6000-EH, GW3600-EH User Manual

APP (iOS)Official Website APP (Android)
EH SERIES USER MANUAL
HYBRID INVERTER
TABLE OF CONTENTS
TABLE OF CONTENTS
INTRODUCTION
INSTALLATION INSTRUCTIONS
2.4.2 BATTERY WIRING CONNECTION 09
011.1 OPERATION MODES INTRODUCTION
021.2 SAFETY & WARNINGS
041.3 PRODUCT OVERVIEW
052.1 UNACCEPTABLE INSTALLATIONS
052.2 PACKING LIST
062.3 MOUNTING
062.3.1 SELECT MOUNTING LOCATION
072.3.2 MOUNTING
082.4 ELECTRICAL WIRING CONNECTION
082.4.1 PV WIRING CONNECTION
102.4.3 ON-GRID & BACK-UP CONNECTION
132.4.4 SMART METER & CT CONNECTION
142.5 DRED & REMOTE SHUDOWN CONNECTION
142.6 EARTH FAULT CONNECTION
4.1 DISCLAIMER
4.2 ERROR MESSAGE AND TROUBLESHOOTINGS
4.3 TECHNICAL PARAMETERS AND CERTIFICATES
4.4 WARNING QUICK CHECK LIST 28
4.4 CHECKING THE ELECTRICAL CONNECTION 29
MANUAL OPERATION
173.1 WIFI CONFIGURATION
183.2 PV MASTER APP OPERATION
183.3 CEI AUTO-TEST INSTRUCTION
OTHERS
INTRODUCTION INTRODUCTION
INTRODUCTION01
GoodWe EH series, also called hybrid or bidirecational solar inverters, apply to solar system with participa-
tion of PV, battery, loads and grid system for energy management. The energy produced by PV system
shall be used to optimize self-consumption, excess power charge battery and the rest power could be
exported to the grids. Battery shall discharge to support loads when PV power is insufficient to meet
self-consumption. If both PV power and battery power is insufficient, the system will take power form grid
to support loads.
Note: The introduction describes a general behavior of EH system.
The operation mode can be adjusted on GoodWe PV Master APP
based on the system layout. Below are the general operation based on
01
the system layout. Below are the general operation modes for EH
system.
1.1 OPERATION MODES INTRODUCTION
EH system normally has the following operation modes based on your configuration and layout conditions.
1.2 SAFETY & WARNING
The EH series hybrid inverter of Jiangsu GoodWe Power Supply Technology Co., Ltd. (hereinafter called
as GoodWe) strictly comply with related safety rules for product design and testing. Please read and follow
all the instructions and cautions on the hybrid inverter or user manual during installation, operation or
maintenance, as any improper operation might cause personal or damage.
SYMBOLS EXPLANATION
Caution! Failing to observe a warning indicated in this manual may result in injury.
Danger of high voltage and electric shock!
02
Danger of hot surface!
Components of the product can be recycled.
This side up! The package must always be transported, handled and stored in such a way that the arrows always point upwards.
The energy produced by the PV system is used to
optimize self-consumption. The excess energy is used to
charge the batteries, then exported to gird.
When grid fails , the system automatically switches to
Back-Up mode, the Back-Up load could be supported by
PV and battery.
When there is no PV, and the battery is sufficient , It can
supply the load with the grid together.
Battery could be charged by grid, and charge time/power
could be set flexibly on PV Master APP.
No more than six (6) identical packages being stacked on each other.
Product should not be disposed as household waste.
The package/product should be handled carefully and never be tipped over or slung.
Refer to the operating instructions.
Keep dry! The package/product must be protected from excessive humidity and must be stored under cover.
Inverter will be touchable or operable after minimum 5 minutes of being turned off or totally disconnected, in case of any electrical shock or injury.
CE Mark
INTRODUCTION
INTRODUCTION
SAFETY WARNING
Any installation and operation on hybrid inverter must be performed by qualified electricians, in compliance
with standards, wiring rules or requirements of local grid authorities or companies (like AS 4777 and
AS/NZS 3000 in Australia).
Prohibit to insert or pull the AC and DC terminals when the inverter is running.
Before any wiring connection or electrical operation on inverter, all battery and AC power must be disconnected from inverter for at least 5 minutes to make sure inverter is totally isolated to avoid electric shock.
The temperature of inverter surface might exceed 60 during working, so please make sure it is cooled down before touching it, and make sure the inverter is untouchable for children
03
Do not open inverter cover or change any components without GoodWe’s authorization, otherwise the warranty commitment for the inverter will be invalid.
Usage and operation of the inverter must follow instructions in this user manual, otherwise the protection design might be useless and warranty for the inverter will be invalid.
Appropriate methods must be adopted to protect inverter from static damage. Any damage caused by static is not warranted by GoodWe.
PV negative (PV-) and battery negative (BAT-) on inverter side is not grounded as default design. Connecting PV- or BAT- to EARTH are strictly forbidden.
1.3 PRODUCT OVERVIEW
04
Wi-Fi Reset
PV modules used on the inverter must have an IEC61730 class A rating, and the total open-circuit voltage of PV string/array is lower than the maximum rated DC input voltage of the inverter. Any damage caused by PV over-voltage is beyond warranty.
The inverter, with built-in RCMU, will exclude possibility of DC residual current to 6mA, thus in the system an external RCD (type A) can be used(30mA).
In Australia, the inverter internal switching does not maintain neutral integrity, which must be addressed by external connection arrangements like in the system connection diagram for Australia on page 16.
In Australia, output of Back-Up side in switchbox should be labeled ‘Main switch UPS supply’, the output of normal load side in switch box should be labeled ‘main switch inverter supply’.
Smart
Wi-Fi Box
Smart
DRED
Reserved
RS485
Label
Meter
INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS02
2.3 MOUNTING
2.3.1 SELECT MOUNTING LOCATION
2.1 UNACCEPTABLE INSTALLATIONS
Smart Meter
05 06
BE CONNECTED TO
For inverter’s protection and convenient maintenance, mounting location for inverter should be selected carefully based on the following rules:
Any part of this system shouldn’t block the switch and breaker to disconnected inverter from DC and AC power.
Rule 1. Inverter should be installed on a solid surface, where is suitable for inverter’s dimensions
and weight.
Rule 2. Inverter installation should stand vertically or lie on a slop by max 15° (Pic 1)
15°
Pic 1
Rule 3. Ambient temperature should be lower than 45 Rule 4. The installation of inverter should be protected under shelter from direct sunlight or bad
weather like snow, rain, lightning etc. (Pic 2)
INVERTER BATTERY CANNOT CONNECT
TO INCOMPATIBLE BATTERIES
2.2 PACKING LIST
On receiving the hybrid inverter, please check to make sure all the components as below are not missing or broken.
Wall-mounted
Inverter×1
Back Up AC Plug X1 On Grid AC Plug X1
Bracket×1
Smart Meter
& CT × 1
PE terminal × 1 Expansion bolts×4 User manual×1
PV
2
PV
2
Quick Installation
Guide×1
Direct Sunlight Exposure to Rain Exposure to SnowNo Direct Sunlight No Exposure to Rain No Exposure to Snow
Pic 2
Rule 5. Inverter should be installed at eye level for convenient maintenance. Rule 6. Product label on inverter should be clearly visible after installation. Rule 7. Leave enough space around inverter following the values on pic 3.
300mm
200mm
500mm
200mm
300mm
Pic 3
Upward----------
Downward------
Front-------------
Both sides-------
Inverter cannot be installed near flammable, explosive or strong electro-magnetic equipment.
300mm
500mm
300mm
200mm
[1]
INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS
2.3.2 MOUNTING
2.4 ELECTRICAL WIRING CONNECTION
2.4.1 PV WIRING CONNECTION
Remember that this inverter is heavy! Please be careful when lifting out from the package.
The
inverter
is suitable for mounting on concrete or other non-combustible surface only
Step 1
Wall bracket
Please use the mounting bracket as a template to drill 4 holes on right positions (10mm in diameter, and 80mm in depth) (Pic 4)
Use expansion bolts in accessory box and fix the mounting bracket onto the wall tightly
Note: Bearing capacity of the wall must be higher than 17kg, otherwise may not be able to keep inverter from dropping.
self-tapping screws
Expansion pipe
Pic 4
[3]
.
19.33
.
.
Use the right PV plugs in the accessory box
.
(BAT plugs are similar with PV plugs, please confirm before use it.)
07 08
Carry the inverter by holding the heating sink on two sides and Place the inverter on the mounting bracket. (Pic 5)
Note: Make sure the heat sink on inverter is right joint with mounting bracket.
Ground cable shall be connected to ground plate on grid side (Pic 6)
A lock could be used for anti-theft if it is necessary for individual requirement.
(Pic 7)
The polarity of PV strings or on the inverter cannot be connected by reversely, otherwise inverter could be damaged.
[3]