The following symbols and labels are used throughout this
manual to indicate immediate or potential safety hazards. It is
the owner’s and installer’s responsibility to read and comply
with all safety information and instructions accompanying these
symbols. Failure to heed safety information increases the risk
of personal injury, property damage, and/or product damage.
WARNING
HIGH VOLTAGE!
Disconnect ALL power before servicing.
Multiple power sources may be present.
Failure to do so may cause property damage,
personal injury or death.
ONLY individuals meeting the req uirements of an
“Entry Level Technician”, at a minimum, as specified
by the Air Conditioning, Heating and Refr igeration
Institute (AHRI) may use this information. Attempting
to insta ll or repair this unit withou t such backgr ound
may result in product damage, personal injury ,
or death.
tion of your nearest distributor consult the white business
pages, the yellow page section of the local telephone book or
contact:
CONSUMER AFFAIRS
GOODMAN MANUFACTURING COMPANY, L.P.
7401 SECURITY WAY
HOUSTON, TEXAS 77040
877–254–4729
Pre-Installation Instructions
Carefully read all instructions for the installation prior to installing product. Make sure each step or procedure is understood
and any special considerations are taken into account before
starting installation. Assemble all tools, hardware and supplies needed to complete the installation. Some items may
need to be purchased locally. Make sure everything needed to
install the product is on hand before starting.
Application Information
Install this coil upstream (discharge air) of the furnace and
install downstream (return air) of the air handler. This coil is bidirectional coil and can be installed in either the left or right
direction. Determine the coil direction by the side that allows
the best access.
Shipping Inspection
Upon receiving the product, inspect it for damage from shipment. Shipping damage, and subsequent investigation is the
responsibility of the carrier. Verify the model number, specifications, electrical characteristics, and accessories are correct prior to installation. The distributor or manufacturer will not
accept claims from dealers for transportation damage or installation of incorrectly shipped units.
Codes & Regulations
This product is designed and manufactured to comply with
national codes. Installation in accordance with such codes and/
or prevailing local codes/regulations is the responsibility of the
installer. The manufacturer assumes no responsibility for equipment installed in violation of any codes or regulations.
The United States Environmental Protection Agency (EPA)
has issued various regulations regarding the introduction and disposal of refrigerants. Failure to follow these
regulations may harm the environment and can lead to
the imposition of substantial fines. Should you have any
questions please contact the local office of the EPA.
Replacement Parts
When reporting shortages or damages, or ordering repair parts,
give the complete product model and serial numbers as stamped
on the product. Replacement parts for this product are available through your contractor or local distributor. For the loca-
RIGHT APPLICATIONLEFT APPLICATI ON
Figure 1
Front View (for Right & Left Hand Application)
There is no conversion required to reverse from right to left
application. Attach the duct flanges to the discharge side of
the unit. If the coil and furnace combination are not similar in
depth and width, use a field-supplied transition to center the
furnace and coil openings (see figure 3). The supplied Z-bracket
attachment should be used to attach the coil to a narrower
furnace when the furnace is one size smaller than the coil (i.e.
coil height = 17.5-inches and furnace width = 14-inches) (See
figure 3). Figure 3a indicates incorrect coil/furnace attachment method.
Duct Flange Att achment
1. Remove the shipping bracket spanning the A-Coil apex
to the rear of the wrapper on all models prior to installation.
2. The bottom duct flange for the supply plenum side is
shipped unattached. Carefully insert the flange into bottom rail and use a 5/16" screw to attach at the middle of
the flange.
IO-285K
7/2015
PLENUM
Figure 2
Horizontal Right Application
3.Using the hardware and brackets provided, attach the coil
to the furnace then attach the plenum to the coil (Figure 3).
FURNACE
TOP & BACK
BRACKET
ACCESSORY
COIL
PLENUM
FRONT BRACKET
ACCESSORY
FURNACE
MAX 10° ANGLE
TRANSITION
COIL
PLENUM
DUCT BOARD, SHEET
METAL OR OTHER
FILLER MATERIAL
FURNACE
COIL
Figure 3a
Incorrrect Furnace, Coil and Plenum Installation
Using tape or mastic seal between the coil and furnace and
the coil and plenum.
Condensate Drain Piping
When coils are installed above ceilings, or in other locations
where damage from condensate overflow may occur, it is MAN-DATORY to install a field-fabricated auxiliary drain pan under
the coil cabinet enclosure. Drain lines from the auxiliary pan
must be installed and terminated so that the homeowner can
see water discharges.
The coil drain pan has a primary and an optional secondary
drain with 3/4" NPT female connections. The connectors required can be 3/4" NPT male either PVC or metal pipe and
should be hand tightened to a torque of no more than 37 in-lbs.
to prevent damage to the drain pan connection. An insertion
depth between .355 to .485 inches (3-5 turns) should be expected at this torque. If using a copper drain line, solder a
short piece of pipe to the connector before installing a drain
fitting. DO NOT over torque the 3/4” copper connector to the
plastic drain connection.
FURNACE
TOP & BACK
BRACKET
ACCESSORY
COIL
FRONT BRACKET
ACCESSORY
Figure 3
Furnace, Coil and Plenum Installation
(Z-BRACKET WITH NARROW FURNACE)
PLENUM
1. Ensure drain pan hole is NOT obstructed.
2. To prevent potential sweating and dripping on finished
space, it may be necessary to insulate the condensate
drain line located inside the building. Use Armaflex® or
similar material.
A Secondary Condensate Drain Connection has been provided
for areas where the building codes require it. Pitch the drain
line 1/4" per foot to provide free drainage. Insulate drain lines
(primary and secondary) located inside the building to prevent
sweating. Install a condensate trap in the primary drain line to
ensure proper drainage. If the secondary line is required, run
the line separately from the primary drain and end it where it
can be easily seen.
NOTE: Water coming from this line means the coil primary
drain is plugged and needs clearing.
2
CAUTION
If secondary drain is not installed, the secondary access
must be plugged.
NOTE: Trapped lines are required by many local codes. In the
absence of any prevailing local codes, please refer to the
requirements listed in the Uniform Mechanical Building Code.
A drain trap in a draw-through application prevents air from
being drawn back through the drain line during fan operation
thus preventing condensate from draining, and if connected to
a sewer line to prevent sewer gases from being drawn into the
airstream during blower operation. In a blow-through application the drain trap prevents conditioned air from escaping. It is
permissible in this application to use a shallow trap design
sometimes referred to as a running trap.
Drain
Connection
2" MIN.
Cased Coil
Horizontal Coil W ater Blower-Off Bracket
CHPF4860 coils are shipped with an accessory kit containing
a sheet metal bracket. For horizontal-left applications where
the airflow may exceed 1600 CFM, this bracket must be
installed on the left side of the drain pan as shown in Figure 6.
POSITIVE LIQUID SEAL
REQUIRED AT TRAP
Condensate Drain Trap
Figure 4
3" MIN.
The depth of a running trap (Figure 5) should be either 1" or a
depth that permits unrestricted condensate drainage without
excessive air discharge.
Field experience has shown condensate drain traps with an
open vertical Tee between the air handler and the condensate
drain trap can improve condensate drainage in some applications, but may cause excessive air discharge out of the open
Tee. The manufacturer does not prohibit this type of drain but
we also do not recommend it due to the resulting air leakage.
Regardless of the condensate drain design used, it is the
installer’s responsibility to ensure the condensate drain system is of sufficient design to ensure proper condensate removal from the coil drain pan.
PITCH
TOWARDS
DRAIN
1” MIN
TRAP
Figure 5
Running Trap
CONDENSATE
DRAIN CONN.
CONNECT DRAIN
SAME SIZE AS ON
UNIT OR LARGER
Figure 6
Horizontal Blow-Off Bracket
Refrigerant Lines
WARNING
A quenching cloth is strongl y recommended to
prevent scorching or marring of the equipment
finish when welding close to the painted surfaces.
Use brazing alloy of 5% minimum silver content.
All cut ends are to be round, burr free, and cleaned. Any other
condition increases the chance of a refrigerant leak. Use a
pipe cutter to remove the closed end of the spun closed suction line.
To avoid overheating after brazing, quench all welded joints
with water or a wet rag.
For the correct tubing size, follow the specification for the condenser/heat pump
WARNING
The coil is shipped under press ure. Follow these
instructions to prev ent in ju ry.
CAUTION
Applying too much heat to any tube can melt the tube. Torch
heat required to braze tubes of various sizes must be
proportiona l to the s ize of th e tub e. S erv ice p ersonn el m u st
use the appropriate heat level for the size of the tube being
brazed.
NOTE: Tubes of smaller size require less heat to bring the
tube to brazing temperature before adding brazing alloy. The
use of a heat shield when brazing is recommended to avoid
burning the serial plate or the finish on the unit.
3
Special Instructions
This coil comes equipped with a check style flowrator for refrigerant management. For most installations with matching applications, no change to the flowrator orifice is required. However, in mix-matched applications, a flowrator change may be
required. See the Piston Kit Chart or consult your local distributor for details regarding mix-matched orifice sizing. If the
mix-match application requires a different piston size, change
the piston in the distributor on the indoor coil before installing
the coil and follow the procedure shown below.
1. Loosen the 13/16 nut 1 TURN ONLY to allow high pressure tracer gas to escape. No gas indicates a possible
leak.
2. After the gas has escaped, remove the nut and discard
the plastic or brass cap.
3. Remove the check piston to verify it is correct and then
replace the piston. See piston kit chart in instructions.
4. Use a tube cutter to remove the spin closure on the suction line.
5. Slide the 13/16 nut into place on the tailpiece supplied in
the literature bag or with the unit.
CAUTION
Excessive torque can cause or ifices to stick. Use the proper
torque se tting s wh en tig h ten in g orific es .
10.Replace suction line grommet and insulation.
SUCTION LINE
WITH SPIN CLOSURE
RUBBER
GROMMET
Figure 8
Suction Line Grommet
11. Check fittings for leaks after complete installation. Evacuate and charge on the low side.
NOTE: With the piston in the distributor, the seal end should
point inside the distributor body and should not be seen when
looking into the end of distributor. Make sure the piston is free
to rotate, and move up and down in the distributor body.
IMPORTANT: Note 2 in the Piston Kit Chart does not apply to
CH coils.
6. Braze tailpiece to the line set liquid tube.
Figure 7
Flowrator
7. Insert the suction line into the connection, slide the insulation and the rubber grommet at least 18" away from the
braze joint. Braze suction line.
8. AFTER THE TAILPIECE HAS COOLED, confirm position of the white Teflon® seal and hand tighten the 13/16
nut.
9. Torque the 13/16 nut to 10-25 ft-lbs. or tighten 1/6 turn.
This unit is equipped with an aluminum tube evaporator coil.
The safest way to clean the evaporator coil is to simply flush
the coil with water. This cleaning practice remains as the recommended cleaning method for both copper tube and aluminum tube residential cooling coils.
An alternate cleaning method is to use one of the products
listed in the following chart to clean the coils. The cleaners
listed are the only agents deemed safe and approved for use to
clean round tube aluminum coils.
TRADE NAME
EVAP-Green4191-08Nu-Calgon
Ex t rem e Simpl y Green A i rcraft
Prec i sion Cleaner
Approved Cleaners
NOTE: Ensure coils are rinsed well after use of any chemical
cleaners.
PART /
PRODUCT
13406Sunshine Makers, Inc.
MANUFACTURER
NOTE: SPECIFICATIONS AND PERFORMANCE DATA LISTED HEREIN ARE SUBJECT TO CHANGE WITHOUT NOTICE
Visit our website at www.daikincomfort.com, www.goodmanmfg.com or www.amana-hac.com for information on:
is a registered trademark of Maytag Corporation or its related companies and is used under license. All rights reserved.
•Customer Services
•Parts
5151 San Felipe, Suite 500, Houston, TX 77056
•Contractor Program and Training
•Financing Options
4
INSTALLATION AND OPERATING INSTRUCTIONS FOR
HORIZONTAL TWO-WAY COILS (CH SERIES)
IMPORTANT
“The United States Environmental Protection Agency (EPA) has issued various regulations regarding the
introduction and disposal of refrigerants in this unit. Failure to follow these regulations may harm the environment
and can lead to the imposition of substantial fines. These regulations may vary by jurisdiction. A certified technician
must perform the installation and service of this product. Should you have any questions, please contact the
local office of the EP A.”
This product is designed and manufactured to permit installation in accordance with national codes. It is the
installers responsibility to install this unit in accordance with national codes and / or prevailing local codes and
regulations.
APPLICATION INFORMATION
RIGHT APPLICATIONLEFT APPLICATION
FIGURE 1:
(Front View for right & left hand application)
1. Coil must be installed upstream (discharge side) of the furnace. This is a bi-directional coil and can be installed in
either direction. Determine the coil direction by the side that allows the best access.
2. If the furnace and coil are not similar in depth and width, a field-supplied transition can be used to center the furnace and
coil openings. An attachement bracket (Z-bracket) has been included to attach the coil to a narrower Goodman or
Amana furnace when the furnace is one size smaller than the coil (i.e. coil height = 17.5-inches and furnace width = 14inches) (See figure 3).
3. To reverse from right to left application, relocate the front rail to the back, and the back rail to the front. Then attach
flanges to the dicharge side of the unit.
A TT ACHING THE DUCT FLANGE
FIGURE 2:
(Horizontal right application)
BACK RAIL
FRONT RAIL
LOOSEN FASTENER AND
PULL FLA NGE FORWARD
AND RETIGHTEN
SHIPPING BR ACKET
TO BE REMOVED PRIOR
TO INSTALLATION
IO-237C2550 North Loop West, Suite 400, Houston, TX 7709206/06
•Remove the shipping bracket spanning the A-Coil apex to the rear of the wrapper on all models prior to installation.
•The bottom duct flange for the supply plenum side is shipped unattached. Carefully insert the flange into bottom rail
and use a 5/16" screw to attach at the middle of the flange.
•Attach coil to the furnace using hardware and brackets provided. (see Figure 3)
•Attach plenum to coil. (see Figure 3)
•Use tape or mastic to seal between coil and furnace, and also between coil and plenum.
FIGURE 3
(Installation of Furnace, Coil, and Plenum)
FRONT BRACKET
ACCESSORY
FURNACE
TOP & BACK
BRACKET
ACCESSORY
COIL
PLENUM
FRONT BRACKET
ACCESSORY
FURNACE
TOP & BACK
BRACKET
ACCESSORY
(Z-BRACKET WITH NARROW FURNACE)
COIL
PLENUM
Condensate Drain Piping - When coils are installed above ceilings, or in other locations where damage from condensate
overflow may occur, it is MANDATORY to install a field fabricated auxiliary drain p an under the coil cabinet enclosure. Drain
lines from the auxiliary pan must be installed and terminated so that the homeowner can see water discharges. A primary
condensate drain connection is located in the drain pan on the bottom of the coil / enclosure assembly . The female (3/4 f pt)
threaded fitting that protrudes outside of the enclosure is used for external connection.
•Ensure drainpan hole is NOT obstructed.
•To prevent potential sweating and dripping on to finished space, it may be necessary to insulate the condensate
drain line located inside the building. Use Armaflex® or similar material.
•A Secondary Condensate Drain Connection, now called for by many building codes, has been provided.
•The drain lines are to be pitched 1/4" per foot to provide free drainage. Insulate drain lines to prevent sweating.
Trapped lines are required by many local codes. In absence of any prevailing local codes, reference requirement
from the Uniform Mechanical Building Code.
•NOTE: If secondary drain is not installed, the secondary access must be plugged.
FIGURE 4
(Drain Piping Installation)
POSITIVE LIQUID SEAL REQUIRED
Air Handler
AT TRAP
Drain
Connection
2" MIN.
3" MIN.
2
WARNING
DO NOT USE THIS COIL ON OIL FURNACES OR ANY APPLICATIONS WHERE THE TEMPERATURE ON DRAIN
PAN MAY EXCEED 300°F. A FIELD FABRICATED METAL DRAIN PAN SHOULD BE USED FOR THESE TYPES OF
APPLICA TIONS. FAILURE TO FOLLOW THIS WARNING MA Y RESUL T IN PROPERTY DAMAGE AND/OR PERSONAL
INJURY.
SPECIAL INSTRUCTIONS
This indoor coil contains the flowrator distributor assembly, which consists of a nut, distributor body, copper tubes feeding
the coil, and the internal flow check piston. It is essential that the indoor and outdoor sections be properly matched. When
matching the indoor coil with other than the matching outdoor section, the flow check piston in the indoor section MUST be
changed to match with the outdoor section to obtain the rated performance as specified in our sales specification sheets. If
a piston size is too small, it causes starving; if it is too large, it causes flooding. When using a combination that requires
a different piston size, change the piston in the distributor on the indoor coil before installing the coil, and follow the procedure
shown below.
1. Loosen the 13/16 nut 1 turn only to allow the high pressure tracer gas to escape. No gas indicates a possible leak.
2. After the gas has escaped, remove the nut and discard the cap.
3. Use a tube cutter to remove the spin closure on the suction connection.
4. Remove the tail piece clamped to the exterior and slide the 13/16 nut in place.
5. Braze the tail piece to the line set liquid tube.
6. Insert the suction line into the connection , slide the insulation and the rubber grommet at least 18" away from the braze
joint.
7. After the tail piece has cooled, insert the seal and hand tighten the 13/16 nut.
8. Torque the 13/16 nut 10-30 ft/ lbs. or tighten 1/6 turn.
9. Replace suction line grommet and insulation.
CAUTION
EXCESSIVE TORQUE CAN CAUSE ORIFICES TO STICK. USE THE PROPER TORQUE SETTINGS WHEN
TIGHTENING ORIFICES.
Check fittings for leaks after complete installation. Evacuate and charge on the low side.
NOTE: With piston in distributor, the seal end should be pointing inside the distributor body and should not be seen when
looking into the end of distributor. Make sure the piston is free to rotate, and move up and down in the distributor body.
IMPORTANT
NOTE (#2) IN THE PISTON KIT CHART (PKC-XX) WILL NOT APPLY TO CH COILS. PISTON KIT NOT INCLUDED
WITH CH COILS. IT MUST BE PURCHASED FROM DISTRIBUTOR.
3
NOTE: SPECIFICA TIONS AND PERFORMANCE DATA LISTED
HEREIN ARE SUBJECT TO CHANGE WITHOUT NOTICE
Quality Makes the Difference!
All of our systems are designed and manufactured with the same high quality standards regardless of size or
efficiency . We have designed these units to significantly reduce the most frequent causes of product failure. They
are simple to service and forgiving to operate. We use quality materials and components. Finally , every unit is run
tested before it leaves the factory . That’ s why we know. . .There’s No Better Quality .
Visit our websites at www.goodmanmfg.com or amana-hac.com for information on: