Golden Lighting 8981-M1L GRM User Manual

Canopy Loop and
Crystal drops
Crystal drops
Part Needed Quantity
Reason why ( missing, scratched, broken glass, bent, bad finish)
Comments
Read and review installation instruction sheet, but do
For Customer Service, contact the place of purchase to arrange for replacement parts.
plus at least 8~10 inches. You must use at least one Rod.
Company N ame:_______________________Co. Accoun t #: _____________
to be filled o ut by retaile r
PARTS & ASSEMBLY SHEET
Fixture Name: Echelon 8981-M1L BRI / GRM
This fixture ass embled PO:__________ Da te: ________
Notice: Please review the parts listing and check for all parts before assembling the fixture. If any parts are missing or
damaged, please note on this sheet and contact the place of purchase to arrange for replacement parts.
PARTS LIST
Canopy Hex nut Wire connectors
1ea 130*H22mm 1ea 1/2"*H3mm 2ea A3 Orange
Mounting Strap
w/ ground screw 1ea 100*22*H4mm
/1ea 8/32"*H10mm
Nipple Chain connector
1ea 1/2"*H55mm 2ea 5*H58.5mm
1ea 3.8mm*L72" 2ea 8/32"*H1" 1ea 1/2"*H46mm
12" Rod
3ea 12.7*H305mm
Crystal draping A1 x 3pcs
Part Needed Quantity
Crystal draping A2 x 3pcs
B2 x 3pcs
C1 x 1pcs
Canopy loop
Crystal drops are included in parts
bag. (see crystal assembly
instruction)
FIXTURE ASSEMBLY INSTRUCTIONS
not install before assembling the fixture.
Fig 1
1. By measuring determine correct number of rods and
8981-M1L BRI / GRM
chain needed for proper hanging height. There are two optional 12" rods included.
2.To shorten the fixture t rim t he wires to t he de s ired le ngt h
3. To lengthen the fixture add addit ional r ods (ROD-8981 CH) or additional chain (CHAIN-8981), available separately.
NOTE: THE SHADE ASSEMBLY CAN BE DAMAGED BY ROUGH HANDLING. USE CARE WHEN ASSEMBLING.
These two Rods may be removed or additional Rods and/or Chain may be added.
PARTS & ASSEMBLY SHEET
4. Pull the fixture’s wire through the Rods.
links) and pull the wires until taut.
the chain-not the electrical wire.
(J) to hook (O) of shade.
specifications.
expanded view of assembly
G
CHAIN
J
H
F
E
C
Fixture Name:
5. Thread Rod (F) into Frame at (H) until tight.
6. Thread Rod (D) into Rod (F) until tight. repeat for any additional rods.
7. Feed the fixture wires through the Top loop (A) and pull the wires until taut.
8. Thread Top loop (A) into Rod (C) until tight.
9. By measuring determine correct number of links needed for proper hanging height. Use a pair of pliers to o pen one link of the Chain then remove the excess Chain and discard it.
10. Use one chain connector (A12) to att ach one end of the chain to the Top loop (A) and close t he chain connector.
Echelon 8981-M1L BRI / GRM
Fig 2
A12
A10
A9
A11
A12
T
A
11. Feed the fixture wires through the Chain (every three
.
12. Slip Canopy loop collar (A11) over the Chain, then do the same with the canopy (A9).
13. When re ady to complete the installation Use the other chain connector and attach t he ot her e nd of t he c ha in t o the canopy loop (A10) and close the chain connector.
14. Make sure the weight of the chandelier is su pport ed by
* You may now install the f ixture.
15. Place the Fabric shade (P) over the thr eaded s ocket (L) and secure in place by threading the ring (M) and Socket ring (N) on until tight. Then at tach Crystal draping
16. Install the light bulb in acc orda nc e with the f ix ture’s
(DO NOT EXCEED MAXIMUM WATTAGE RATING!)
For Customer Service, contact the place of purchase to arrange for replacement parts.
Loading...
+ 3 hidden pages