
PARTS & ASSEMBLY SHEET
Crystal drops are included in parts
Fixture Name: Echelon 8981-3P BRI / GRM
This fixture assembled PO:__________ Date: ________
Notice:
damaged, please note on this sheet and contact the place of purchase to arrange for replacement parts.
PARTS LIST
Canopy
1ea 130*H22mm 1ea 1/2"*H3mm 2ea 1/2"*H55mm
Chain Wire Connnector
Chain connector Mounting Screw Finial
2ea 5*H58.5mm 2ea 8/32"*H1" 1ea 22*H40mm
Mounting Strap
w/ ground screw
1ea 100*22*H4mm
/1ea 8/32"*H10mm
Crystal draping
A6 x 3pcs
Please review the parts listing and check for all parts before assembling the fixture. If any parts are missing or
Company Name:_______________________Co. Account #:_____________
to be filled out by retailer
Hex nut Nipple
Bottom cap
1ea 50*H56mm
Canopy Loop
bag. (see crystal assembly
instruction)
Crystal drops
D1 x 3pcs
D3 x 1pcs
Crystal drops
B2 x 9pcs
collar
1ea 1/2"*H46mm
B5 x 3pcs
C3 x 3pcs
Part Needed Quantity
Part Needed Quantity
Reason why ( missing, scratched, broken glass, bent, bad finish)
Comments
IXTURE ASSEMBLY INSTRUCTIONS
Read and review installation instruction sheet before
assembling the fixture.
1.
Feed the fixture wires through the long Threaded rod (F)
and pull the wires until taut.
2. Slide the tube (E), tube lid (D), cup (C), long Threaded
rod (F), Top cap (B), Top loop (A) down to housing of
fixture.
3. Screw Threaded rod (F) all the way into the coupler (L) at
housing of fixture. Screw Top loop (A) into Top cap (B).
NOTE: THE SHADE ASSEMBLY CAN BE DAMAGED BY
ROUGH HANDLING. USE CARE WHEN ASSEMBLING.
Fig 1
8981-3P BRI /GRM
For Customer Service, contact the place of purchase to arrange for replacement parts.

weight of the fixture is placed on it. To avoid damage attach
the Bottom Assembly parts after hanging the fixture.
5. Attach 3 crystal draping chain (G) to hook (H) of shade.
the chain-not the electrical wire.
PARTS & ASSEMBLY SHEET
Fixture Name: Echelon 8981-3P BRI / GRM
* NOTE: The Finial can be scratched or broken if the full
4. Slide the center support of the fabric shade over center
tube to the housing, it is open on one side for ease of
assembly. Secure in place by tightening Cap nut (J) to
Frame (K) with frame of shade between them (I).
6. By measuring determine correct number of links needed
for proper hanging height. Use a pair of pliers to open one
link of the Chain (A2) then remove the excess Chain (A2)
and discard it.
7. Use one chain connector(A12) to attach one end of the
chain to the Top loop (A) and close the chain connector.
Fig 2
Fig 3
8. Feed the fixture wires through the Chain (every three
links) and pull the wires until taut.
9. Slip Canopy loop collar (A11) over the chain, then do the
same with the canopy .
10. When ready to complete the installation Use the other
chain connector and attach the other end of the chain to the
canopy loop (A10) and close the chain connector.
11. Make sure the weight of the chandelier is supported by
* You may now install the fixture.
Note: Complete these remaining steps after the fixture is
hung.
12. Secure threaded nipple (P) to bushing (M) of housing
and screw Hex nut (N) on to secure.
13. Place Bottom cap (O) over the Threade nipple (P).
Fig 4
14. Screw Finial (Q) to threaded nipple (P).
15. Install the light bulbs in accordance with the fixture's
specifications.
(DO NOT EXCEED MAXIMUM WATTAGE RATING)
For Customer Service, contact the place of purchase to arrange for replacement parts.

into Mounting strap (A-4)about 4 complete turns.
CONNECTING THE WIRES (Fig 2)
should fit snugly on the Canopy loop after the canopy is installed.
INSTALLATION INSTRUCTIONS
Fixture Name: Echelon 8981-3P, 5, 9, M1L BRI / GRM
For Chandelier Light Fixture
WARNING ! SHUT OFF POWER AT FUSE OR CIRCUIT BREAKER.
HANGING THE FIXTURE (Fig.1)
1. Carefully remove the new fixture from the carton and the yellow
bag that holds all parts. Check that all parts are included as
shown in the illustration and parts list.
2. Shut off the power at the circuit breaker and remove old fixture
from ceiling, including the old mounting strap.
3. Thread Nipple(A-8) into Canopy loop (A-11) until snug. Thread
Hex nut (A-6) and Washer (A-5) on next.
4. Thread other end of the Nipple (A-8) with Canopy loop attached
5. Tighten the Washer (A-5)and Hex Nut (A-5) until snug to the
Mounting strap(A-4).
6. Take this mounting strap assembly and mount to ceiling
junction box with Mounting Screws (A-7). Tighten screws securely
with screw driver.
7. Unscrew the Canopy loop collar(A-10)from the Canopy loop.
Take the canopy and pass over the Canopy loop. approximately
one half of the canopy loop exterior threads should be exposed.
Adjust until desired height is reached. *the Canopy loop collar
Remove Canopy and Canopy loop collar.
8. Assemble the fixture and have an assistant or secure support
hold the weight of the fixture while you complete the wiring
connections.
9.Thread the fixture wires and ground wire of the assembled
fixture through the canopy loop and nipple and into the outlet box.
Fig. 1
10. Attach the power supply wires to the fixture lead wires by
connecting BLACK to BLACK (or SMOOTH) and WHITE to
WHITE (or RIBBED).
11. Attach the GROUND wire(GREEN or COPPER) from the
Junction Box and the fixture Ground wire to the green Ground
Screw on the Mounting Bracket (A-4) or connect both wires
together using the correct size of wire connectors.
NOTE: Twist the wires together in the same direction you twist
the wire connector onto the wires.
12. Tuck these wire connections neatly into the Junction Box.
FINISHING THE INSTALLATION
13. Raise Canopy (A9) to the ceiling and secure in place by
tightening the Canopy loop collar(A11) onto the Canopy Loop(10)
14. Install the light bulbs and shade as per the fixture assembly
sheet.
For Customer Service, contact the place of purchase to arrange for replacement parts.
Fig. 2
YOUR INSTALLATION IS NOW COMPLETE.
RETURN POWER TO THE JUNCTION BOX AND
TEST THE FIXTURE.