
Reason why ( missing, scratched, broken glass, bent, bad finish)
Company N ame:_______________________Co. Account #:_____________
to be filled o ut by retailer
Read and review Installation Instruction Sheet, but do
PARTS & ASSEMBLY SHEET
Fixture Name: Tetiva 8201-M1L BLK/SLV
This fixture ass embled PO:__________ Date: ________
Notice: Please review the parts listing and check for all parts before assembling the fixture. If any parts are missing or
damaged, please note on this sheet and contact the place of purchase to arrange for replacement parts.
Mounting Strap Mounting Screw
1ea L104*W24*H11mm 2ea 8/32-IP*H1" 2ea 5/32-IP*H1-1/2"
Hex Nut Wire Connector Finial
3 ea A3 Orange 2ea 3/8-IP*H9mm
Canopy
Crystal Drops Bx 8pcs
Part Needed Quantity
Part Needed Quantity
Rod Rod
3ea 12.7mmDia* H12“
Mounting
Screw
FIXTURE ASSEMBLY INSTRUCTIONS
not install before assembling the fixture as per the
8201-M1L BLK/SLV
1. Measure to determine the correct number of rods
needed for proper hanging height.
* This fixture includes 4 rods (6", 12", 12", 12")
2. To shorten the fixture, s li de t he ex cess rods off the
wires. To lengthen add additional rods.
NSTALL THE GLASS ASSEMBLY AFTER
THE FIXTURE IS HUNG.
For Customer Service, contact the place of purchase to arrange for replacement parts.
H
J
G
These three Rods (H,
I, and J) may be
removed
or
additional Rods
may be added.

Fixture Name: 8201-M1L BLK/SLV
cont.)
3. Pull the fixture’s wires through the Rods.
4. Thread Rod (J) into Frame (K) until tight.
5. Thread Rod (I) into Rod (J) until tight. repeat for any
additional rods.
6. Feed the fixture wires through the Canopy (G) and
pull the wires until taut.
7. Thread Canopy (G) into Rod (H) until tight.
* You may now install the fixture.
Note: Complete these remaining steps after the
fixture is hung.
8. Slide the Shade (N) on the Socket(M) and secure by
screwing tightly the Socket ring (L)and(U).
9. Install the light bulbs in accordance with the
fixture's specification.
10. Hang the crystals
(DO NOT EXCEED MAXIMUM WATTAGE RATING!)
I
For Customer Service, contact the place of purchase to arrange for replacement parts.

INSTALLATION INSTRUCTIONS
FINISHING THE INSTALLATION (Fig 3)
HANGING THE FIXTURE (Fig 1)
CONNECTING THE WIRES (Fig 2)
Fixture Name: Tetiva 8201-M1L BLK/SLV
WARNING ! SHUT OFF POWER AT FUSE OR CIRCUIT BREAKER.
1. Carefully remove the new fixture from the carton and
the yellow bag that holds all your parts. Check that all
parts are included as shown in the illustrations and the
Parts List.
2. Shut off power at the circuit breaker and completely
remove the old fixture from wall, including the old
mounting strap.
3. Mounting Strap (B) contains several pairs of threaded
holes. Find the pair of holes that matches the spacing of
the holes in your fixture Back Plate (E). Thread Fixture
Mounting Screws (C) half way into the Fixture Mounting
Strap (B).
4. Place the Mounting Strap (B) over the Junction Box so
the Fixture Mounting Screws (C) are vertical or horizontal,
as required by the fixture type.
5. Attach the Fixture Mounting Strap (B) to the Junction
Box using Mounting Screws (A). Securely tighten the
For Wall Mount Light Fixture
6. Attach the power supply wires to the fixture lead wires
by connecting BLACK to BLACK (or SMOOTH) and
WHITE to WHITE (or RIBBED).
7. Attach the ground wire (GREEN or COPPER) from the
Junction Box and the fixture ground wire to the green
ground screw on the Mounting Bracket (B) or connect
both wires together using the correct size of wire
connectors.
NOTE: Twist the wires together in the same direction that
you twisted the wire connector onto the wires.
8. Tuck these wire connections neatly into the Junction
Box.
9. Place the fixture Back Plate (E) over the two Mounting
Screws (C). Secure the Back Plate (E) against the wall by
threading Deco nuts (F) over the two Mounting Screws
(C) until tight as shown on Fig.1
YOUR INSTALLATION IS NOW COMPLETE. RETURN
POWER TO THE JUNCTION BOX AND TEST THE
For Customer Service, please contact the place of purchase to arrange for replacements.