Golden Lighting 8118-SF PW User Manual

PARTS & ASSEMBLY SHEET
Notice:
Company Name:_______________________Co. Account #:_____________
Canopy loop
Fixture Name: Alston Place 8118-SF BUS
This fixture assembled PO:__________ Date: ________
Please review the parts listing and check for all parts before assembling the fixture. If any parts are missing or
damaged, please note on this sheet and contact the place of purchase to arrange for replacement parts.
PARTS LIST
Canopy Mounting Screws Top Loop
1ea 5-3/4"*H1-1/2" 4ea 8#32-IP*1" 1ea 1/8-IP*H60mm
Chain Wire connectors Mounting Strap
1ea 6ft 3.8 3ea P3 Orange 1ea W4-1/8"*E1"*H5mm
Chain Connector
2ea 5.8*H61mm 1ea 1-1/8"*H42mm 1ea 1/4-IP*H60mm
Cap Nipple
1ea 1-1/2"*H5mm 1ea 1/8-IP*H35mm 1ea 1/8-IP"*H15mm
Finial Nipple Deco Nut
1ea 1-1/4"*H49mm 1ea 1/8-IP*H85mm
Mounting Strap Hex Nut Mounting Screws
1ea ∅4"*H2mm 2ea 5/32-IP*H3mm 2ea 5/32-IP*2-1/2"
Part Needed Quantity Part Needed Quantity
Reason why (missing, scratched, broken glass, bent, bad finish) Comments
to be filled out b y retailer
with Collar
Nipple
Connector
2ea 5/32-IP*H10mm
FIXTURE ASSEMBLY INSTRUCTIONS
Read and review installation instruction sheet before assembling the fixture.
ASSEMBLING THE FIXTURE as Semi-flush (Fig. 1)
1. Thread Nipple (T) into Connector (R). Slide Glass Shade (S), then Cap (U) onto Nipple (T). Thread connector (V) until tight.
2. Thread Nipple (W) into connector (V). Put Cap (X) onto Nipple (W) and use Finial (Y) to tighten.
3. Install the light bulbs in accordance with the fixture's specification. DO NOT EXCEED MAXIMUM WATTAGE RATING!
NOTE: INSTALL THE GLASS ASSEMBLY AFTER THE FIXTURE IS HUNG.
For Customer Service, contact the place of purchase to arrange for replacement parts.
Fig. 1
8118-SF BUS
PARTS & ASSEMBLY SHEET
Fixture Name: Alston Place 8118-SF BUS
ASSEMBLING THE FIXTURE as Chain hung (Fig. 2)
1. Remove the circular strap from top of fixture. Replace the long mounting screws with two short screws to hold the Deco Nuts (E) in place on the fixture Top Cap (D).
2. Feed the fixture wires through the Top Loop (F) and pull the wires until taut. Then screw the Top Loop (F) to the coupling on the top of fixture until tight.
3. By measuring, determine correct number of links needed for proper hanging height. Use a pair of pliers to open one link of the Chain (C2) then remove the excess Chain (C2) and discard it.
4. Use a chain connector (E2) to attach one end of the chain to the Top loop (F) and close the chain connector.
5. Feed the fixture wires through the chain (every three links) and pull the wires until taut.
6. Slip Canopy Loop Collar (B2) over the chain, then do the same with the canopy (F2).
7. When ready to complete the installation Use the other chain connector and attach the other end of the chain to the canopy loop (A2) and close the chain connector.
8. Make sure the weight of the chandelier is supported by the chain - not the electrical wire. * You may now hang the fixture
Fig. 2
F2
A2
B2
E2
C2
F
D
E
NOTE: INSTALL THE GLASS ASSEMBLY AFTER THE FIXTURE IS HUNG.
Complete the steps 1~3 as in Fig. 1 (ASSEMBLING THE FIXTURE as Semi-flush)
For Customer Service, contact the place of purchase to arrange for replacement parts.
Loading...
+ 2 hidden pages