
3. Attach a Chain connector (R) to the top end of the
PARTS & ASSEMBLY SHEET
Fixture Name: Torbellino 8106-10 CDB
This fixture assembled PO:__________ Date: ________
Notice:
missing or damaged, please note onthis sheet and contact the place of purchase to arrange for
replacement parts.
PARTS LIST
1ea Φ360*32H*0.8t 2ea Φ19*5tmm 1ea Φ23*6H*0.6t
Chain
2ea 10ft 1ea 4'18T*50L 3ea Orange
Chain
connector
2ea 23.8*59mm 1ea 100mm*20mm 1ea Φ9*10mm
Deco Nut
1ea SΦ22*18H 2ea 8/32T*1-1/4"L
Part Needed Quantity
Please review the parts listing and check for all parts before assembling the fixture. If any parts are
Company Name:_______________________Co. Account #:_____________
to be filled out by retailer
Nipple or
Threaded rod
Mounting strap
Mounting
screws
Wire connectors
Part Needed Quantity
Reason why ( missing, scratched, broken glass, bent, bad finish)
Comments
IXTURE ASSEMBLY INSTRUCTIONS
Read and review installation instruction sheet before
assembling the fixture.
Fig 1
8106-10 CDB
1. By measuring determine correct number of links
needed for proper hanging height. Use a pair of
pliers to open one link of the Chain (J) then remove
the excess chain (J) and discard it.
2. Use Chain connector (R) to attach the Top loop
(K) to one end of chain (J) and close the connector
as shown. (disregard if the Top loop is already
attached to one end of chain)
Chain (J). Repeat steps 1thru 3 for the second
chain.
NOTE: I
NSTALL THE GLASS ASSEMBLY
AFTER THE FIXTURE IS HUNG.
For Customer Service, contact the place of purchase to arrange for replacement parts.

For Customer Service, contact the place of purchase to arrange for replacement parts.
supported by the chain-not the electrical wire.
PARTS & ASSEMBLY SHEET
Fixture Name: Torbellino 8106-10 CDB
4. Slip the Top Loop (K) over top curve of the fixture
Frame (L). Lace the fixture’s wire through the Top
loop (K) and the chain links (J) (every three links)
and pull until taut.
5. Use Chain connector (R) to attach the top of
Chain (J) to the Canopy loop (I) and close the chain
connector as shown.
6. Make sure the weight of the chandelier is
* You may now install the fixture.
Fig 2
Note: Complete these remaining steps after the
fixture is hung.
7. Place the Glass Shade (N) over the Threaded
Socket (M),place the Socket washer (O) over the
threaded socket (M) then secure the Glass Shade
(N) by threading by the Socket Ring (P) until tight.
8. Install the light bulbs in accordance with the
fixture's specifications.
(DO NOT EXCEED THE MAXIMUM WATTAGE RATING)
Fig 3

INSTALLATION INSTRUCTIONS
11. Place the fixture canopy (F), over the threaded rod (D), so it
2. Shut off the power at the circuit breaker and remove old fixture
Tighten the screws (B) securely with screw driver.
Fixture Name:
Torbellino 8106-10 CDB
WARNING ! SHUT OFF POWER AT FUSE OR CIRCUIT BREAKER.
HANGING THE FIXTURE (Fig.1)
1. Carefully remove the new fixture from the carton and the
yellow bag that holds all parts. Check that all parts are included
as shown in the illustration and parts list.
from ceiling, including the old mounting strap.
3.Thread the Nipple (D) into the Mounting Strap (C). Place Lock
Washer (B) over end of Nipple (D) protruding through Mounting
Strap (C) and thread Hex Nuts (A) onto Nipple until tight.
4. The Mounting Strap (C) contains several pairs of threaded
holes, find the pair of holes that match the holes spacing in your
fixture Canopy (F) and thread the two Mounting Screws (E) half
way into the Mounting Strap (C).
5. Place the Mounting Strap (C)over the Junction Box so the
Mounting Screws (E) are vertical or horizontal, as required by
fixture type and fasten using the two mounting screws (B).
6. Assemble the fixture and have an assistant or secure support
hold the weight of the fixture while you complete the wiring
connections.
7.Thread the fixture wires and ground wire of the assembled
fixture through the canopy loop and into the outlet box.
CONNECTING THE WIRES (Fig 2)
8. Attach the power supply wires to the fixture lead wires by
connecting BLACK to BLACK (or SMOOTH) and WHITE to
For Chandelier Light Fixture
Fig. 1
R
J
Fig. 2
JUNCTION BOX
(CEILING)
A
B
C
D
E
F
A
G
H
9. Attach the GROUND wire(GREEN or COPPER) from the
Junction Box and the fixture Ground wire to the green Ground
Screw on the Mounting Bracket (C) or connect both wires
together using the correct size of wire connectors.
NOTE: Twist the wires together in the same direction you twist
the wire connector onto the wires.
10. Tuck these wire connections neatly into the Junction Box.
FINISHING THE INSTALLATION (Fig.3)
protrudes through the hole in the Canopy (J). Thread the Cap
(G) and Deco Nut (H) onto the threaded rod and continue
turning until the Canopy (F) is snug against the ceiling.
12. Install the light bulbs and glass shade as per the fixture
assembly sheet.
YOUR INSTALLATION IS NOW COMPLETE. RETURN
POWER TO THE JUNCTION BOX AND TEST THE FIXTURE.
For Customer Service, contact the place of purchase to arrange for replacement parts.
Fig. 3
D
E
F
A
G
R
J
H