Golden Lighting 7644-SF GA User Manual

Mounting strap (circular)
2ea @3/8 x 3mm 1ea @3/8 x 65mm
Mounting strap
3 pcs
Part Needed Quantity
Reason why ( missing, scratched, broken glass, bent, bad finish)
Comments
This fixture assembled PO:__________ Date: ________
to be filled out by retailer
For Customer Service, contact the place of purchase to arrange for replacement parts.
Company Name:_______________________Co. Account #:_____________
Fig. 1
PARTS & ASSEMBLY SHEET
Read and review installation instruction sheet before assembling the fixture.
F
Notice:
Decorative Chain
b
b
a
a
M
N
E
O
Q
Fixture Name: Mirabella 7644-SF GA
Please review the parts listing and check for all parts before assembling the fixture. If any parts are missing or
damaged, please note onthis sheet and contact the place of purchase to arrange for replacement parts.
PARTS LIST
Wire connectors Deco nut
1ea @4" 3ea P4 Orange 5ea 10x 9.5mm
Canopy
1ea @5-5/8"X1-5/8" 2ea 8/32" x 1" 1ea @3/8 x 50mm
Chain Mounting screw
1ea 6ft x3.8mm 2ea 8/32" x 1-1/4" 1ea @3/8 x 40mm x 5mm
Chain connector Hex nut Nipple
2ea @3X38mm
w/ ground screw 1ea 3/4"X4" 2ea @8/32" x 8mm
Part Needed Quantity
Screw
Top loop
Canopy loop with Collar
(CRYSET-7644-SF)
IXTURE ASSEMBLY INSTRUCTIONS

7644-SF GA

ASSEMBLING THE FIXTURE as Semi flush (Fig. 1)
1. Place shade (N) over the nipple of the Frame (M) and secure with Deco Nut (E).
2. Attach hooks at both ends of the Decorative Chain (O) to Frame (M) as shown in the diagram.
3. Install the light bulbs in accordance with the fixture's specifications.
(DO NOT EXCEED MAXIMUM WATTAGE RATING)
7644-SF GA PartsInstallation_20120406m(ok)
For Customer Service, contact the place of purchase to arrange for replacement parts.
Fig 2
PARTS & ASSEMBLY SHEET
C
D
b
b
a
a
M
N
E
O
E
P
Q
Fixture Name: Mirabella 7644-SF GA
ASSEMBLING THE FIXTURE as Chain hung (Fig. 2)
1. Remove the Circular st r ap from top of Fixture and replace the long mounting s cr ew s with two short screws to hold the Deco nuts (E) in place on the fixture Bottomop cap (M).
2. Feed the fixture wires thr ough the Top loop (J) and pull the wires until taut.
3. Then screw the Top Loop (J) to the threaded center column of Frame (M) until tight.
4. Place shade (N) over t he nipple of the Frame (M) and secure Deco Nut (E).
5. By measuring determine correct number of links needed for proper hanging height. Use a pair of pliers to open one link of the Chain (K) then remove the excess Chain (K) and discard it.
6. Use one chain connector (L) to attach one end of the chain to the Top loop (J) and close the chain connector.
7. Feed the fixture wires thr ough the Chain (every three links) and pull the wires until t aut.
8. Slip Canopy loop collar (H) over the chain, then do the same with the canopy ( G).
9. When ready to complete the installation Use the other chain connector and attach the other end of the chain to the canopy loop (F) and close the chain connector.
10. Make sure the weight of the chandelier will be supported by the chain-not the electrical wire.
* You may now install the fixture. Note: Complete these remaining steps after the fixture is hung.
11. Pull the straight edges of the hook that sits at the end of decorative chain (N) outward until it opens, insert crystal ball (Q) into the opening and then close the hook by pressing the edges together over the loop at the top of the crystal as shown in the diagram.
12. Install the light bulbs (not provided) in accordance with the fixture's specifications.
(DO NOT EXCEED MAXIMUM WATTAGE RATING)
7644-SF GA PartsInstallation_20120406m(ok)
Loading...
+ 2 hidden pages