Golden Lighting 7158-9 PWRBZ User Manual

Page 1
Part Needed Quantity
Reason why ( missing, scratched, broken glass, bent, bad finish)
Comments
For Customer Service, contact the place of purchase to arrange for replacement parts.
Read and review installation instruction sheet before assembling the fixture.
PARTS & ASSEMBLY SHEET
Notice:
Company Name:_______________________Co. Account #:_____________
to be filled out by retailer
Fixture Name: Accurian 7158-9 PW/RBZ
This fixture assembled PO:__________ Date: ________
Please review the parts listing and check for all parts before assembling the fixture. If any parts are missing or
damaged, please note onthis sheet and contact the place of purchase to arrange for replacement parts.
PARTS LIST
Canopy Wire connectors Top loop
1ea @5"X1" 3ea P3 Orange 1ea 80X38X26mm
Chain
1ea 6ft x3.8mm 2ea 8/32" x 1" 1ea Φ15X3mm
Chain connector Hex Key
Mounting Strap w/ ground screw
1ea 100X20X4.5mm 2ea @3/8 x 4mm
Part Needed Quantity
IXTURE ASSEMBLY INSTRUCTIONS
F
Junction Box Screw
Canopy Loop with Collar
Hex Nut Socket tool
Spring Washer
1ea
7158-9 PW/ RBZ
Fig. 1
ASSEMBLING THE FIXTURE (Fig. 1)
1. Gently spread the arms until evenly spaced if arms are packed closed.
2. Thread the fixture Center column (T) into the housing nipple (S).
NOTE: INSTALL THE GLASS ASSEMBLY AFTER THE FIXTURE IS HUNG.
Page 2
PARTS & ASSEMBLY SHEET
A-A'
D
C
A-A'
Fixture Name: Accurian 7158-9 PW/RBZ
3. Slide the Decorative Rods (R) into the bracket on Arms (V),and tighten the Screws (U) with Hex Key (O) (See Detail: A-A")
4. Insert the Decorative Rods (R) into the holes on Top cap housing (M). Turn housing to one side to allow easier access, turn back to secure rods in place
5. By measuring determine correct number of links needed for proper hanging height. Use a pair of pliers to open one link of the Chain (K) then remove the excess Chain (K) and discard it.
6. Use one chain connector (L) to attach one end of the chain to the Top loop (J) and close the chain connector.
7. Feed the fixture wires through the Chain (every three links) and pull the wires until taut.
8. Slip Canopy loop collar (H) over the chain, then do the same with the canopy (G).
9. When ready to complete the installation Use the other chain connector and attach the other end of the chain to the canopy loop (F) and close the chain connector.
10. Make sure the weight of the chandelier will be supported by the chain-not the electrical wire.
* You may now install the fixture. Note: Complete these remaining steps after the fixture is hung.
11. Slide Glass Shade (P) onto Threaded Socket (Q). and secure the Glass Shade (P) by using Socket Tool (W) to thread Socket Ring (N) to Socket tightly.
12. Install the light bulbs in accordance with the fixture's specifications.
(DO NOT EXCEED MAXIMUM WATTAGE RATING) )
Fig 2
For Customer Service, contact the place of purchase to arrange for replacement parts.
Page 3
Fig. 1
For Customer Service, contact the place of purchase to arrange for replacement parts.
L
B
C
A
JUNCTION BOX (CEILING)
D
E F
H
J
CHAIN
G
BARE COPPER
(Ground)
GREEN (Ground)
FIXTURE WIRES
SMOOTH (BLACK)
RIBBED (WHITE)
BLACK
WHITE
HOUSE WIRES
HANGING THE FIXTURE (Fig. 1)
1. Carefully remove the new fixtur e from the carton and the yellow bag that holds all parts. Check that all parts are included as shown in the illustration and parts list.
2. Shut off the power at the circuit breaker and rem ove old fix ture from ceiling, including the old m ounting s tr ap.
3. Thread Nipple (C) into Canopy Loop (F) until snug.
4. Thread other end of the Nipple (C) with Canopy Loop attac hed into Mounting Strap (D).
5. Place Lock Washer (B) over end of Nipple (C) protruding through Mounting Strap (D) and thread Hex Nuts (A) onto Nipple until tight.
6. Take this mounting strap assem bly and mount to ceiling junction box with junction box Screws (E). Tighten screw securely with screw driver.
7. Unscrew the Canopy loop collar (H )from the Canopy loop. Take the canopy and pass over the Canopy loop. approx imatly one half of the canopy loop exterior threads s hould be expos ed. Adjus t until desired height is reached. *the Canopy loop collar should fit snugly on the Canopy loop after the canopy is installed. Remove Canopy and Canopy lock collar.
8. Assemble the fixture and have an assis tant or sec ure support hold the weight of the fixture while you complete the wiring connec tions .
9. Thread the fixture wires and ground wire of the ass embled fixture through the canopy loop and nipple and into the outlet box .
CONNECTING THE WIRES (Fig. 2)
10. Attach the power supply wires to the fixture lead wires by connecting BLACK to BLACK (or SMOOTH) and WHITE to WHITE (or RIBBED).
11. Attach the GROUND wire(GREEN or COPPER) from the Junction Box and the fixture Ground wire to the green G round Sc rew on the Mounting Bracket (D) or connect both wires together us ing the correct size of wire connectors. NOTE: Twist the wires together in the same direction you twist the wire connector onto the wires.
12. Tuck these wire connections neatly into the J unc tion Box.
13. Raise Canopy (G) to the ceiling and secure in place by tightening the Canopy loop collar ( H) into the Canopy Loop ( F) .
14. Install the light bulbs and shade as per the fixture ass embly sheet.
INSTALLATION INSTRUCTIONS
Fixture Name: Accurian 7158-3P/5/9/D5/ND3 PW/RBZ
For Chandelier Light Fixture
WARNING ! SHUT OFF POWER AT FUSE OR CIRCUIT BREAKER.
Fig. 2
YOUR INSTALLATION IS NOW
COMPLETE. RETURN POWER TO THE
JUNCTION BOX AND TEST THE
FIXTURE.
Loading...