Golden Lighting 7116-M1L LC User Manual

NOTE: I
NSTALL THE GLASS ASSEMBLY AFTER
THE FIXTURE IS HUNG.
PARTS & ASSEMBLY SHEET
needed for proper hanging height. There are 2 ft of chain and
additional Rods may be
additional chain may be
Fixture Name: Mayfair 7116-M1L LC
This fixture assembled PO:__________ Date: ________
Notice:
damaged, please note onthis sheet and contact the place of purchase to arrange for replacement parts.
PARTS LIST
Canopy Mounting Screws Top loop
1ea 5-3/4"*H1-1/2" 2ea 8#32-IP*1" 1ea 1/8-IP*H60mm
Chain Wire connectors Nipple
1ea 6ft 3.8 3ea P3 Orange 1ea 1/4-IP*H60mm
Chain connector
2ea 5.8*H61mm 1ea 1-1/8"*H42mm 1ea W4-1/8"*E1"*H5mm
Rod
3ea 11.7*H12" 3ea 2-1/4"*H5-1/2"
Part Needed Quantity
Part Needed Quantity Reason why ( missing, scratched, broken glass, bent, bad finish) Comments
Please review the parts listing and check for all parts before assembling the fixture. If any parts are missing or
Company Name:_______________________Co. Account #:_____________
to be filled out by retailer
Canopy loop with Collar
Arm
Mounting strap
Deco Nut
3ea 5/32-IP*H9mm
F
IXTURE ASSEMBLY INSTRUCTIONS
Read and review installation instruction sheet before assembling the fixture.
ASSEMBLING THE FIXTURE (Fig 1)
1. By measuring determine correct number of rods and chain
2 optional 12" rods included.
2. To shorten the fixture slide the excess 12" rods off the wire.
3. To lengthen the fixture thread the additional rods onto the wire or substitute longer chain for the 2 foot length included.
7116-M1L LC
Fig 1
These two Rods may be removed or
added. ROD-12 LC * or
added. CHAIN-LC* *available for purchase separately
7116-PartsInstallation_20110106m.xls
PARTS & ASSEMBLY SHEET
10. Slip Canopy loop collar (B2) over the chain, then do the
Fixture Name: Mayfair 7116-M1L LC
ASSEMBLING THE FIXTURE (Fig 2)
4. Tuck the inside of each Scroll arm into the slot in fixture frame, align the top of Scroll arm (X) over the arm connector screws (Y)* at top of socket assembly and secure in place with the Deco nuts (Y). alternate version may use Deco screws in place of nuts.
5. Feed the fixture wires through the Rods (V, T, M) and Top loop (J) and pull the wires until taut.
6. Then screw the Top Loop (J) to the threaded center column of Frame (M) until tight.
7. By measuring determine correct number of links needed for proper hanging height. Use a pair of pliers to open one link of the Chain (C2) then remove the excess Chain (C2) and discard it.
8. Use one chain connector(E2) to attach one end of the chain to the Top loop (D2) and close the chain connector.
Fig 2
Fig 3
9. Feed the fixture wires through the Chain (every three links) and pull the wires until taut.
same with the canopy.
11. When ready to complete the installation Use the other chain connector and attach the other end of the chain to the canopy loop (A2) and close the chain connector.
12. Make sure the weight of the chandelier will be supported by the chain-not the electrical wire. * You may now install the fixture.
Note: Complete these remaining steps after the fixture is hung.
13. Place the Glass Shades(O) over the Threaded sockets(P), secure the Glass Shades (O) by threading by the Socket Rings (N) until tight.
14. Install the light bulbs in accordance with the fixture's specifications.
(DO NOT EXCEED MAXIMUM WATTAGE RATING)
7116-PartsInstallation_20110106m.xls
Loading...
+ 1 hidden pages