
Reason why ( missing, scratched, broken glass, bent, bad finish)
Metal washer &
plastic washer
2ea ∅1-1/2"*H2mm
PARTS & ASSEMBLY SHEET
Company Name:_______________________Co. Account #:_____________
Fixture Name: Rockefeller 2488-17 FI & 3711-17 CB
This fixture assembled PO:__________ Date: ________
Please review the parts listing and check for all parts before assembling the fixture. If any parts are
missing or damaged, please note onthis sheet and contact the place of purchase to arrange for replacement
parts.
PARTS LIST
1ea W37/8"*E1"*10mm
Hex Nut
1ea
1/8-IP*H4mm
1ea
2ea
Part Needed Quantity
to be filled out by retailer
1/8-27-IP*H32mm
Bottom cap
1ea
2-1/4"*H36mm
2ea
3ea
P3
2ea
8#32-IP*1"
FIXTURE ASSEMBLY INSTRUCTIONS
Read and review installation instruction sheet
before assembling the fixture.
2488-17 FI & 3711-17 CB
Fig 1
1. Thread the Nipple (K) into the Ceiling pan (J)
coupler and secure with Hex nut attached.
2. Install the light bulbs in accordance with the
fixture's specifications.
3. Place the Glass shade (L) over the Ceiling pan
(J) allowing the Nipple (K) to protrude through the
bottom hole in the glass. Place the Plastic washer
and Metal washer over the Nipple (K) tighten with
Hex Nut (I), slide Bottom cap (J) over Nipple (K)
and tighten with Finial (K).
(DO NOT EXCEED MAXIMUM WATTAGE RATING!)
NSTALL THE GLASS ASSEMBLY
AFTER THE FIXTURE IS HUNG.
For Customer Service, contact the place of purchase to arrange for replacement parts.
2488,3711-FM PartsInstallaton_20120313Rev.xls

INSTALLATION INSTRUCTIONS
yellow bag that holes all your parts. Check that all parts are
Fixture Name: Rockefeller 2488-17 FI & 3711-17 CB
For Flush Mount Light Fix t ur e
WARNING ! SHUT OFF POWER AT FUSE OR CIRCUIT BREAKER.
HANGING THE FIXTURE (Fig 1)
1.Carefully remove the new fixture from the carton and the
included as shown in the illustration and parts list.
2. Shut off power at the circuit breaker and remove the old
fixture from ceiling, including the old mounting strap.
3. Thread the two Fixture Mounting Screws ( G ) into the
pre-drilled Holes in the Mounting Strap (E) spaced the
same distance apart as the holes in the Ceiling Pan.
Secure in place with Hex nuts (F).
4. Attach Mounting Strap ( E ) to the junction box using the
two Mounting Screws ( D )
CONNECTING THE WIRES (Fig 2)
5. Attach the power supply wires to the fixture lead wires
by connecting BLACK to BLACK (or SMOOTH) and
WHITE to WHITE (or RIBBED).
6. Attach the GROUND wire(GREEN or COPPER) from
the Junction Box and the fixture Ground wire to the green
Ground Screw (L) on the Mounting Bracket (E) or connect
both wires together using the correct size of wire
connectors. NOTE: Twist the wires together in the same
direction you twist the wire connector onto the wires.
7. Tuck these wire connections neatly into the Junction
Box.
Fig. 1
Fig. 2
FINISHING THE INSTALLATION (Fig 3)
8. Finish mounting the Ceiling Pan (J) by placing it over the
Mounting Strap (E). Rotate the Pan until the Mounting
screws (G) protrude through the “Keyholes” located in the
bottom of Ceiling Pan (J). Using a screw driver, secure the
Ceiling Pan (J) by screwing Mounting Screws (G) until taut.
9. Install the light bulbs in accordance to the fixture’s
specifications.
10. Install the glass shade as per the assembly
instructions.
YOUR INSTALLATION IS NOW COMPLETE.
RETURN POWER TO THE JUNCTION BOX AND TEST
THE FIXTURE.
For Customer Service, contact the place of purchase to arrange for replacement parts.
Fig. 3