For Customer Service, contact the place of purchase to arrange for replacement parts.
This fixture assembled PO: Date:
Fixture Name: SMYTH 2073-LP GMT
Notice: Please review the Pa rts List and check f or a ll part s before assembling t he fixture. If any
are missing or damaged, please note on this sheet and contact the place of purchase
to arrange for replacement parts.
Company Name:______________ Co Account#:__________
below to be filled out by retailer
_________________________ Quantity _________________________________
rods needed for proper hanging height. There are
th. Please add at least 8~10 inches to
) into
Rod (H) until tight.
parts
PARTS LIST
PART S & ASSEMBLY SHEET
Mounting Strap
3/4"*1" 1ea
Wire Connectors
Orange 3ea
Canopy 1
L298*W115*H30 ㎜
1ea
” Rod Φ 12*L305
6ea
22*50mm 5ea
㎜ 1ea
㎜ 2ea
Part Needed ______________________________ Quantity _________________________________
Part Needed _____
Reason why (missing, scratched, broken glass, bent, bad finish)
Comments __________________________________________________________________________
FIXTURE ASSEMBL Y INSTRUCTIONS
Read and review installation instruction sheet
before assembling the fixture
1. Measure to determine the correct number of
3 optional 12" rods and a 6” rod included
side.
2. To shorten the fixture, trim the wires to the
desired leng
the desired length when measuring and keep in
mind that you must use at least the 6” rods
3. To lengthen the fixture, add additiona l r ods.
(ROD-12 CDB) are available.
the retailer.
4. Pull the fixture’s wire through the rods.
5. Place Washers (I) between Rod (H) and Frame
(S). Thread Rod (H) into Fram e(S) until tig ht.
6. Place Washers (I) between each rod to
connect.
7. Feed the fixture wire th ro ugh Canopy (F) and
pull the wires until taut and thread Canopy (F
㎜
2ea H38㎜2ea
Nut
16*15 ㎜ 1ea
” Rod Φ12*L152㎜
ea
2073-LP GMT PARTS AND ASSEMBLY SHEETS
F For Customer Service, contact the place of purchase to arrange for replacement parts.
INSTALLATION INSTRUCTIONS
Fixture Name: S MYTH 2073-4 GMT
For Pendant Light Fixture
HANGING THE FIXTURE (Fig.1)
YOUR INSTALLATION IS NOW COMPLETE.
RETURN POWER TO THE JUNCTION BOX
E
D
JUNCTION BOX
(CEILING)
A
C
B
H
F
G
WARNING! SHUT POWER OFF AT FUSE OR CIRCUIT BREAKER
1. Carefully remove the new fixture from the carton and the
yellow bag that holds all parts. Check that all parts are
included as shown in the illustrations and the Parts List.
2. Shut off the power at the circuit breaker and remove the
old fixture from ceiling, including the mounting strap.
3. Place Lock Washer (B) over end of Nipple (C) which should
protrude through Mounting Strap (D). Thread Hex Nuts (A)
onto nipple (C) until tight.
4. Take this mounting strap assembly and mount to ceiling
Junction Box with Junction Box Screws (E). Tighten screw
securely with screw driver.
5. Assembly the fixture and have an assistant or secure a
support to hold the weight of the fixture while yo u complete
the wiring connections.
6. Thread the fixture wires and ground wire of the assembled
fixture through the chain loops, Canopy Loop (F), Nipple
(C) and up into the Junction Box.
CONNECTING THE WIRES (Fig.2)
7. Attach the power supply wires to the fixture lead wires by
connecting BLACK to BLACK (or SMOOTH) and WHITE to
WHITE ( or RIBBED) .
Ground wire connection: Connect fixture ground
8.
Wire to supply ground wire (this usually has green
insulation) with wire connector. If there is no supply
ground wire at ceiling junction box then attach fixture
ground wire securely onto the green grounding screw
located at mounting bar.
NOTE: Twist the wires together in the same direction you
twisted the wire connector onto the wires.
9. Tuck these wire connections neatly into the ceiling
Junction Box.
10. Place the fixture Canopy (F) over the nipple (C) and
secure Canopy (F) against the ceiling by threading Nut (G)
over the Nipple (C) until tight.
11. Install the light bulbs and glass shade as per the Parts and
Assembly Sheet.
WIRES
SMOOTH
(Or Black)
RIBBED
AND TEST THE FI XTURE
2073-LP GMT INSTALLATION INSTRUCTIONS PART 1
WIRES
BLACK
(Hot)
WHITE