Golden Lighting 2049-6 FB User Manual

Part Needed Quantity
Reason why ( missing, scratched, broken glass, bent, bad finish)
Comments
Center Column (L)
Wire Connectors
Chain Connector (I)
Mounting Strap (D)
Company Name:_______________________Co. Account #:_____________
to be filled out by retailer
Green Ground Screw
Screw Collar Loop (F)
PARTS & ASSEMBLY SHEET
Read and review installation instruction sheet before
For Customer Service, contact the place of purchase to arrange for replacement parts.
Fixture Name: Valencia 2049-6 FB
This fixture assembled PO:__________ Date: ________
Notice: Please review the parts listing and check for all pa rts before as sembling the fixture. If any parts are miss ing or
damaged, please note on this s heet a nd c ontac t the place of purchase to arrange for replacement parts.
PARTS LIST
Canopy (G)
1ea 5.2" Dia*1.1"
Chain
1ea 6FT*Φ4.2mm
2 ea Φ4*H55mm
1ea 3/4"*1"
Top Loop (J)
1ea W44*H69mm
Bottom Cap (P)
1ea W38*H22mm
Part Needed Quantity
Hex Nut (B)
2ea 3/8"*H3mm
Threaded Ring (H)
1ea Φ23-16T*H5mm
1ea 3/8"*H42.4mm
1ea #8-32N*H10mm
Crystal (S)
6ea W21*75Lmm
Finial ( R)
1ea W27xH37mm
Nipple (C)
Junction Box Screw (E)
2ea #8-32N*H32mm
3ea P3
1ea W32xH95mm
Threaded Rod (N)
1ea 3/8"*H440mm Glass 4ea W135*H415mm one smaller

FIXTURE ASSEMBLY INSTRUCTIONS

assembling the fixture.
Fig. 1
1. Remove the Top cap (K) off the center column, slide the three glass panels (M) down through the top of the box frame and secure with metal clips.
2. Replace the top cap, open the doop to place the smaller glass panel (M), secure with clips.
2049-6 FB
NOTE: INSTALL THE GLASS ASSEMBLY BEFORE
THE FIXTURE IS HUNG.
PARTS & ASSEMBLY SHEET
Fixture Name: Valencia 2049-6 FB
ASSEMBLING THE FIXTURE (Fig. 2)
3. Place and tighten the Threaded Nipple (N) on top of hex nut (O). Then slide the Center Column (L) along with the glass cage on top of each other accordingly. Settle the Top cap (K) in place.
4. Then tighten everything together with the Top Loop (J).
NOTE: SOME ADJUSTMENT MAYBE NEEDED ON THE DECORATIVE METAL SCROLLING OF THE ARMS. THESE ARE FLEXIBLE, BEND GENTLY TO DESIRED SHAPE.
5. By measuring determine correct number of links needed for proper hanging height. Use a pair of pliers to open one link of the Chain then remove the excess Chain and discard it.
6. Use one Chain Connector (I) to attach one end of the Chain to the Top Loop (J) and close the Chain Connector (I)
7. Feed the fixture wires through the Chain (every three links) and pull the wires until taut.
8. Slip Canopy Loop Collar (F) over the chain, and then do the same with the Canopy (G).
9. When ready to complete the installation, Use the other chain connector and attach the other end of the chain to the Canopy Loop (I) and close the chain connector.
10. Feed the wires through Canopy Loop (J) and Nipple (C) and pull until taut.
* You may now install the fixture.
11. Slide the candle sleeves (R) on the sockets, then hang the crystals (S).
12. Place the Bottom cap (P) over the nipple at fixture base and secure in place with the Finial (Q).
13. Install the light bulbs in accordance with the fixture's specifications.
(DO NOT EXCEED THE MAXIMUM WATTAGE RATING)
Fig 2
For Customer Service, contact the place of purchase to arrange for replacement parts.
Loading...
+ 1 hidden pages