Golden Lighting 1089-D5 RSB-PRL User Manual

Junction Box Screw
Mounting Strap w/ ground screw
Top/Bottom Threaded Rod
Part Needed Quantity
Reason why ( missing, scratched, broken glass, bent, bad finish)
Comments
Fig. 1
NOTE: INSTALL THE GLASS ASSEMBLY AFTER THE FIXTURE IS HUNG.
PARTS & ASSEMBLY SHEET
Read and review installation instruction sheet before assembling the fixture.
This fixture assembled PO:__________ Date: ________
Canopy Loop with Collar
For Customer Service, contact the place of purchase to arrange for replacement parts.
place with Check Ring (R) until tight.
PARTS LIST
Company Name:_______________________Co. Account #:_____________
to be filled out by retailer
Fixture Name: Pember ly Court 1089-D5 RSB-PRL
Notice: Please review the parts listing and check for all parts before assembling the fixture. If any parts are
missing or damaged, please note on this sheet and contact the place of purchase to arrange for replacement parts.
Canopy Wire connectors Top loop
1ea @5-1/2"X1-1/4" 3ea P3 Orange 1ea @3/8 x 65mm
Chain
1ea 6ft x4.2mm 2ea 8/32" x 1" 1ea @15 x 2mm
2ea @4.2X50mm 1ea @3/8 x 40mm x 5mm 1ea @3/8 x 55mm
Hex Nut
1ea 3/4"X4" 1ea @3/8 x 45mm/@3/8 x 60mm
Top Cover Check ring Top Cap
1ea @80 x 30mm 1ea @16 x 3mm 1ea @85 x 25mm
Finial Bottom Cover Bottom Cap
1ea @3/8 x 25mm 1ea @94 x 20mm 1ea @100x45mm
Part Needed Quantity
IXTURE ASSEMBLY INSTRUCTIONS
F
2ea/2ea @3/8 x 3mm/@3/8 x 5mm
Spring Washer

1089-D5RSB

ASSEMBLING THE FIXTURE (Fig. 1)
1. If the arms are packed closed, gently spread the arms until evenly spaced .
2. Feed the fixture wires through the T op Threaded Rod (N), Top Cover (O), Hex Nut (P), T op Cap ( Q ) , Check Ring (R) and Top Loop (J) and pull the wires until taut.
3. Turn Top Threaded Rod (N) into the coupling at the top center of Frame (M).
4. Slide the Top Cover (O) over Top Threaded Rod (N). Secure in place with the Hex Nut (P) until tight. Slide Top Cap (Q) over Threaded Rod (N), secure in
For Customer Service, contact the place of purchase to arrange for replacement parts.
and pull the wires until taut.
Fig 2
PARTS & ASSEMBLY SHEET
Fixture Name: Pemberly Court 1089-D5 RSB-PRL
C
D
6. By measuring, determine correct number of links needed for proper hanging height. Use a pair of pliers to open one link of the Chain (K). Remove the excess chain and discard it.
7. Use one of Chain Connector (L) to attach one end of the chain to the Top Loop (J) and close the chain connector.
8. Feed the fixture wires through Chain (K) (every three links)
9. Slip Canopy Loop Collar (H) over the chain, then do the same with Canopy (G).
10. When ready to complete the installation, use the other chain connector and attach the other end of Chain (K) to Canopy Loop (F) and close the chain connector.
11. Make sure the weight of the chandelier will be supported by the chain-not the electrical wire.
* You may now install the fixture.
Note: Complete these remaining steps after the fixture is hung.
12. Turn the Bottom Threaded Rod (S) into the coupling at bottom center of the Frame (M).
13. Slide the Bottom Cover (T) over the Bottom Threaded Rod (S). Secure in place with Hex Nut (P) until tight. Slide Bottom Cap (U) over the Bottom Threaded Rod (S), secure in place with Finial (V). Twist until tight.
14. Slide Glass Shade (W) over the socket of Frame (M) and secure Glass Shade (W) by threading Socket Ring (X) onto the socket of Frame (M) until tight.
15. Install the light bulb (not provided) in accordance with the fixture's specifications.
(DO NOT EXCEED MAXIMUM WATTAGE RATING)
Loading...
+ 1 hidden pages