Golden Lighting 1089-9 RSB-PRL User Manual

Page 1
Junction Box Screw
Mounting Strap w/ ground screw
Top/Bottom Threaded Rod
Part Needed Quantity
Reason why ( missing, scratched, broken glass, bent, bad finish)
Comments
place with Check Ring (R) until tight.
PARTS LIST
Company Name:_______________________Co. Account #:_____________
to be filled out by retailer
PARTS & ASSEMBLY SHEET
Read and review installation instruction sheet before assembling the fixture.
This fixture assembled PO:__________ Date: ________
Canopy Loop with Collar
For Customer Service, contact the place of purchase to arrange for replacement parts.
Fig. 1
NOTE: INSTALL THE GLASS ASSEMBLY AFTER THE FIXTURE IS HUNG.
Fixture Name: Pemberly Court 1089-9 RSB-PRL
Notice: Please review the parts listing and check for all parts before assembling the fixture. If any parts are
missing or damaged, please note onthis sheet and contact the place of purchase to arrange for replacement parts.
Canopy Wire connectors Top loop
1ea @5-1/2"X1-1/4" 3ea P3 Orange 1ea @3/8 x 65mm
Chain
1ea 6ft x5.0mm 2ea 8/32" x 1" 1ea @15 x 2mm
2ea @4.5X55mm 1ea @3/8 x 57mm x 10mm 1ea @3/8 x 55mm
Hex Nut
1ea 3/4"X4" 1ea @3/8 x 50mm/@3/8 x 70mm
Top Cover Check ring Top Cap
1ea @94 x 20mm 1ea @16 x 3mm 1ea @101 x 30mm
Finial Bottom Cover Bottom Cap
1ea @3/8 x 25mm 1ea @114 x 24mm 1ea @120x55mm
Part Needed Quantity
IXTURE ASSEMBLY INSTRUCTIONS
F
2ea/2ea @3/8 x 3mm/@3/8 x 5mm
Srping Washer

1089-9RSB

ASSEMBLING THE FIXTURE (Fig. 1)
1. If the arms are packed closed, gently spread the arms until evenly spaced .
2. Feed the fixture wires through the T op Threaded Rod (N), Top Cover (O), Hex Nut (P), T op Cap ( Q ) , Check Ring (R) and Top Loop (J) and pull the wires until taut.
3. Turn Top Threaded Rod (N) into the coupling at the top center of Frame (M).
4. Slide the Top Cover (O) over Top Threaded Rod (N). Secure in place with the Hex Nut (P) until tight. SlideTop Cap (Q) over Threaded Rod (N), secure in
Page 2
Fixture Name: Pemberly Court 1089-9 RSB-PRL
For Customer Service, contact the place of purchase to arrange for replacement parts.
and pull the wires until taut.
Fig 2
PARTS & ASSEMBLY SHEET
C
D
6. By measuring, determine correct number of links needed for proper hanging height. Use a pair of pliers to open one link of the Chain (K). Remove the excess chain and discard it.
7. Use one of Chain Connector (L) to attach one end of the chain to the Top Loop (J) and close the chain connector.
8. Feed the fixture wires through Chain (K) (every three links)
9. Slip Canopy Loop Collar (H) over the chain, then do the same with Canopy (G).
10. When ready to complete the installation, use the other chain connector and attach the other end of Chain (K) to Canopy Loop (F) and close the chain connector.
11. Make sure the weight of the chandelier will be supported by the chain-not the electrical wire.
* You may now install the fixture.
Note: Complete these remaining steps after the fixture is hung.
12. Turn Bottom Threaded Rod (S) into the coupling at bottom center of Frame (M).
13. Slide Bottom Cover (T) over the Bottom Threaded Rod (S). Secure in place with Hex Nut (P) until tight. Slide Bottom Cap (U) over Bottom Threaded Rod (S). Secure in place with Finial (V). Twist until tight.
14. Slide the Glass Shade (W) over the socket of Frame (M) and secure Glass Shade (W) by threading Socket Ring (X) onto the socket of Frame (M) until tight.
15. Install the light bulb (not provided) in accordance with the fixture's specifications.
(DO NOT EXCEED MAXIMUM WATTAGE RATING)
Page 3
INSTALLATION INSTRUCTIONS
For Customer Service, contact the place of purchase to arrange for replacement parts.
HANGING THE FIXTURE (Fig.1)
junction box Screws (E). Tighten screw securely with screw driver .
CONNECTING THE WIRES (Fig 2)
BLACK to BLACK (or SMOOTH) and W H ITE to WHITE ( or RIBBED).
13. Raise Canopy (G) t o the ceiling and sec ure in place by tightening the
14. Install the light bulbs and glas s shade as per the fixture assembly sheet .
Fig. 2
Fig. 1
canopy loop and nipple and into the outlet box.
L
B
C
A
JUNCTION BOX (CEILING)
D
E F
H
J
CHAIN
G
BARE COPPER
(Ground)
GREEN (Ground)
FIXTURE WIRES
SMOOTH (BLACK)
RIBBED (WHITE)
BLACK
WHITE
HOUSE WIRES
Fixture Name: Pemberly Court 1089-9 RSB-PRL
WARNING ! SHUT OFF POWER AT FUSE OR CIRCUIT BREAKER.
1. Carefully remove the new fixture from t he carton and the yellow bag t hat holds all your part s. Check that all parts are included as shown in the illustrations and the Parts and Assembly Sheet.
2. Shut off the power at the circuit breaker and remove old fixture from ceiling, including the old mount ing strap.
3. Thread Nipple (C) into Canopy Loop (F) until snug.
4. Thread other end of the Nipple (C) with Canopy Loop at tached into Mounting Strap (D).
5. Place Lock Washer (B) over end of Nipple (C) protruding through Mounting Strap (D) and thread Hex Nuts (A) onto Nipple until tight.
6. Take this mounting strap assem bly and mount to ceili ng junction box with
For Chandelier Light Fixture
7. Unscrew Canopy Loop Collar (H) from the Canopy loop. Take the canopy and pass over the Canopy loop. approximatly one half of the canopy loop exterior threads s hould be exposed. Adjust until desired height is reached. *the Canopy loop collar should fit snugly on the Canopy loop after the canopy is installed. Remove Canopy and C anopy lock collar .
8. Assemble the fixture and have an assist ant or secure support hold the weight of the fixture while you complete the wiring connections.
9. Thread the fixture wi res and ground wire of t he assembled fixture through the
10. Attach the power supply wires to t he fixture lead wires by connecting
11. Attach the GROUND w ire(GREEN or COPPER) from the Junction Box and the fixture Ground wir e to the green Ground Screw on the Mounting Bracket (D) or connect both wires together usi ng the correct size of wire connec tors. NOTE: Twist the w ires together i n the same direction you twist the wire connector onto the wires.
12. Tuck these wi re connections neatly into the Junction Box.
Canopy loop collar(H) into the Canopy Loop(F)
YOUR INSTALLATION IS NOW COMPLETE.
RETURN POWER TO THE JUNCTION BOX
AND TEST THE FIXTURE.
Loading...