PARTS & ASSEMBLY SHEET
spread the arms (C) until evenly spaced.
2. Feed the fixture wires through the Top loop (A) and
pull the wires until taut.
Fixture Name: Hidalgo 1051-3P SBZ
This fixture assembled PO:__________ Date: ________
Notice:
missing or damaged, please note onthis sheet and contact the place of purchase to arrange for
replacement parts.
PARTS LIST
Canopy
Chain 6ft Wire connectors 3ea Bottom cap 1ea
Chain connector
Mounting Strap
Green screws
Part Needed Quantity
Please review the parts listing and check for all parts before assembling the fixture. If any parts are
Company Name:_______________________Co. Account #:_____________
to be filled out by retailer
Metal Washer,
Mounting Screws 2ea
1ea
Canopy loop
2ea
1set Hex Nut 3ea Finial 1ea
and Canopy
loop collar
1ea Nipple 2ea
Rubber washer
and Spacer
1ea
Part Needed Quantity
Reason why ( missing, scratched, broken glass, bent, bad finish)
Comments
IXTURE ASSEMBLY INSTRUCTIONS
Read and review installation instruction sheet before
assembling the fixture.
Fig 1
1051-3P SBZ
1. This fixture is packed with the arms closed. Gently
3.Then screw the Top Loop (A) to the top of Frame
coupler (B) until tight.
NOTE: I
NSTALL THE GLASS ASSEMBLY AFTER
THE FIXTURE IS HUNG.
For Customer Service, contact the place of purchase to arrange for replacement parts.

For Customer Service, contact the place of purchase to arrange for replacement parts.
needed for proper hanging height. Use a pair of pliers
PARTS & ASSEMBLY SHEET
Fixture Name: Hidalgo 1051-3P SBZ
(D), lock into position by the tightening hex nut.
fixture’s specifications.
screw the Finial (O) onto the Nipple (E) until tight.
4. Slide Center Ring (H) up to the Arms (C) and
make the screw(G) through the hole of the Steel
clip(J) ,secure with Ball nut(I). (see Fig2)
Fig 2
5. By measuring determine correct number of links
to open one link of the Chain (C2) then remove the
excess Chain (C2) and discard it.
6. Use one chain connector (E2) to attach one end of
the chain to the Top loop (D2) and close the chain
connector.
7. Feed the fixture wires through the Chain (every
three links) and pull the wires until taut.
8. Slip Canopy loop collar (B2) over the chain, then
do the same with the canopy (F2).
9. When ready to complete the installation Use the
other chain connector and attach the other end of the
chain to the canopy loop (A2) and close the chain
connector.
10. Make sure the weight of the chandelier is
supported by the chain-not the electrical wire.
Fig 3
A2
B2
E2
C2
E2
D2
* You may now install the fixture.
Fig 4
NOTE: Finish installing the glass after the fixture is
11. Thread the Nipple (E) into the Socket assembly
12. Install the light bulbs in accordance with the
13. Slide the Glass shade (F), Rubber washer (K),
Metal washer (L) over the Nipple (E) secure them by
the Hex Nut (M).
14. Slide the Bottom Cap (N) over the Nipple (E),
(DO NOT EXCEED THE MAXIMUM WATTAGE

INSTALLATION INSTRUCTIONS
FINISHING THE INSTALLATION
tightening the Canopy loop collar (H) into the Canopy Loop (F)
should fit snugly on the Canopy loop after the canopy is installed.
Remove Canopy and Canopy loop collar.
bag that holds all parts. Check that all parts are included as shown
6. Take this mounting strap assembly and mount to ceiling junction
together using the correct size of wire connectors.
wire connector onto the wires.
Fixture Name: Hidalgo 1051-5,-9,-3P SBZ
For Chandelier Light Fixture
WARNING ! SHUT OFF POWER AT FUSE OR CIRCUIT BREAKER.
HANGING THE FIXTURE (Fig.1)
1. Carefully remove the new fixture from the carton and the yellow
in the illustration and parts list.
2. Shut off the power at the circuit breaker and remove old fixture
from ceiling, including the old mounting strap.
3. Thread Nipple (C) into Canopy Loop (F) until snug.
4. Thread other end of the Nipple (C) with Canopy Loop attached
5. Place Lock Washer (B) over end of Nipple (C) protruding
through Mounting Strap (D) and thread Hex Nuts (A) onto Nipple
until tight.
box with junction box Screws (E). Tighten screw securely with
screw driver.
7. Unscrew the Canopy loop collar (H) from the Canopy loop.
Take the canopy and pass over the Canopy loop. approximatly
one half of the canopy loop exterior threads should be exposed.
Adjust until desired height is reached. *the Canopy loop collar
Fig. 1
JUNCTION BOX
(CEILING)
A
B
D
C
E
F
G
H
CHAIN
8. Assemble the fixture and have an assistant or secure support
hold the weight of the fixture while you complete the wiring
9. Thread the fixture wires and ground wire of the assembled
fixture through the canopy loop and nipple and into the outlet box.
CONNECTING THE WIRES (Fig 2)
10. Attach the power supply wires to the fixture lead wires by
connecting BLACK to BLACK (or SMOOTH) and WHITE to
WHITE (or RIBBED).
11. Attach the GROUND wire(GREEN or COPPER) from the
Junction Box and the fixture Ground wire to the green Ground
Screw on the Mounting Bracket (D) or connect both wires
NOTE: Twist the wires together in the same direction you twist the
12. Tuck these wire connections neatly into the Junction Box.
13. Raise Canopy (G) to the ceiling and secure in place by
14. Install the light bulbs and glass shade as per the fixture
assembly sheet.
J
Fig. 2
YOUR INSTALLATION IS NOW COMPLETE.
RETURN POWER TO THE JUNCTION BOX AND
TEST THE FIXTURE.
For Customer Service, contact the place of purchase to arrange for replacement parts.