Golden Lighting 1030-SF CH User Manual

PARTS & ASSEMBLY SHEET
(DO NO
Fixture Name: Cerchi 1030-SF CH
This fixture assembled PO:__________ Date: ________
Notice:
are missing or damaged, please note on this sheet and contact the place of purchase to arrange for replacement parts.
PARTS LIST
Canopy
Mounting Strap
Chain 6ft
Chain connector
Canopy Loop with Collar
Part Needed Quantity Part Needed Quantity
Reason why ( missing, scratched, broken glass, bent, bad finish) Comments
Please review the parts listing and check for all parts before assembling the fixture. If any parts
Company Name:_______________________Co. Account #:_____________
to be filled out by retailer
1ea
1ea
2ea
1ea Hex Nut 2ea Finial 1ea
Screws 2ea Top loop 1ea
Spring Washer
Mounting Screws
1ea Mounting Strap 1ea
5ea Nipple 1ea
4ea Deco Nut 2ea
FIXTURE ASSEMBLY INSTRUCTIONS
Read and review installation instruction sheet before assembling the fixture.
ASSEMBLING THE FIXTURE as Semi flush (Fig. 1)
1. Grasp the fixture wires and align the Fixture Nipple to socket assembly coupler (G) and thread together until tight. Ensure the fixture wires are not pinched in the coupler.
2. Gently spread the Frame arms (Y) until evenly spaced if arms are packed closed.
3. The Center column rings may be turned to your desired angle.
4. Slide Shade (H) through Fixture connector (K) and secure Shade (H) to Arms (Y) with Screws (N). Note: Complete these remaining steps after the fixture is hung.
5. Install light bulbs in accordance with fixture's specifications.
6. Slide Diffuser ( I ) to Shade (H) and secure in place by threading Bottom Finial (J) to the Fixture connector (K).
T EXCEED MAXIMUM WATTAGE RATING)
NOTE: INSTALL THE DIFFUSER AFTER THE
FIXTURE IS HUNG.
Fig 1
1054-SF ST
B
F E
L
Y
G
K
H
I
J
For Customer Service, contact the place of purchase to arrange for replacement parts.
PARTS & ASSEMBLY SHEET
Fixture Name: Cerchi 1030-SF CH
ASSEMBLING THE FIXTURE as Chain hung (Fig.2)
1. Remove the Circular strap from top of Fixture and replace the long mounting screws with two short screws (Z) to hold the Deco nuts (E) in place on the fixture Top cap (F).
2. Feed the fixture wires through the Top loop (W) and pull the wires until taut. Then screw the Top Loop (W) to the coupling in top cap (F) until tight.
3. By measuring determine correct number of links needed for proper hanging height. Use a pair of pliers to open one link of the Chain (T) then remove the excess Chain (T) and discard it.
4. Use one chain connector(V) to attach one end of the chain to the Top loop (W) and close the chain connector.
5. Feed the fixture wires (U) through the Chain (every
Fig 2
M
N O
C
P Q
R S
T U
V
three links) and pull the wires until taut.
6. Slip Canopy loop collar (S) over the chain, then do the same with the canopy (Q).
.
7. When ready to complete the installation Use the other chain connector and attach the other end of the chain to the canopy loop (R) and close the chain connector.
8. Make sure the weight of the chandelier is supported by the chain-not the electrical wire. Note: Complete these remaining steps after the fixture
is hung.
8. Slide Shade (H) through Fixture connector (K) and secure Shade (H) to Arms (Y) with Screws (N).
9. Install light bulbs in accordance with fixture's specifications.
10. Slide Diffuser ( I ) to Shade (H) and secure in place
Fig 3
L
Z
Y
W
F E
G
K
H
I
by with Bottom Finial (J) to the Fixture connector (K).
11. The Center column rings may be turned to your desired angle.
(DO NOT EXCEED MAXIMUM WATTAGE RATING)
For Customer Service, contact the place of purchase to arrange for replacement parts.
J
Loading...
+ 2 hidden pages