
PARTS & ASSEMBLY SHEET
Fixture Name: Cerchi 1030-MIL CH
This fixture assembled PO:__________ Date: ________
Notice:
are missing or damaged, please note onthis sheet and contact the place of purchase to arrange for
replacement parts.
PARTS LIST
Canopy
Chain 1ft
Chain connector
Socket rings 1ea Hex nut 3ea
12" Rod
Part Needed Quantity
Please review the parts listing and check for all parts before assembling the fixture. If any parts
Company Name:_______________________Co. Account #:_____________
to be filled out by retailer
1ea
2ea
2ea
Mounting
screws
Wire
connectors
Canopy loop
with Collar
2ea Top loop 1ea
3ea Nipple 1ea
1ea Mounting strap 1ea
Green ground
screw
1ea
Part Needed Quantity
Reason why ( missing, scratched, broken glass, bent, bad finish)
Comments
FIXTURE ASSEMBLY INSTRUCTIONS
Read and review installation instruction sheet
before assembling the fixture.
ASSEMBLING THE FIXTURE (Fig.1)
1. By measuring determine correct number of rods
and chain needed for proper hanging height.
There is 1 foot of chain and 2 optional 12" rods
included.
2. To shorten the fixture slide the excess 12" rods
off the wire.
3. To lengthen the fixture thread the additional
rods onto the wire or substitute longer chain for
the 1 foot length included.
Fig 1
1030-MIL CH
These two Rods may
be removed
or
additional Rods may
be added.
ROD-12 CH *
additional chain may
be added.
CHAIN-CH *
*available for purchase
separately
NOTE: INSTALL THE GLASS ASSEMBLY
AFTER THE FIXTURE IS HUNG.
For Customer Service, contact the place of purchase to arrange for replacement parts.

PARTS & ASSEMBLY SHEET
Fixture Name: Cerchi 1030-MIL CH
ASSEMBLING THE FIXTURE (Fig.2)
4. Pull the fixture’s wire through the Rods until
taut.
5. Thread Rod ( I ) into Frame (Q) until tight.
6. Thread Rod (M)into Rod ( I ) until tight. repeat
for any additional rods.
7. Feed the fixture wires through the Top loop
(D2 , J) and pull the wires until taut. Then screw
the Top Loop(D2) to the rod on the top of
fixture (M) until tight.
8. By measuring determine correct number of links
needed for proper hanging height. Use a pair of
pliers to open one link of the Chain (C2) then
remove the excess Chain (C2) and discard it.
9. Use one chain connector (E2) to attach one end
of the chain to the Top loop (D2) and close the
chain connector.
Fig 2
10. Feed the fixture wires through the Chain
(every three links) and pull the wires until taut.
11. Slip Canopy loop collar (B2) over the chain,
then do the same with the canopy (F2).
12. When ready to complete the installation Use
the other chain connector and attach the other
end of the chain to the canopy loop (A2) and close
the chain connector.
13.Make sure the weight of the chandelier will be
supported by the chain-not the electrical wire.
* You may now install the fixture.
14. Place the glass shade (P) over the threaded
socket (Q), secure with Socket washer (O) and by
threading the Socket ring (N) until tight.
15. Install the light bulb in accordance with the
Fig 3
fixture’s specifications.
16. The Center column rings may be turned to
your desired angle.
(DO NOT EXCEED MAXIMUM WATTAGE RATING!)
For Customer Service, contact the place of purchase to arrange for replacement parts.

INSTALLATION INSTRUCTIONS
Fixture Name: Cerchi 1030-6, 9, 363, 3P, D5, M1L CH
For Chandelier Light Fixture
WARNING ! SHUT OFF POWER AT FUSE OR CIRCUIT BREAKER.
HANGING THE FIXTURE (Fig.1)
1. Carefully remove the new fixture from the carton and the yellow
bag that holds all parts. Check that all parts are included as
shown in the illustration and parts list.
2. Shut off the power at the circuit breaker and remove old fixture
from ceiling, including the old mounting strap.
3. Thread Nipple (C) into Canopy Loop (F) until snug.
4. Thread other end of the Nipple (C) with Canopy Loop attached
into Mounting Strap (D).
5. Place Lock Washer (B) over end of Nipple (C) protruding
through Mounting Strap (D) and thread Hex Nuts (A) onto Nipple
until tight.
6. Take this mounting strap assembly and mount to ceiling
junction box with junction box Screws (E). Tighten screw securely
with screw driver.
7. Unscrew the Canopy loop collar (H) from the Canopy loop.
Take the canopy and pass over the Canopy loop. approximatly
one half of the canopy loop exterior threads should be exposed.
Adjust until desired height is reached. *the Canopy loop collar
should fit snugly on the Canopy loop after the canopy is installed.
Remove Canopy and Canopy lock collar.
8. Assemble the fixture and have an assistant or secure support
hold the weight of the fixture while you complete the wiring
connections.
9. Thread the fixture wires and ground wire of the assembled
fixture through the canopy loop and nipple and into the outlet box.
CONNECTING THE WIRES (Fig 2)
10. Attach the power supply wires to the fixture lead wires by
connecting BLACK to BLACK (or SMOOTH) and WHITE to
WHITE (or RIBBED).
11. Attach the GROUND wire(GREEN or COPPER) from the
Junction Box and the fixture Ground wire to the green Ground
Screw on the Mounting Bracket (B) or connect both wires
together using the correct size of wire connectors.
NOTE: Twist the wires together in the same direction you twist
the wire connector onto the wires.
12. Tuck these wire connections neatly into the Junction Box.
Fig. 1
JUNCTION BOX
(CEILING)
A
B
D
C
E
F
G
H
CHAIN
L
J
Fig. 2
13. Raise Canopy (G) to the ceiling and secure in place by
tightening the Canopy loop collar(H) into the Canopy Loop(F)
14. Install the light bulbs and glass shade as per the fixture
assembly sheet.
For Customer Service, contact the place of purchase to arrange for replacement parts.
YOUR INSTALLATION IS NOW COMPLETE.
RETURN POWER TO THE JUNCTION BOX AND
TEST THE FIXTURE.