GoGaS Goch KMI 20 - 1, KMI 40 - 1, KMI 60 - 1, KMI 90 - 1, KMI 120 - 1 Installation, Operation And Service Instructions

...
Page 1
Series KMI High Intensity Heater
Installation, Operation and Service Instructions
KMI 20 - 1 KMI 40 - 1 KMI 60 - 1 KMI 90 - 1
KMI 120 - 1
GoGaS Goch GmbH & CO. KG
44265 Dortmund - Germany
Phone +49 231 46505-0
Fax +49 231 46505-88
FOR YOUR SAFETY
If you smell gas:
1. Open windows
2. Don´t touch electrical switches
3. Extinguish any open flame
4. Immediately call your gas supplier
CONSIGNES DE SECURITE
Si vous sentez une odeur de gaz:
1. Ouvrez les fenêtres
2. Ne touchez pas aux interrupteurs électriques
3. Éteignez tout flamme nue
4. Contactez immédiatement votre fournisseur de gaz
Read and thoroughly understand these instructions before attempting any installation.
Retain this manual for reference.
Installer
Owner
FOR YOUR SAFETY
Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance.
CONSIGNES DE SECURITE
Il est interdit d’utiliser des liquides inflammables ou dégageant des vapeurs inflammables, a proximités de tout appareil fonctionnent au gaz.
Goch GmbH & Co. KG
Improper installation, adjustment, alteration, service or maintenance can cause injury, death
or property damage. Read the installation, operation and service instructions thoroughly
before installing or servicing this equipment.
WARNING
Superior Radiant Products
www.superiorradiant.com
LT152 November 4, 2013
Page 2
CAUTION: FIRE OR EXPLOSION HAZARD
Maintain clearance to combustible constructions as further specified in this manual. Failure to do so could result in a serious fire hazard. Heaters should not be located in hazardous atmospheres containing flammable vapours or combustible dusts. Signs should be provided in storage areas specifying maximum safe stacking height.
CAUTION: MECHANICAL HAZARD
This equipment is designed and approved for indoor use only. This product is not intended to be installed indoors in residential applications.
CAUTION: FIRE OR EXPLOSION HAZARD
This heater equipped with an automatic ignition device. Do not attempt to light the burner by hand. Failure to comply could result in a serious fire and personal injury hazard.
CAUTION: MECHANICAL HAZARD
Do not use high pressure (above ½ psi) to the test gas supply system with the burners connected. Failure to do so could results in damage to the burner and its control components requiring replacement.
CAUTION: SERVICE LIFE RISK
Do not install equipment in atmospheres containing halogenated hydrocarbons or other corrosive chemicals. High intensity heaters are not recommended for installation in enclosed swimming pool areas. Failure to do so may lead to premature equipment failure and will in-validate the warranty.
Serires KMI - 2 - November 4, 2013
Page 3
Goch GmbH & Co. KG
TableofContents
PREFACE.......................................................................................................................................4
THETECHNOLOGY........................................................................................................................4
IMPORTANT.................................................................................................................................5
GENERALINFORMATION..............................................................................................................5
NSTALLATIONCODES.........................................................................................................................................5
I G
ENERALINSTALLATIONANDGASCODES/ELECTRICALCODES...................................................................................5
A
IRCRAFTHANGARINSTALLATION........................................................................................................................5
P
UBLICGARAGES...............................................................................................................................................5
P
ARKINGSTRUCTURES........................................................................................................................................5
ARNING:........................................................................................................................................................5
W
LAYOUTCONSIDERATIONS...........................................................................................................6
S
POTHEATING..................................................................................................................................................6
S
UGGESTEDHEATLOADINGFORINDOORSPOTHEATINGUNDERSTATEDCONDITIONS:...................................................7
F
ULLBUILDINGHEAT..........................................................................................................................................7
ENGINEERINGSPECIFICATIONS.....................................................................................................8
E
NERGYSUPPLY.................................................................................................................................................8
M
INIMUMCLEARANCESTOCOMBUSTIBLES...........................................................................................................9
INSTALLATIONSINSTRUCTIONS..................................................................................................10
H
IGHINTENSITYMOUNTINGINSTRUCTIONS/CONFIGURATIONS.............................................................................10
HorizontallyMountedHighIntensityHeater...........................................................................................................10
Angledhighintensityheater....................................................................................................................................12
A
IRPLATEINSTALLATIONINSTRUCTIONS..............................................................................................................13
Procedure:................................................................................................................................................................13
ASCONNECTIONS..........................................................................................................................................14
G
LECTRICALCONNECTIONS................................................................................................................................15
E
Single‐stageelectricalconnection/WiringDiagram..............................................................................................16
ENTILATION...................................................................................................................................................17
V
ONDENSATION............................................................................................................................... ................17
C
OPERATION................................................................................................................................18
S
INGLE‐STAGEHIGHINTENSITYHEATER...............................................................................................................18
ControlOperatingSequence....................................................................................................................................18
Controlling/CheckingManifoldPressure...............................................................................................................18
NNUALMAINTENANCE...................................................................................................................................19
A
TROUBLESHOOTING...................................................................................................................20
REPLACEMENTPARTSECTION....................................................................................................21
WARRANTY................................................................................................................................22
Serires KMI - 3 - November 4, 2013
Page 4
Preface
GoGaS high intensity heaters represent an efficient and comfortable alternative to conventional heating systems. The infrared gas fired heater is an atmospherically operated infrared heater which converts most of the energy applied (natural gas or LPG) into thermal radiation. The sensible radiation component within the vicinity of persons allows a reduction in the air temperature, thus leading to energy savings.
The Technology
The GoGaS KMI Novus high intensity heater from the KMI series is a high-quality product with ratings from 6 kW (21,000 BTU/h) to 36 kW (125,000 BTU/h). The modern injector burner allows almost pollution-free operation, from the smallest to the largest heater unit, with only one combustion chamber. The stainless steel combustion chamber is integrated in an insulated hood. The hot waste gases collect under the hood and pre-heat the gas-air mixture in the combustion chamber, leading to a maximum degree of radiation. The reflector is made of highly reflecting material and directs the captured radiation towards the vicinity of persons.
Serires KMI - 4 - November 4, 2013
Page 5
Goch GmbH & Co. KG
Important
This appliance must be installed in accordance with current connection and installation regulations and may only be used in adequately ventilated rooms. The installation and operating instructions must be inspected and understood before installation and before start-up. Before installation it must be checked whether local gas distributions, gas types and gas pressures as well as the settings of the appliance are compatible.
Important
These instructions, the layout drawing, local codes and ordinances, and applicable standards such as apply to gas piping and electrical wiring comprise the basic information needed to complete the installation, and must be thoroughly understood along with general building codes before proceeding.
Only personnel who have been trained and understand all applicable codes should undertake the installation. SRP Representatives are Factory Certified in the service and application of this equipment and can be called on for helpful suggestions about installation.
General information
GoGaS infrared heaters are manufactured in accordance with ANSI Z83.19-2009/CSA 2.35-
2009. Each appliance is subjected to a function test before it leaves the factory and is preset to the relevant gas type. For setting up and operating radiation equipment, the following regulations and guidelines must be complied with.
This heater maybe approved for either indoor or outdoor installation. Not for use in residential dwellings, refer to Rating plate.
Installation Codes
The installation must conform with local building codes or, in the absence of local codes, with the National Fuel Gas Code, ANSI Z223.1/NFPA 54, or the Natural Gas and Propane Installation Code, CSA B149.1.
General Installation and Gas Codes/Electrical Codes
If an external electrical source is utilized, the heater, when installed, must be electrically grounded in accordance with the National Electrical Code, ANSI/NFPA 70, or current Canadian Electrical Code, CSA C22.1.
Aircraft Hangar Installation
Installation in aircraft hangars must conform to the Standard for Aircraft Hangars, NSI/NFPA 409 in the US and CAN/CGA B149.1 and B149.2 Installation Codes in Canada
Public Garages
Installation in public garages must conform to the Standard for Parking Structures, NFPA 88A or the Standard for Repair Garages, NFPA 88B, in the US and CAN/CGA B149.1 and B149.2 Installation Codes in Canada.
Parking Structures
Technical requirements are outlined in ANSI/NFPA 88A (USA)
Warning: Heaters should be installed so that the minimum clearances marked on the heater will
be maintained from vehicles parked below the heater.
Serires KMI - 5 - November 4, 2013
Page 6
Layout Considerations
1. Because high intensity heaters are un-vented, ensure that adequate ventilation will be available; most codes require a minimum of 4 cfm per 1000 BTUH of installed heat capacity in natural gas, 4.5 cfm per 1000 BTUH for propane. Also see section on Ventilation.
2. Check local codes for mounting requirements and the requirement for flexible gas connectors or rigid mounting.
3. Do not locate heaters near windy locations such as door openings.
4. Do not locate heaters in very dusty environments
5. Avoid placing heaters below sprinkler heads or provide more than adequate clearance.
Spot Heating
High intensity heaters are ideal for spot heating applications. The following are key considerations to the success of the application:
1. Minimize any wind in order to maximize the effect of the radiant heat.
2. Placing two smaller heaters opposing each other will be more c omfortable than placing one large heater.
3. Hang the heaters back and at an oblique angle (rather than directly overhead) in order to maximize the exposure of the peoples’ bodies to radiant heat.
The following charts are intended for guidance only. Specific applications may require other parameters.
Suggested Minimum Mounting Heights
Heater Input
Mounting Angle
Rate
0° – 10° 30°
BTU/hr
ft m ft m 20,000 10 – 15 3 – 4.6 9 – 13 2.7 – 4 40,000 12 – 19 3.7 – 5.9 11 – 17 3.4 – 5.2 60,000 14 – 22 4.3 – 6.7 13 – 19 4 – 5.9 90,000 15 – 24 4.6 – 7.3 14 – 22 4.3 – 6.7
120,000 17 – 29 5.2 – 8.8 16 – 25 4.9 – 7.6
Serires KMI - 6 - November 4, 2013
Page 7
Suggested heat loading for indoor spot heating under stated conditions:
BTU/hr per sq. ft of
Ambient Air
Temperature
At 50 ft/min of wind
(15.2 m/min)
Floor Area to be Heated
At 100 ft/min of wind
(30.5 m/min)
40°F / 4°C 150—165 165—180
55°F / 13°C 75—88 85—100
Example:
Work counter for light assembly, space is 15 ft x 25 ft. (4.5 m x 7.6 m), ambient air temperature 40°F / 4C, located near shipping doors.
Approximately 170 BTUH/sq.ft x (15x25) sq.ft = 63,750 BTUH Two heaters at opposing locations would be preferred
Goch GmbH & Co. KG
Full Building Heat
Calculate the total heat input required, ensuring the inclusion of any unheated make-up air due to exhaust fans. Use the following chart as guidance to heater placement.
Model/BTUH KMI-20 KMI-40 KMI-60 KMI-90 KMI-120
Heater
Mounting
Height,
ft (m)
Mounting
Angle 0°-10°
Mounting
Angle 30°
Distance of first heater
row
from outside wall, ft (m)
Distance between heaters
along outside wall*, ft (m) Distance between rows –
out-side wall row to next
interior row, ft (m)
10-15
9-13
6
(1.9) 8-20
(2.5 – 6.1)
30-60
(9.2 – 18.3)
12-19
11-17
10
(3.1)
15-30
(4.6 – 9.2)
50-80
(15.2 – 24.4)
14-22
13-19
12
(3.7)
20-40
(6.1 – 12.2)
75-110
(22.9 – 33.5)
15-24
14-22
14
(4.3)
30-50
(9.2 – 15.2)
90-115
(27.5 – 35.0)
17-29
16-25
16
(4.9)
40-60
(12.2 – 18.3)
100-125
(30.5 – 38.1)
* Distance between heaters along interior rows should be up to twice the indicated number
Serires KMI - 7 - November 4, 2013
Page 8
ENGINEERING SPECIFICATIONS
Energy supply
Gas connection: ½” NPT female thread
Connection Natural Gas Propane
Maximum Minimum
14" W.C. 6.5” W.C. 14" W.C. 12” W.C.
Electrical connection
Alternating current AC, voltage; 24 V, 60 Hz with L, N and Ground (GND)
Power consumption: 12 W for single-stage infrared heaters
MODEL "A"
Gas pressures
5.90
KMI 20 18.90" KMI 40 33.43" KMI 60 47.95" KMI 90 62.48"
KMI 120 91.54"
13.80
A
Nomina l Therma l Load
MODEL
KMI 20 43 KMI 40 68 KMI 60 94 KMI 90 123
KMI 12 0 170
Nat. Gas (Btu / h)
45,000 65,000 90,000
125,000
Nominal Thermal Load
Propane Gas(Btu / h)
23,00021,000 44,000 66,000 90,000
125,000
Single Stage Gas Pressure:
Minimum 6.5" W.C. 12" W.C.
Natu ral Gas Propane
19.57
W eight
LBS
Maximum 14" W.C 14" W.C. Manifold 5" * W.C. 11" W.C.
*5.25" W.C. for model KMI 90
Serires KMI - 8 - November 4, 2013
Page 9
Minimum Clearances to Combustibles
Suspended at an Angle Up to 35°Suspended Horizontally
A
F
Goch GmbH & Co. KG
E
12.20
1/2" NPT Inlet
BB
Note: Venture must always be
C
located in the upper position
C
D
22.83
14.02
Suspended
MODEL
Horizontally
ABCDEF
KMI 20 15" 29" 90" 10" 22" 65" KMI 40 15" 29" 95" 10" 22" 65" KMI 60 15" 32" 100" 10" 22" 68" KMI 90 15" 35" 105" 10" 24" 70"
KMI 120 15" 39" 110" 10" 24" 75"
Suspended at an
Angle up to 30°
Combustible materials are considered to be wood, compressed paper, plant fibres, plastic, Plexiglas or other materials capable of being ignited and burned. Such materials shall be considered combustible even though flame-proofed, fire-retardant treated or plastered.
The stated clearance to combustibles represents a surface temperature of 90°F (50°C) above room temperature. Building materials with low heat tolerance (such as plastics, vinyl siding,
canvas, tri-ply, etc…) may be subject to degradation at lower temperatures. It is the installer’s responsibility to assure that adjacent materials are protected from degradation.
Serires KMI - 9 - November 4, 2013
Page 10
Installations Instructions
Figures below illustrate the typical mounting configurations for the Series KMI heaters;
verify which is permissible by local codes.
Heaters must be hung at an angle between 0° and 30°. Typically, at the walls they are at
30° facing into the building. The gas manifold must always be at the lower side of the heater.
Minimum 3/16" diameter S hooks and No. 1/0 chain (200 lb./ 91 kg working load) is
recommended. Close S hooks after installation.
Never use a gas line as a hanging support and never locate gas or electric lines over the
heaters.
Maintain clearance to combustibles. Ensure that there is a plugged tap upstream of the heater or a fitting on the valve itself to
verify incoming pipeline pressure.
Do not leave the heater connected when pressure testing the pipeline. The high pressure
will damage the equipment.
High Intensity Mounting Instructions / Configurations
GoGaS High Intensity Heaters are approved to be operated horizontally and a maximum of 30° inclined angles (as per figure below). Mounting kits are available and can be ordered separately. Use mounting points located on the heater for installations.
Horizontally Mounted High Intensity Heater Chain
Minimum Mounting Heights (horizontally) relative to Air Temperature
MODEL
59° F 50° F 41° F
KMI 20 179.53" 139.37" 124.80"
air tem per at ure
KMI 40 226.38" 169.69" 148.82" KMI 60 262.20" 192.52" 166.93" KMI 90 292.13" 312.20" 182.68"
KMI 120 342.91" 244.49" 208. 66"
Serires KMI - 10 - November 4, 2013
Page 11
Mounting hardware
beam clamp suspension for pipe ring or wooden main beam clevis
Goch GmbH & Co. KG
Serires KMI - 11 - November 4, 2013
Page 12
Angled high intensity heater
1
Left
1 Right
2
Item Quantity Description Type
1 2
1 set Angled suspension AW 84/II 1 set Accessories AW 84/II
Type KMI 20 KMI 40 KMI 60 KMI 90 KMI 120
Hole spacing A (inches) 19.882 34.409 48.937 63.464 92.52
Weight (pounds) 31.00 48.50 66.10 86.00 119.00
Minimum Mounting Heights (angled at 30°) relative to Air Temperature
MODEL
59° F 50° F 41° F
KMI 20 162.60" 127.56" 115.35" KMI 40 201.97" 152.76" 135.43" KMI 60 232.28" 172.05" 150.79" KMI 90 257.87" 188.19" 163.78"
KMI 120 300.79" 215.75" 185.83
air temper at ure
Serires KMI - 12 - November 4, 2013
Page 13
Air Plate Installation Instructions
Single Stage Infrared Heaters
M5 Screws (QTY 4)
Goch GmbH & Co. KG
Procedure:
Venture Neck
Air Plate
Orifice
Housing
Orifice
Single-Stage Version
Before the orifice housing is mounted to the Venturi neck, the Air Plate and orifice sizes must be compared with the Rating plate specifications.
Remove the cable ties (not shown) from the Venturi Neck (some infrared heaters do
not have any air plates, and therefore no cable ties)
Push the orifice housing into the Venturi Neck and screw it tight using four M5 screws
provided.
Serires KMI - 13 - November 4, 2013
Page 14
Gas Connections
Connect the gas line (using an approved Flexible Gas Connector) to gas valve train
assembly, see figure below for the correct and incorrect connections.
CORRECT POSITIONS
3" (7.62 cm) Max.
Displacement
(30 cm)
Flexible connector should not be under tension when connected to the heater. Refer to figure above.
It is recommended to test leak the system before connecting the heater to the gas line as the leak test may damage the gas valve.
Provide a 1/8" NPT plugged tapping, accessi ble for test gage connection, immediately
upstream of the gas supply connection to the heater.
The Gas Valve should be installed in the upright position (vertically up @ 12 O’clock
position) or horizontally (3 or 9 O’clock positions) but not vertically down @ 6 O’clock position) see figure below.
The Gas Pressure Switch must remain in the horizontal position at all times. Carry out a leak test to the entire system by opening the gas valve, check for any
leaks and fix any leak issues.
12"
Air Flow Direction
Heater Movement
INCORRECT POSITIONS
Heater Movement
Heater
Movement
WRONG WRONG
WRONG
Heater Movement
WRONG
Heater
Movement
Gas Valve
Correct Positions
Serires KMI - 14 - November 4, 2013
Gas Valve
Incorrect Position
WARNING GAS PRESSURE SWITCH MUST REMAIN IN HORIZONTAL POSITION
Page 15
Goch GmbH & Co. KG
Electrical Connections
For your safety, shut off the main gas valve, and disconnect all electrical supply to the High Intensity Unit.
Ensure the heaters are properly grounded. Perform all work in accordance with local codes or the National Electric Code
ANSI/NFPA 70 or Canadian Electrical Code CSA C22.1.
Connect the Ignitor cable, Flame sensor wire and the ground wire as illustrated below. This appliance is equipped with a safety control system designed to shut the burner off in
the event of inadequate gas pressures
Connect to Gas Supply
Single-Stage Version
Flame Sensor Wire (Pink)
Ignitor Cable (Black)
Ground Wire (Green/Yellow)
Serires KMI - 15 - November 4, 2013
Page 16
If mechanical exhaust or humidistat is used in the building, it is typical to interconnect these in the heater circuit as shown in figure below.
Block Diagram for
interconnecting Fan / Humidistat
FAN #2
N
L1
FAN #1
When using a humidistat to
control exhaust fans, wire the
HUMIDISTAT
FAN
RELAY
humidistat to cause the fan to operate on humidity rise NOT humidity fall. Depending on fan horsepower, a relay may or may not be needed.
N
L1
Do NOT connect the Ignitor cable, flame sensor wire and ground wire together! The Ignitor cable and Sense cable have different size connection that match the
appropriate connection on the ignitor. The ground wire is connected directly onto one of the adjacent studs.
Push the insulating protector over the Ignitor cable and push it over the Ignitor electrode
after connection.
Single-stage electrical connection / Wiring Diagram
Connect the electrical lead wires to the gas valve control using these symbols (L1, N, and
GND) and make sure to ground the valve.
Make sure the input voltage going to the control assembly is a 24 V 60Hz AC before
connecting to the valve.
WIRING DIAGRAM ONE-STAGE
DSI
HV
TH
V1
24V
V2
GND
S1
RED
BROWN
GAS VALVE
BLUE
YELLOW GREEN
PINK
This Blue wire is only used with CNE control module
GREEN
GAS PRESSURE SWITCH
RED
T'Stat*
24V
FLAME SENSOR
IGNITER
Optional Field Supplied / Wired
L1
T'Stat*
TRANSFORMER
NEUTRAL
GREEN
BURNER
120V
Serires KMI - 16 - November 4, 2013
Page 17
Goch GmbH & Co. KG
Ventilation
Buildings using high intensity radiant heaters require ventilation. High Intensity type heaters are considered un-vented gas fired appliances, requiring ventilation to supply combustion air and dilute/remove the products of combustion.
Requirements for combustion air supply and dilution air vary by jurisdiction, building type and specific installation details. See local codes for guidance. In general, where heaters are installed without direct outside combustion air, fresh air ventilation must be provided to building space (3 cfm per 1000 BTU/Hr in Canada, 4 cfm per 1000 BTU/Hr in the USA), Verify applicable local codes in the USA as requirements change by jurisdiction.
Mechanical exhaust should be electrically interconnected with the heaters and should
always be installed in conjunction with inlet air openings. See “Block Diagram for Interconnecting Fan/Humidistat” above for details.
Inlet air opening should be relatively small and distributed over the operating area of the
heaters. They must always be located below the level of the heaters. One square inch of net free inlet area per 1000 BTUH is recommended.
Condensation
The products of combustion for natural gas contain up to 1 liter of water per 100,000 BTU consumed. This may add substantial amounts of moisture to the building air environment and may become a problem of condensation on cold surfaces within the building. This is particularly true for poorly insulated metal roof decks or structural steel framing.
To decrease condensation, increase mechanical ventilation. Ensure that continuous waterproof barriers are used on the inside of all insulated
surfaces.
Ensure that exhausters pull air from the entire space and across the condensing surface. Humidistat controls may be integrated into the electrical control circuit of the heaters.
Serires KMI - 17 - November 4, 2013
Page 18
Operation
Single-Stage High Intensity Heater
Ensure the gas supply line has been purged. Open all gas cocks to the heaters and electrically energize the system. Follow the instructions on the heaters Lighting Instructions Label. Check to ensure that
the thermostat starts and shuts down the system.
Do NOT operate the Infrared Heater if the gas pressure below 6.5” W.C. for natural
gas and 12" W.C. for propane.
Control Operating Sequence
Energise the system by 1). Connecting electricity to unit, 2) Set thermostat to call for heat. Ignitor will spark after 30 seconds once the system energises, and the solenoid valve will open permitting gas to flow. The flame sensor will try to sense flame by sending current of 0.8A or greater to the flame sensor to confirm flame; if the flame sensor does not sense flame in 15 seconds the solenoid valve de-energises and it will try to light two more times, if it again fails to sense current it will go in lock out mode (fault mode 1 hour automatic reset).
Reconnection after shut-down on fault
The device must be disconnected from the electrical supply for a period of at least 5 sec.
Then it must be connected or plugged in again as described above. Re-ignition
If a malfunction occurs during operation, the ignitor will spark trying to ignite the gas for the maximum duration of 15 sec. If no current is created within this period, the device shuts down on fault.
Controlling / Checking Manifold Pressure
Connect the pressure gauge to the manifold pressure test nipple Switch on the high intensity heater. Compare the manifold pressure with the specifications on the rating plate and if
necessary correct manifold pressure.
Serires KMI - 18 - November 4, 2013
Page 19
Goch GmbH & Co. KG
Annual Maintenance
Close the fuel gas valve and de-energize electrical power to the heater. With an air hose regulated to no more than 15 psig blow away accumulated dust. Blow
across the face of the ceramic tiles, not directly at them. Blow into venturi for about one minute.
Verify that there are no cracked tiles. Review the wiring for any loose connections.
Serires KMI - 19 - November 4, 2013
Page 20
Troubleshooting
Symptom
Possible Cause
Corrective Acton
Heaters will not turn off
- Defective thermostat
- Stuck gas valve
Gas Odor Loose pipe connection
Burning of gas/air mixture inside Venturi (flashback)
- Cracks between or across ceramic grids
- Excessive drafts
- Excessive drafts
- Flame sense not
Heaters Cycles on/off
grounded
- Low gas pressure
- Dirty or plugged ceramics
Low surface temperature on ceramic surface
- Low inlet gas pressure
- Misaligned manifold/orifice
- Insufficient gas supply
- No power to control module
No spark, no ignition
- Control module defective
- No power to spark electrode
- No equipment ground
- No gas supply
Heater sparks but will not light
- Defective gas valve solenoid
- Defective electronic control
- Poor ground
- Reversed polarity on
Heater lights but ‘locks out’ after about 10 seconds
electric supply
- Sense electrode not sensing flame
- Defective electronic control
- Repair or replace
- Repair or replace Verify all connections are
sealed by using an appropriate leak test
- Replace burner head
assembly
- Shield or relocate heater
- Shield or relocate heater
- Verify wiring and correct
-
- Verify and correct
- See cleaning / annual
maintenance section.
- Verify and correct
- Replace manifold
- Verify capacity of fuel
supply lines
Verify and correct/replace
- Check shut off valve
and combination gas valve
- Verify and correct/replace
Verify and correct/replace
- Check continuity of sense electrode
- Verify and/or replace
Serires KMI - 20 - November 4, 2013
Page 21
Replacement Part Section
1
2
3
Goch GmbH & Co. KG
4
ITEM No.
1
2
3 4 5
5
ITEM DESCRIPTION GAS VALVE REPLACEMENT KIT
GAS PRESSURE SWITCH (NAT. GAS) GAS PRESSURE SWITCH (NAT. GAS) GAS PRESSURE SWITCH (LP. GAS) GAS PRESSURE SWITCH (LP. GAS) IGNITION MODULE SPARK ELECTRODE ASSEMBLY BURNER HEAD ASSEMBLY (NAT & LP GAS) BURNER HEAD ASSEMBLY (NAT & LP GAS) BURNER HEAD ASSEMBLY (NAT & LP GAS) BURNER HEAD ASSEMBLY (NAT & LP GAS) BURNER HEAD ASSEMBLY (NAT & LP GAS)
MODEL No.
ALL
60, 90 & 120
20 & 40
60, 90 & 120
20 & 40
ALL ALL GE001
20 40 60 90
120
PART No.
GG030 GG001 GG002 GG003 GG004
CE005
GS062 GS063 GS064 GS065 GS066
Serires KMI - 21 - November 4, 2013
Page 22
WARRANTY
SERIES KMI High Intensity Heater
The Manufacturer warrants to the original owner that the product will be free of defects in material and workmanship. For the Series KMI, the warranty for all components except for the ceramic burner head assembly is limited to 24 months from the date of installation. The ceramic burner head assembly shall be warranted for an additional eight years for units which are proven to the satisfaction of the manufacturer to be inoperative due to defects in material or workmanship.
The Manufacturer’s obligation under this is warranty limited to repair or replacement, F.O.B. its facility, of the defective part. In no event shall the manufacturer be liable for incidental expense or consequential damages of any kind.
This warranty does not cover any shipping, installation or other labor costs incurred in the repair or replacement of the product. No materials will be accepted for return without authorization.
This warranty will not apply if in the judgment of the Manufacturer the equipment has been improperly in-stalled, unreasonable used, damaged, or modified.
This warranty will not apply to damage to the product when used in corrosive atmospheres and in particular atmospheres contacting halogenated hydrocarbons. No person is authorized to assume for the Manufacturer any other warranty, obligation or liability.
THE REMEDIES PROVIDED FOR IN THE ABOVE EXPRESS WARRANTIES ARE THE SOL E AND EXCLUSIVE REMEDIES. NO OTHER EXPRESS OR IMPLIED WARRANTIES ARE MADE INCLUDING, BUT NOT LIMITED TO, ANY IMLIED WARRANTY OF MERCHANT ABILITY OR FITNESS FOR A PARTICULAR USE OF PURPOSE.
Address questions to your local distributor/ or
Heater Series : -----------------------­Installed rate : ------------------------Btu/hr Serial Number : -----------------------­Installed date : ------------------------
Superior Radiant Products 23-428 Millen Rd. Stoney Creek, ON L8E 3N9 CANADA Tel.: 905 664-8274 Fax.: 905 664-8846
GoGaS Goch GmbH & CO. KG Zum Ihnedieck 18 44265 Dortmund - Germany Phone +49 231 46505-0 Fax +49 231 46505-88
Serires KMI - 22 - November 4, 2013
Loading...