Goalsetter Systems X672, X554, X454, X660, X560 Installation And Owner's Instructions

...
EXTREME SERIES
Adjustable Height Goal Systems
Made In The USA
Installation & Owner’s Instructions
• X672
• X660
• X560
• X554
• X454
• X448
Extreme Series Goal System Instructions
This manual explains the proper installation, operation and maintenance of your Goalsetter Goal. Study and understand these instructions thoroughly before installing, operating or maintaining the goal. Failure to do so could result in serious injury or death and/or equipment damage. Consult your Goalsetter dealer or Goalsetter Systems, Inc. if you do not understand the instructions in this manual or need additional information.
Goalsetter Systems, Inc. recommends that you retain this manual for future reference of operation, maintenance and parts information.
The instructions, illustrations and specifications in this manual are based on the latest information available at the time of publications. Your goal may have product improvements and options not yet contained in this manual.
Goalsetter Systems, Inc. reserves the right to make changes at any time without notice or obligation.
Additional copies of these instructions are available from Goalsetter Systems, Inc.
2 www.goalsettersystems.com 800.362.GOAL (4625)
GOALSETTER®, GOALSETTER SYSTEMS®AND GOALSETTER®logo
are all registered trademarks of Goalsetter Systems, Inc. in the U.S.
and/or other countries.
GS
and BEST IN BASKETBALL™are trademarks of Goalsetter
Systems, Inc.
This product is covered by various U.S. and Canadian patents,
including U.S. Patent #5,211,393.
Patent infringement will be pr
osecuted.
No part of this manual may be reproduced in any form or by any
means electronic or mechanical, including photocopying, recording,
or by any information storage and retrieval systems without the
express written consent of Goalsetter Systems, Inc.
Copyright 2006.
Revised 6/9/2008.
All Rights Reserved.
Goalsetter Systems, Inc.
Questions? Comments? Contact Us:
Phone: 800.362.4625 • Fax: 641.594.3343
Email: info@goalsettersystems.com
www.goalsettersystems.com
Extreme Series Goal System Instructions
TABLE OF CONTENTS
Contact Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2
Thank You . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
Lay Out Playing Court . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
Court Markings (reference only) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
Safety Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5
Ground Anchor Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Call "One-Call" . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Required Tools and Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Ground Anchor Placement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8
Dig Hole . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8
Position Anchor and Fill With Concrete . . . . . . . . . . . . . . . . . . . . . . . .8
Goal Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12-13
Goal Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9
Required Tools and Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9
Hardware Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9-11
Parts List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14-15
Pole Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16-17
Backboard Attachment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .18
Goal Alignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .19
Rim Attachment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20
Height Indicator Attachment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21
Operation and Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21-22
Cleaning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21
Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .21
Lubrication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .22
Maintenance
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
22
W
arranties
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
23
800.362.GOAL (4625) www.goalsettersystems.com 3
Extreme Series Goal System Instructions
4 www.goalsettersystems.com 800.362.GOAL (4625)
Thank you and congratulations for purchasing a Goalsetter Goal – the finest basketball goal system on the market today!
You will discover that Goalsetter is unsurpassed in product innovation, quality and integrity in the basketball equipment industry.We are continually focused on designing, engineering and producing products that meet and exceed the expectations of today’s toughest playing environments and demanding players. Please contact us if you have any concerns, questions or suggestions regarding our products.
THANK YOU!
LAY OUT PLAYING COURT
Consider the following to determine where to install the basketball goal:
Whether the goal is to be installed into a landscaped area next to the playing surface or into a hard-surfaced area.
Backboard size and its extension distance from the structure.
If court markings ar
e to be used.
Amount of playing surface desired beneath the goal.
Other functions of playing surface (such as driveway, tennis court, etc.)
Court Markings (reference only)
6'-0"
19'-9"
50'-0" Optimum Inside Sidelines
15'-0"
19'-0"
25'-0"
63"
15"
12'-0"
4'-0"
Note: Lines are 2" wide.
Regulation Court Lengths:
High School: 84' College: 94' Professional: 94'
Extreme Series Goal System Instructions
800.362.GOAL (4625) www.goalsettersystems.com 5
Failure to follow these safety instructions may result in serious injury or death and/or property damage.
Do not install or use this product unless the instructions within this manual have been carefully read and understood.
Consult your Goalsetter dealer or Goalsetter Systems, Inc. if you do not understand the instructions in this manual or need additional information.
Before digging for the ground anchor, contact your local One-Call system in your area.
If using a ladder during assembly, use extreme caution. Two or three people are recommended for safe installation and assembly.
Installation and assembly of this product will require lifting and bending that may result in injury to anyone not accustom to this type of activity.
Ensure there are no overhead power lines within a 20 ft. (7 m.) radius of the goal location.
Climate, corrosion or misuse could result in system failure.
With rim set at 7'-0" playing height, the minimum operational height is 6'-4" (1.9 m) to the bottom of the backboard.
DO NOT HANG on the rim or any part of the goal system. This includes the backboard, support braces or net.
During play, especially when performing dunking activities, keep the player’s face away from the backboard, rim and net. Serious injury could result if teeth/face come in contact with the backboard, rim or net. Do not wear jewelry or other loose objects that could become entangled in the net.
Twice yearly, check the goal system for loose hardware, excessive wear and signs of corrosion. Repair the system before use.
Never play on damaged equipment.
SAFETY INSTRUCTIONS
Extreme Series Goal System Instructions
6 www.goalsettersystems.com 800.362.GOAL (4625)
GROUND ANCHOR INSTALLATION
Contacting buried utilities may cause serious injury or death. Before you start digging, always contact your local One-Call system to help prevent personal injury, interruption of services, environmental accidents or job delays.
Electric lines can shock or electrocute. Gas lines can rupture causing explosion or fire. Laser light in fiber optic cable can cause blindness.
One-Call will notify participating utility companies of your proposed digging project. I
f you do not know the number for the local One-Call in your area, call the National One-Call at 1-888-258-0808 for this information.
After being notified, utility companies will mark their underground facilities by using the following international marking codes:
Color Definition
Red Electric
Yellow Gas, Oil or Petroleum
Orange Communication, Telephone, TV
Blue Portable Water
Green/Brown Sewer
White Proposed Excavation
Pink Surveying
Spade Shovel Tape Measure Level Stir Rod
Auger or Post Hole Digger 10-14, 60 lb. Bags of Dry Concrete Mix
(or 1/4 - 1/3 yard of ready mix concrete may be substituted for the concr
ete mix)
W
ater
Required Tools and Materials
Extreme Series Goal System Instructions
800.362.GOAL (4625) www.goalsettersystems.com 7
GROUND ANCHOR PLACEMENT
Use the following guidelines when installing ground anchor into a
hard-surfaced area:
Top of ground anchor to be 1" (25 mm) above playing surface.
Concrete fill should have top sloped away from anchor in all directions to shed moisture away.
Top of ground anchor must be level both directions across its surface.
Hinge side of anchor toward playing surface.
Hinge parallel with playing surface.
Distance from edge of hole made in playing surface to anchor to be
no less than 6" (152 mm).
Distance from bottom of ground anchor plate to concrete fill to be no less than 1" (25 mm).
IMPORTANT – When preparing for ground anchor, allow at least 6" (152 mm) from all sides of ground anchor to wall of hole to allow for sufficient concrete fill around anchor.
Use the following guidelines when installing ground anchor into a
landscaped area next to
the playing surface:
Top of ground anchor to be flush with or slightly above playing surface.
Top of ground anchor must be level both directions across its surface.
Concrete fill should have top sloped away from anchor in all
dir
ections to shed moistur
e away.
Hinge side of anchor toward playing surface.
Hinge parallel with playing surface.
Distance from edge of playing surface to anchor to be no less than 6"
(152 mm).
Distance from bottom of ground anchor plate to concrete fill to be no less than 1" (25 mm).
48-50"
(1.2-1.3 m)
1" (25 mm) minimum
18" (0.5 m)
6
" (152 mm)
all sides
Playing Surface
48-50"
(1.2-1.3 m)
1" (25 mm)
18" (0.5 m)
6" (152 mm) all sides
Playing Surface
Extreme Series Goal System Instructions
GROUND ANCHOR INSTALLATION
Dig Hole – When installing goal into a hard-
surfaced area, a minimum of a 18" x 18" (0.5 x
0.5 m) area of the hard surface will need to be removed.
Step 1 – Once location of goal has been determined, locate center of ground anchor hole.
Step 2 – Dig a hole approximately 18 " (0.5 m) in diameter and 48-50" (1.2-1.3 m) deep. Use a spade, shovel, auger or post hole digger.
Position Anchor and Fill Hole with Concrete Mix – For best performance,
do not fully fill hole with concr
ete mix befor
e positioning
the anchor.
Instead, fill base of hole with concrete mix, lower the ground anchor into the hole, position it and then finish filling with concrete mix.
Step 1 – Locate and unpack ground anchor. Do not remove plastic plugs or hinge bolt.
Step 2
– Place 2-3 bags of concr
ete mix into hole; add water and stir.
Follow concrete mix manufactur
er’s instructions for best results.
Step 3 – Position anchor in center of hole with hinge side toward and parallel with playing surface.
IMPORTANT – As hole is filled with concrete mix, periodically place a level on top of anchor plate and check that it is level front-to-back and left-to-right. Also check that the top of anchor is at correct height.
Step 4 – Adjust anchor plate height, depending upon installation, per guidelines given in Ground Anchor Placement.
Step 5 – Continue filling hole with concrete mix until it is within 1"-1.5" (25-38 mm) of anchor plate bottom, or level with landscape – whichever comes first.
6" (152 mm) minimum AND parallel
Check level both directions
Playing Surface
48-50"
(1.2-1.3 m)
1
8" (0.5m)
Diameter
8 www.goalsettersystems.com 800.362.GOAL (4625)
Loading...
+ 16 hidden pages