GOALRILLA B3333W, B3300W Owner's Manual

MODEL NO.
B33 33 W
CV54
BASKETBALL SYSTEM
O W N E R ' S M A N U A L
1. Read this manual carefully before starting assembly. Read each step completely before beginning
each step.
2. Some smaller parts may be shipped inside larger parts. Check inside all parts and cartons before assembling or ordering parts.
3. Tomake assembly of your basketball system easier, use the Hardware Identifier on page 3 and 4 to identify and sort all fasteners. Check all cartons for kits. All hardware is not located in one kit.
4. Do not tighten hardware until instructed to do so. If hardware is tightened too soon, mounting
An electric screwdriver is helpful in assembly. However, please set at low torque and use caution
5.
because you could overtighten the hardware and strip the screws.
Save this instruction and your proof of purchase (receipt) in the event that the manufacturer
6.
has to be contacted for replacement parts.
Please Do Not Return This Product To The Store!
Contact Escalade Sports customer service department at: Phone: 1-888-USA-GOAL Toll Free ! Fax: 1-866-873-3536 Toll Free ! E-mail: basketball@escaladesports.com Mailing Address: Escalade Sports PO Box 889 Evansville, IN 47706
Please visit our World Wide Web site at: www.G oalrilla.com
ON-LINE TROUBLE SHOOTING TECHNICAL ASSISTANCE
ON-LINE PARTS REQUESTS FREQUENTLY ASKED QUESTIONS
ADDITIONAL ESCALADE® SPORTS PRODUCT INFORMATION
®
2L-7248-03
Escalade® Sports products may be manufactured and/or licensed under the following patents. 6419596, 6179733, 5919102, 5071120, 4798381, 4424968, D326128 Additional patents may be pending. One or more of the listed patents and/or pending patents may cover specific product.
2018 Escalade Sports
2
HARDWARE IDENTIFIER
19
/12”
-13 x 1” Hex Bolt
(2 Pieces)
41
Pull Pin
(1 Piece)
3
/12”
Flat Washer
(2 Pieces)
Lock Washer
5
1/2”X 1-1/4” Dia. Plastic-Washer
(4 Pieces)
18
51
1/2” Split
(2 Pieces)
Hardware located in 4A-7081-00 box
4
1/2”-13
Nylon Locknut (Thin)
(10 Pieces)
77
1/2”-13 x 9”
1/2”-13 x 9”
Hex Bolt
Hex Bolt
(1 Piece)
(1 Piece)
37
14mm ID X 28mm OD Dia. - Washer
(8 Pieces)
14
34
5/8” Thread
Protector
(4 Pieces)
5/8” Flat Washer (Thick)
(8 Pieces)
Hardware located in Anchor kit box
3
14
3/4” OD x 5-11/16
Pivot Tube (1 Piece)
HARDWARE IDENTIFIER
24
Hardware required for rim assembly
24
3/8” X 19mm Flat Washer
(8 pieces)
88
1/2”-13 x 10”
1/2”-13 x 10”
Hex Bolt
Hex Bolt (3 Piece)
(3 Piece)
3/8” X 19mm Flat Washer
(4 pieces)
1/2”-13 X 1 3/4
Hex Bolt
(2 Pieces)
50
1/2”-13 X 2 1/4
Hex Bolt
(4 Pieces)
25
3/8”-16 X 1-1/4”
Hex Bolt
(4 Pieces)
12
#10 X 1 3/4” Phillips
Hex Head Self
Tapping Screw
(6 pieces)
5
1/2”X 1-1/4” Dia. Plastic-Washer
(18 Pieces)
Board Bushing
(2 pieces)
4
3
/12”
Flat Washer
(12 Pieces)
Two way Step Bushing
(2 pieces)
INSTALLATION TIMELINE
1. Prior to anchor system and goal assembly, call utility services for location of underground utility lines before you dig.
2. Vertical main post assembly is a two part process.
PART 1
Day 1. Complete Anchor System Installation Instructions.
(Below)
Day 2-4. Allow concrete to cure.
ANCHOR SYSTEM INSTALLATION INSTRUCTIONS (Day 1)
Before digging hole for anchor system, check for buried power, gas, water, and telecommunication lines! Failure to do so could result in serious or fatal injury! Contact your local utility company if unsure.
Items needed for Anchor Installation (not included)
11 - 80 lb. bags of concrete (2-3 extra recommended) 1 - post hole digger (optional) 1 - 15/16” open end wrench 1 - 15/16” socket and ratchet (optional) 1 - concrete form (see note after step 2)
Note: For best results with less vibration, anchor system should be independent of court. If pouring concrete for both at same time, add an expansion joint in between.
Note: When digging hole, if you hit rock and cannot dig through contact a contractor.
1. Determine the location of the anchor
system. The proper location is as close to the court without making contact, as shown in Figure 1. This, however, is a general rule. If you need to locate the anchor system in a location other than this, use the following dimensions as a guide.
Overhang when adjusted to 10 ft. = 31 1/2”
2. Assemble anchor system as follows: Thread nut (#35) to bottom
of threads on anchor bolt (#39) insert threads of anchor bolt (#39) through hole on anchor plate (#38) and secure with nut (#35). Repeat this step for the remaining anchor bolts. See Figure 2. Note:
THESE NUTS
USED FOR
LEVELING
Each leg of anch o r bolt s should face the anchor bolt to the right. See Detail A.
Figure 2
1 - wheel barrow 1 - garden hose 1 - level 1 - tape measure
MINI MUM
CLEA RANC E
REQU IRED
OVER HANG
18 INC H
REAR
PART 2
Day 5. Complete Goalrilla
TM
assembly instructions. (Requires
four adults)
Figure 1
Rebar
(Key #40)
Note: Using a concrete form for the top 4" of the concrete is recommended. Cardboard forms can be purchased at some hardware and home stores or a wooden form can be constructed out of 2 x 4's.
Note: Failure to dig and fill hole as instructed will result in increased system vibration.
*Tip: It is always a good idea to purchase one or two
extra bags of concrete, just in case you need them. If extra bags are not used you can return them to the store.
3. Mix and pour concrete into hole. Follow instructions on
concrete bag. Stop about 18" below court level.
4. Insert four reinforcement bars (Key #40) into concrete 8"
apart creating a square in center on hole.
5. Place form in desired location and finish pouring concrete
up to court level.
6. Push anchor system into concrete and agitate to work out
voids in concrete. Immediately use a level to level and square anchor plate to playing surface. Clean off any concrete that may be on exposed threads.
Note: The bottom four nuts will be forever embedded in concrete. The top four nuts remain on bolts and are used for leveling. (See Step 11 on page 9)
Let concrete cure for a MINIMUM of 72 hours.
5
GOALRILLATMASSEMBLY INSTRUCTIONS (Day 5)
TOOLS REQUIRED FOR THE FOLLOWING STEPS
1 - 15/16" open end wrench 1 - 15/16” socket and ratchet (optional) 1 - 9/16” Deep Well Socket & Ratchet 1 - 3/4” Socket & Ratchet 1 - 3/4” Open end Wrench 1 - 5-16” Socket Driver
1 - Cordless Drill & 9/64” Drill Bit
1. Attach Post Brackets (#48) to outside of brackets on back
of Post Assembly (#2). Secure with two Hex Head Bolts (#25),
four Flat Head Washers (#26) and two Locknuts (#24) in
each Bracket (#48). See Figure 3.
2.
If not already pre-assembled, slide Plastic Actuator Sleeve (#15) over Steel Actuator (#16) and place Actuator Cap (#13) on top. Align holes in all 3 parts and slide Pivot Tube (#14) through holes in Actuator Cap (#13) Plastic Actuator Sleeve (#15) and Steel Actuator (#16) until equal amounts stick out through both sides of actuator. See Figure 4.
NOTE: It may be necessary to use a rubber mallet
to tap in Pivot Tube.
NOTE: It is important for the installer to understand the necessity of the Plastic washers (#5) provided. These washers adequately space painted parts at all pivot points. Neglecting the use of these washers will result in rusted parts.
3. Lay Pole (#2) on its side on two padded saw horses. Attach
Actuator (#16) to Pole (#2) using one bolt (#19), split
lockwasher (#18), washer (#3) and two plastic washers (#5)
to thread into each side of Actuator. See Figure 4. Tighten bolts tight.
If Pole Cap (#46) is not already pre-installed insert it
4.
into the top of the Pole (#2). It may be necessary to use a rubber mallet to tap cap in.
14
1 - Level 1 - Tape Measure 1 - Rubber Mallet 1 - Set of Padded Saw Horses
1 - Ladder 1 - Pair of Safety Glasses 1 - Phillips Screwdriver
25
26
48
26
24
26
Figure 3
Figure 3
Figure 3
15
48
18
2
2
26
25
19
5
18
3
5
3
19
46
13
2
Figure 4
6
Loading...
+ 13 hidden pages