GNE module level optimization and monitoring system
Installation User Manual
(Honeybee350/400, Honeybee700/800, Scouter450,Swarm, Beehive)
Jiangsu GNE New Energy Technology Co., Ltd.
Tel:+86 519 8728 1798
Email: service@gnetek.com | Web:www.gnetek.com
Add.: 1F/B, No.218 Hongkou Road, Liyang City, Jiangsu 213300, CHINA
![](/html/26/260d/260d1fec7a29c999e313c626d5e9b936f8ae9f49c51a3b12f9ffb8d7cd01171a/bg2.png)
Notice
u This user manual is used to install and maintain GNE
power optimizer models Honeybee 350/400, Honeybee
700/800, PV monitor model Scouter350/450 and data
processing devices.
u No permission to disassemble and repair the products
to ensure the safety of personnel. For services, please
look for trained or qualified professionals.
u Before installing and using the power optimizers,
please familiarize yourself with all the tips and warnings
on the products, as well as the safety instructions and
other applicable safety guidelines in the inver ter
manual and the PV module installation instructions.
u To reduce the risk of fire and electric shock, install the
power optimizers in strict acco rda nce with loca l
electrical standards and codes.
u Before installing the optimization and monitoring
products, please remove all metal accessories that you
wear to reduce the risk of touching live circuits. It is
strictly forbidden to install and debug in bad weather.
u Do not operate if the GNE products can be physically
damaged. Check existing cables and connectors to
ensure they are in good condition and status. Do not
operate the cables and connectors of GNE products if
they are damaged or unqualified.
u Do n o t c o nnec t or d isc o n nec t th e GNE powe r
optimizers and montoring products under load. There
is also a risk of electric shock when shutting down the
inverter or the GNE products. After disconnecting all
power supplies, the capacitor inside the inverter can
continue to charge for a few minutes. Before measuring
the line, first measure the voltage at the inverter and
confirm that the capacitor is no longer charged.
u I n s t a l la tion must be perf o r m e d b y a t r a i n e d
professional. GNE is not liable for any loss or damage
caused by improper operation, discomfort or misuse of
these products.
u Before the GNE customer service personnel provide
services, please make sure that the data aggregation
device Beehive is powered on and the internet is fine,
and optimizers work in power-on status, then check the
current, voltage and power of the PV series.
![](/html/26/260d/260d1fec7a29c999e313c626d5e9b936f8ae9f49c51a3b12f9ffb8d7cd01171a/bg3.png)
Installation Steps:
1. Smart PV diagram (Apidae)
5. Connection to Swarm
and Beehive
2. Register MACID of GNE
models
6. Installation of data aggregation
device (Beehive)
3. Installation of optimizers
or PV monitors
7. Setup in data cloud center
(Honeypot)
4. Installation of data
acquisitoin unit (Swarm)
8. Appendix - Product
Specification
For more information, please visit GNE website www.gnetek.com, or contact us (email: service@gnetek.com, telephone: +86 519 87281798)
![](/html/26/260d/260d1fec7a29c999e313c626d5e9b936f8ae9f49c51a3b12f9ffb8d7cd01171a/bg4.png)
1. Smart PV Diagram(Apidae)
PV Array
Honeybee350/400
Scouter450
Connection Description:
• One Beehive can communicate up to 5 Swarms by 485 cable and
gather the generation data of 2000 optimizers and monitors
• One Swarm can wirelessly communicate 400 optimizers
• Honeybee350/400: Sole module power optimizer to connect one
PV panel
• Honeybee700/800: Dual module power to connect Two PV panels
• Scouter450: Sole module monitor to connect one PV panel
Internet
Data Acquisition Unit
Swarm
Integrated Optimizer
Smartbee350
Honeybee700/800
Data Aggregation Device
Beehive
Data Cloud Center
Honeypot
Inverter
![](/html/26/260d/260d1fec7a29c999e313c626d5e9b936f8ae9f49c51a3b12f9ffb8d7cd01171a/bg5.png)
2. Register MACID of GNE models
①. Plan the installation location of each
power optimizer or PV module
monitor
②. Take the power optimizer or PV module
monitor and write down the 8-digit MACID
number on the pl ant map, or string li st, or
construction drawing. And write down the 8-digit
MACID number of Swarm and Beehive.
A1
A2
B1
A3
B2
A4
B3
A5
B4
A6
B5
A7
B6
A8
B7
A9
B8
A10
B9
B10
Inverter
③. The i nstall at io n posit io n of th e powe r
optimizers or the PV module monitors should
accord to the previously recorded MACID order.