GM Autoflow CW Series Guarantee, Installation & Comissioning Instructions

“CW” SERIES WATER SOFTENER
GUARANTEE, INSTALLATION &
COMMISSIONING INSTRUCTIONS
Tel - 0845 10 80 680
Email - info@gmautoflow.co.uk
WATER SOFTENER INSTALLATION INSTRUCTIONS
1) Softeners should always be installed on firm level ground.
2) The supplies to the softener should be capable of being isolated as close as possible to the softener and a piped by-pass should be included if the softener does not already have one.
3) The connections should be made with flexible hoses with regard to the flow direction arrows on the connection manifold and the push fit hose connection for the drain should be run to an open faucet to prevent syphonage. If the unit is supplied with a separate salt tank, you will need to connect the brine line from the air check elbow to the tank, ensuring the brass inserts are fitted within the pipe.
4) The incoming supply to the softener should include a non-return valve.
5) It is important that a pressure test is carried out, the maximum working pressure is 5 bar, minimum pressure 1.4 bar.
6) The provision of an overflow in case of overfilling of the brine tank should also be provided to the “push fit” elbow on the side of the tank.
7) Connect the transformer provided to a continuous electrical supply with the power offer. Plug the flying lead from the transformer into the electrical connection on the controller. Ensure flying lead cannot get caught on the camshaft or any moving parts on the softener valve.
Preparing and putting softener into service
8) Now the all the connections have been completed put approximately 5 litres of water into the brine tank. You may also at this point put a quantity of salt into the tank. Do not allow the salt level in the brine tank to exceed the height of the overflow. The amount of salt used will depend on the type and model of the softener you have, you should never let the brine tank become empty of salt and it is advisable to check the salt levels on a regular basis until a usage pattern has been established.
9) You should now complete any programming instructions that may apply to your particular softener. During the commissioning process an initial regeneration you can confirm that the softener has no leaks from the installation valves and that the water runs free. This regeneration will also assist in cleaning any potential air locks that may be present within the system. The regeneration will also reset any internal meter or timer devices that dictate the frequency of the regeneration cycle. Use this setting to set the frequency of regeneration. Set to 2 if unsure.
Tel - 0845 10 80 680
Email - info@gmautoflow.co.uk