Glow Worm 24ci / 18si INSTRUCTION FOR USE INSTALLATION AND SERVICING (4000123942-2 07/03)

4000123942-2 07/03
Instructions for Use
Installation and Servicing
T o be left with the user
24ci
G.C. No. 47-047-19
Fanned Flue
Combination Boiler
G.C. No. 41-047-61
Fanned Flue
System Boiler
18si shown
Hepworth Heating Ltd., Nottingham Road, Belper, Derbyshire. DE56 1JT
Guarantee Registration
Thank you for installing a new Glow-worm appliance in your home.
Glow-worm appliances' are manufactured to the very highest standard so we are pleased to offer our customers’ a
Comprehensive Guarantee.
This product is guaranteed for 24 months from the date of installation or 30 months from the date of manufacture,
whichever is the shorter, for parts. In addition this product is guaranteed for 12 months from the date of installation or
18 months from the date of manufacture, whichever is the shorter, for labour.
The second year of the parts guarantee, from the beginning of the 13th month onwards after installation, is
conditional upon the boiler having been serviced by a CORGI registered gas installer, in accordance
with the manufacturer's recommendations. We strongly recommend regular servicing of your gas appliance, but
where the condition is not met, any chargeable spare parts or components issued within the applicable guarantee
period still benefit from a 12 month warranty from the date of issue by the manufacturer.
We recommend you complete and return as soon as possible your guarantee registration return literature, supplied in
the document envelope.
If your guarantee registration return literature is missing you can obtain a copy by telephoning
Glow-worm Service on 00 44 (0)1773 828100.
RECORD YOUR GLOW-WORM APPLIANCE DIRECT BY CALLING
0208 247 9857
Customer Service:
Glow-worm GB Great Britain:
Tel. 00 44 (0)1773 828100
Fax. 00 44 (0)1773 828070
Hepworth Heating Ltd.,
Nottingham Road, Belper, Derbyshire. DE56 1JT
Glow-worm IE Ireland:
Tel. 00 353 (0)16305757
Fax. 00 353 (0)16305724
C & F
Quadrant Ltd.,
Quadrant House,
Chapelizod, Dublin 20
Technical Advice Line:
Tel. 00 44 (0)1773 828300
4000123942-2
General and Sales enquiries :
Tel. 00 44 (0)1773 824141
Fax. 00 44 (0)1773 820569
(0)
2
Contents
CONTENTS DESCRIPTION SECTION PAGE No.
Important Information 4 Draining and Filling 5
INSTRUCTION
FOR USE
INSTALLATION
INSTRUCTIONS
Appliance Introduction 5 Appliance Safety Devices 6 Maintenance and Servicing 6 User Controls and Lighting 7 Analogue Programmer 24ci only 8 Digital Programmer Kit 24ci only 8
Technical Data 1 11 General Information 2 12 Heating System Design 3 13 Domestic Hot Water System Design 24ci only 415 Boiler Schematic 24ci 516 Boiler Schematic 18si 5a 16 Boiler Location, flue and ventilation 6 17 Fixing Jig 7 18 Piping System Installation 8 19 Boiler installation 9 20 Horizontal Telescopic Top Flue Installation 10 21 Horizontal Top Flue Installation 10a 23 Electrical Connection 11 25 Commissioning 12 27 Changing Gas Type 13 29 Bypass Settings 14 29
SERVICING
INSTRUCTIONS
Routine Cleaning and Inspection 15 30 Fault Finding 16 34 Wiring Diagram 24ci 17 40 Wiring Diagram 18si 17 41 Replacement of Parts 18 42 Spare Parts 19 52
3
4000123942-2
Important Information
Gas safety (Installation and use) Regulations
In your interests and that of gas safety, it is the law that ALL gas appliances are installed and serviced by a competent person in accordance with the regulations.
Gas leak or fault
WARNING: If a gas leak or fault exists or is suspected, turn the
boiler off and consult the local gas supply company or your installation/service company.
Testing and Certification
This boiler is tested and certificated for safety and performance. It is therefore important that no alteration is made to the boiler, without permission, in writing, from Hepworth Heating Ltd.
Any alteration not approved by Hepworth Heating Ltd., could invalidate the certification, boiler warranty and may also infringe the current issue of the Statutory Requirements. The requirements are: The installation of this boiler must be carried out by a competent person in accordance with the current rules in force in the countries of destination at the time of installation, for Ireland, install in accordance with I.S.813 "Domestic Gas Installation". Manufacture's instructions supplied must not be taken as overriding statutory requirements.
CE Mark
This boiler meets the requirements of Statutory Instrument No. 3083 The boiler (Efficiency) Regulations, and therefore is deemed to meet the requirements of Directive 92/42/EEC on the efficiency requirements for new hot water boilers fired with liquid or gaseous fuels.
Type test for purposes of Regulation 5 certified by: Notified body 0049.
Product/production certified by: Notified body 0049. The CE mark on this appliance shows compliance with:
1. Directive 90/396/EEC on the approximation of the laws of the Member States relating to appliances burning gaseous fuels.
2. Directive 73/23/EEC on the harmonization of the Laws of the Member States relating to the electrical equipment designed for use within certain voltage limits.
3. Directive 89/336/EEC on the approximation of the Laws of the Member States relating to electromagnetic compatibility.
Control of Substances Hazardous to Health
The adhesives and sealants used in this appliance are cured and give no known hazard in this state.
Insulation pads / ceramic fibre
These can cause irritation to skin, eyes and the respiratory tract. If you have a history of skin complaint you may be suscepti­ble to irritation. High dust levels are usual only if the material is broken. Normal handling should not cause discomfort, but follow normal good hygiene and wash your hands before eating, drinking or going to the lavatory. If you do suffer irritation to the eyes or severe irritation to the skin seek medical attention. The insulation is composed of non-combustible material.
Electrical Supply
WARNING: This boiler must be earthed. All system components shall be of an approved type and shall
be connected in accordance with the current issue of BS7671 and any applicable local regulations.
External wiring must be correctly earthed, polarised and in accordance with the relevant standards.
In GB this is BS 6891. In IE this is the current edition of I.S.813 "Domestic gas
installation". Connection of the boiler and system controls to the mains
supply must be through a common isolator and must be fused at 3A, maximum. This method of connection must be by a fused double pole isolating switch, with a minimum contact separation of 3mm on both poles. The switch should be readily accessible and preferably adjacent to the appliance. It should supply the appliance only and be easily identifiable as so doing.
Alternatively, an unswitched shuttered socket outlet and 3A fused 3 pin plug, both to the current issue of BS1363 may be used provided that they are not used in a room containing a bath or shower.
o
Wiring to the boiler must be PVC 85 than 0.75mm
Manual Handling Guidance
During the appliance installation it will be necessary to employ caution and assistance whilst lifting as the appliance exceeds the recommended weight for a one man lift.
In certain situations it may be required to use a mechanical handling aid.
Take care to avoid trip hazards, slippery or wet surfaces.
Heating System Controls
The heating system must be controlled as described in the relevant part of the current issue of :
Building Regulations, approved document L1, and the references:
1) GIL 59, 2000: Central heating system specification (CheSS) and
2) GPG 302, 2001: Controls for domestic central heating system and hot water. BRECSU.
3) The domestic heating and hot water guide to the building regulations 2001.
Thermostatic radiator valves may be installed, however they must not be fitted in a room where the room thermostat is located.
Air in the heating system
Persistent air in the heating system may indicate leaks in the system or corrosion taking place. Call your Installation/Servicing company.
Protection Against Freezing
The appliance has a built in frost protection programme as long as the electricity and gas are left switched on.
This device operates the burner and system pump when the temperature inside the boiler falls below 6
Any other exposed areas of the system should be protected by a separate frost thermostat.
2
(24/0.20mm).
C insulated cable, not less
0
C.
4000123942-2
4
Draining and Filling
Caution: The boiler is installed as part of a sealed system which must only be drained and filled by a competent person.
If the mains electricity and gas are to be turned off for any long periods during severe weather, it is recommended that the whole system, including the boiler, refer to diagram 1, should be drained to avoid the risk of freezing. Make sure that, if fitted, the immersion heater in the cylinder is switched off.
If in doubt, consult your servicing company.
24ci Only
• If the boiler loses water: the pressure will be indicated, see diagram 1 (a) and the boiler ON indicator (b) will flash red indicating a fault. Fill the system by the filling device (c) at the bottom of the boiler until the pressure gauge reads 1.0 bar. A mains inlet pressure of 2.0 bar is required to reach a fill pressure of 1.0 bar.
Reset boiler: refer to diagram 2, turn the On/Off switch to (0), wait for five seconds. Turn the On/Off switch to ( I ) to reset the appliance.
18si Only
• If the boiler loses water: the pressure will be indicated, see
diagram 1 (a) and the running lamp (b) will flash red indicating a fault. Fill the system with the external filling device until the pressure gauge reads 1.0 bar.
Reset boiler: refer to diagram 2, turn the On/Off switch to (0), wait for five seconds. Turn the On/Off switch to ( I ) to reset the appliance.
• Warning: Take care not to overfill the boiler. At a pressure of
2.5 bar or above indicating over pressure, the boiler ON indicator (b) will flash red indicating a fault. The pressure must be reduced to 1.0 bar by opening the drain valve, refer to diagram 1. If the fault continues call the relevant Servicing organisation or Glow-worm Service using the telephone number on the inside front cover of this literature.
(a)
9744
BOILER DRAIN VALVE
(b)
(c)
Diagram 1
Appliance Introduction
The 24ci and 18si boilers are wall mounted modulating boilers with electronic ignition providing central heating and hot water.
The boiler is of the II Gas (G20) as distributed in the United Kingdom, but can be converted to use Butane (G30), Propane (G31) with the
appropriate kit. The boiler has a fan assisted balanced flue which both
discharges the products of combustion to and draws the combustion air from the outside of the room.
This boiler is not suitable for outdoor installation. This boiler may be installed in any room, although particular
attention is drawn to the installation of a boiler in a room containing a bath or shower where reference must be made to the relevant requirements.
Any electrical switch or boiler control utilising mains electricity should be placed so that it cannot be touched by a person using the bath or shower.
In GB this is the current I.E.E. WIRING REGULATIONS and BUILDING REGULATIONS.
In IE reference should be made to the current edition of I.S.813 "Domestic Gas Installations" and the current ETCI rules.
category and is for use with Natural
2H3+
The central heating and domestic hot water (24ci only) temperatures are user adjustable.
24 ci Only. Domestic hot water demand always has priority over heating demand.
The boiler is designed for use as part of a sealed water central heating system with fully pumped circulation. The pump, expansion vessel and associated safety devices are all fitted within the boiler.
The boiler can be installed against either an external wall or on an adjacent inside wall, that is, the flue system will pass directly to the rear or to either side to the terminal fitted on the outside wall face.
These instructions should be carefully followed for the safe and economical use of your boiler. The 'User Controls and Lighting' section describes how to safely use the boiler.
Note: The boiler serial number is marked on the data label attached to the rear of the control box.
Accessories
A range of accessories are available. For further information contact your supplier.
5
4000123942-2
Appliance Safety Devices
Air flow rate safety device
If the flue is obstructed, the built in safety system will turn the boiler OFF, the fan will continue to run. The boiler will be ready to operate when the fault has been cleared.
Overheating safety
In the event of the boiler overheating the safety devices will cause a safety shutdown. If this happens, call your Installation/ Servicing company.
Electrical supply failure
The boiler will not operate without an electrical supply. Normal operation of the boiler should resume when the electrical supply is restored.
Reset any central heating system controls, to resume normal operation.
If the boiler does not resume normal operation turn the mains reset switch off and on. If the boiler does not resume normal operation it is advisable to consult your installation / servicing company.
Frost protection
The appliance has a built in frost protection device that protects the boiler from freezing. With the gas and electric supplies ON and irrespective of any room thermostat setting, the frost protection device will light the boiler when the temperature of the boiler water falls below 6°C.
When the temperature reaches 16°C, the boiler stops.
Any other exposed areas of the system should be protected by a separate frost thermostat.
Heating safety valve
CAUTION: A heating safety valve with a discharge pipe is fitted to this boiler.
The valve MUST NOT BE TOUCHED except by a competant person. If the valve discharges at any time, switch the boiler off and isolate it from the electrical supply. Contact your installation/ service company.
Maintenance and Servicing
Cleaning
WARNING: This appliance contains metal parts (components)
and care should be taken when handling and cleaning with particular regard to edges of sheet metal parts to avoid any possibility of personal injury.
The boiler casing can be cleaned with a damp cloth, followed by a dry cloth to polish.
Do not use abrasive or solvent cleaners.
Maintenance and Servicing
To ensure the continued efficient and safe operation of the appliance it is recommended that it is checked and serviced as necessary at regular intervals, but in general once a year should be enough, refer to guarantee registration on the inside front cover of this literature.
If this appliance is installed in a rented property there is a duty of care imposed on the owner of the property by the current issue of the Gas Safety (Installation and Use) Regulations, Section 35.
Servicing/maintenance should be carried out by a competent person in accordance with the rules in force in the countries of destination.
To obtain service, please call the relevant service organisation or Glow-worm Service using the telephone number on the inside front cover of this literature.
Please be advised that the ‘Benchmark’ logbook should be completed by the engineer on completion of commissioning and servicing.
All CORGI Registered Installers carry a CORGI ID card, and have a registration number. Both should be recorded in your benchmark Logbook. You can check your installer is CORGI registered by calling CORGI direct on: 00 44 (0) 1256 372300.
Spare Parts
REMEMBER, When replacing a part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not use reconditioned or copy parts that have not been clearly authorised by Hepworth Heating Ltd.
If a part or advice is required contact the relevant service organisation or Glow-worm Service using the telephone number on the inside front cover of this booklet.
Please quote the name of the appliance, this infomation will be on the name badge on the front of the appliance.
4000123942-2
6
User Controls and Lighting
Central heating temperature selector
minimum setting (approx. 38˚C) up to maximum setting (approx. 87°C). It is supplied factory set to 38°C to 73°C
2
4
Pressure gauge (bar) and temperature gauge (°C)
Domestic hot water temperature selector (24ci Only)
minimum setting approx. 38°C up to maximum setting 65°C.
The ECO setting is ideally suited for all the requirements of normal family use (showers, washing up etc.). The maximum setting should be reserved for occasional use when very hot water is required.
Boiler ON/RUNNING
5
(green) indicator (fault indicated by light flashing red)
3
On/Off switch
1
PROGRAMMER
6
24 ci Only
11887
1. Lighting the boiler :
Make sure that:
• The boiler is connected to the electrical supply.
• The gas service cock is open.
• The room thermostat is calling for heat.
• Turn the On/Off switch to ON ( I )
The boiler ON indicator will illuminate green.
1
5
2. Stop the boiler :
• Turn the On/Off switch to OFF ( 0 ) the electrical supply is OFF.
1
3. Domestic hot water adjustment
(24ci Only) :
Domestic hot water between approx. 38°C and 50°C
3
ECO Maximum
recommended for constant use
Occasional use for water above approx. 50˚C
4. Heating temperature adjustment :
Winter: Set the
control knob anywhere between the 5
Summer: Set the control knob to (24 ci only)
segments
2
5. If a fault occurs (indicated by
red flashing light) :
Reset boiler: Turn the On/Off switch to ( 0 ), wait for five seconds. Turn the On/Off switch to ( I ) the boiler is reset. If the fault continues call relevant service organisation or Glow-worm Service using the telephone number on the inside front cover of this literature.
6. Pressure gauge:
The boiler pressure gauge will show a reading
between 1.0 and 1.5 bar. Refer to Section Draining and Filling if required.
5
4
Domestic hot water OFF
Diagram 2
7
4000123942-2
Programmer Instructions for Use
Analogue Programmer (24 ci only)
No. A20086. Fitted as standard.
Part
Setting the time, see diagram 3
• Rotate the dial clockwise, by hand, until the indicator arrow is pointing to the current time.
Note: The time is set in 24 hour format.
Setting the programme “on and off” times, see diagram 3
• Select the on times by pushing the black tappets to the outside.
• Select the off times by pushing the black tappets to the inside.
To override or advance the programmer The clock has a manual on/off switch which operates as
follows: Upper position I : Heating on continuously
Middle position Lower position 0 : Heating off
To override or advance the programmer
: Heating on timed
Digital Programmer Kit. 24ci Only Part No. A20087. Not fitted as standard.
KEYPAD DESCRIPTION
See diagram 4 for position of keypads as described below,
Time/Automatic Run Mode selection
Prog. Programme selection Res.* Reset clears all settings
ON/OFF selector in Prog. Mode, Manual Override selector in Run Mode
±1h* Summer/Winter time setting
h Sets the Hour (12: - - AM) m Sets the Minute (- -: 01 AM) Day Sets Day(s) for time and programmes
*Recessed keys; use a pen point to press
11460
OFF TIMES
ON TIMES
BLACK TAPPETS
INDICATOR ARROW
Diagram 4
LCD Display
The LCD incorporates a number of different elements to display various data and information.
Diagram 3
Programmes
The Digital Programmer will accept up to 20 events
Each event consists of:
1. An ON or OFF command
2. Time of day (Hour and Minute)
3. Single day or multiple days
An event is required for each ON and OFF.
4000123942-2
8
Programmer Instructions for Use
NOTE: MULTIPLE ON OR OFF EVENTS MAY BE PROGRAMMED, SEE EXAMPLE.
BEFORE PROCEEDING WITH SETTING THE TIME AND PROGRAMMING THE UNIT, PRESS THE RESET KEY TO CLEAR ALL DATA FROM THE MEMORY.
Selecting AM/PM or 24 Hour Time
After pressing reset, the display may show AM (below). The numbered day symbols will be flashing on and off.
If the display does not show AM, it is in 24 hour time. To change to AM/PM mode, press and hold the h key and press the key once. AM will appear in display.
If display is in AM/PM mode and 24 hour time mode is desired, press and hold the h key, press the
±1h key once.
±1h
Setting the Time
IF THE h AND m KEYS ARE HELD DOWN LONGER THAN 2 SECONDS, THE NUMBERS WILL ADVANCE RAPIDLY.
Press and hold the (If British Summer Time is in effect, press ±1h first)
1. Press h to advance to the current hour (while holding down the
2. Press m to advance to the current minute (while holding down the
3. Press Day repeatedly to advance to current day (while holding down the
key during the following:
key)
key)
key)
Day Key Selections
Press Day Key Display Shows Days 0 times 1 2 3 4 5 6 7 Every Day 1 time 1 2 3 4 5 6 Mon.–Sat. 2 times 1 2 3 4 5 Mon.–Fri. 3 times 6 7 Sat. & Sun. 4 times 1 Monday 5 times 2 Tuesday 6 times 3 Wed. 7 times 4 Thursday 8 times 5 Friday 9 times 6 Saturday 10 times 7 Sunday NOTE: If the days are flashing, it indicates the day of the week
was not set when setting the time. The timer cannot be programmed unless the day of the week is entered.
Manual GMT/BST Time Changeover
Each year, in the Spring, press ±1h to advance the time an hour. In the Autumn, press ±1h to set back an hour.
Programming 24 Hour or 7 Day Schedules
It may be helpful to write out the programme schedules before beginning.
THE CURRENT TIME OF DAY AND DAY OF WEEK MUST BE SET PRIOR TO PROGRAMMING. SEE "SETTING THE TIME"
Example
Event 1: ON at 7:00AM Monday through Saturday Event 2: OFF at 5:00PM Monday through Friday Event 3: OFF at 7:00PM Saturday
Three events need to be entered. Press Prog. key only once. Display shows:
Event 1 (ON at 7:00AM Monday through Saturday) Press key once. ON symbol appears Press h key to 07AM Press m key once to 00 Press Day key once 1 2 3 4 5 6 is displayed Press Prog. key to enter
Event 2 (OFF at 5:00PM Monday through Friday) Press Press h key to 05PM Press m key once to 00 Press Day key two times 1 2 3 4 5 is displayed Press Prog. key to enter
Event 3 (OFF at 7:00PM Saturday) Press Press h key to 07PM Press m key once to 00 Press Day key 9 times until only 6 is displayed Press Prog. key to enter Press IF AN "ON" TIME WAS PROGRAMMED THAT IS EARLIER IN
THE DAY THAN THE CURRENT TIME, PRESS ONCE TO TURN THE TIMER "ON". (IT DOES NOT "LOOK BACK" TO DETERMINE IF IT SHOULD BE ON OR OFF AFTER PROGRAMMING).
IF 24 HOUR TIME CONTROL (SAME SCHEDULE EVERY DAY OF THE WEEK) IS DESIRED, IGNORE Day KEY.
If an ON or OFF symbol is not entered, the ON symbol will flash, and programme will not be accepted.
key twice. OFF symbol appears
key twice. OFF symbol appears
key to enter Run Mode
9
4000123942-2
Programmer Instructions for Use
Event Review
To review the programs at any time, press Prog. key. Events will appear in the order they were entered with repeated presses of the Prog. key. After all events have been reviewed, the blank display will appear to allow entering another event. Another press of the Prog. key will display the number of free events available, such as Fr 16 if 4 events have been entered.
Manual Override
While in the Run Mode, pressing the key once will reverse the current mode; ON to OFF or OFF to ON. The symbol appears in the display to indicate a temporary override. At the next scheduled switching time, automatic control resumes, eliminating the override.
CONTINUOUS OPERATION: While in the Run Mode, press the
Pressing the permanently. symbol appears in display.
To terminate a continuous override, press the appears in the display.
key twice to turn the output to permanently ON.
symbol appears in display.
key three times will turn the output OFF
key until
Changing an Event
Select the event to be changed with the Prog. key. A new set of days may be selected with the Day key just as in initial programming.
Hours and minutes can be changed with the h and m keys. Press Prog. or
key to store the new programme.
Deleting an Event
To delete only one or a few events: Press Prog. key until the
desired program is displayed. Press m key to :59 and press once more to blank out. Press h key to 11PM and press once more to blank out. Press
enter the Run Mode. Using the reset key will delete ALL events, the time of day, and day of the week.
key, display will flash for several seconds and then
Troubleshooting
PROBLEM: Days are flashing, pressing any key does nothing except key turns output ON and OFF. SOLUTION: Time of Day and Day of Week have not been set.
See "SETTING THE TIME" This is the condition after a reset. If the timer is found in this
condition after it has been installed, programmed and operating for a while, it may indicate that interference has disrupted the microprocessor causing a loss of programme information.
A second, but very unlikely cause of loss of programme is a power failure with the backup capacitor low or dead. Check by disconnecting power and monitoring how long the capacitor keeps the time of day in the display. Typically, the capacitor will maintain the time and programmes for 4 days, but not more than 5 days.
PROBLEM: Time of day was set while holding the down, but days are still flashing.
SOLUTION: Current day of week was not set while holding
down
PROBLEM: It is 10AM and an ON event for 8AM was entered, but the output is not ON. Display shows the
SOLUTION: After programming, the timer does not "look back" to determine if it should be ON. Press the
override) to turn the output ON; appears in display. The timer will assume automatic operation at the next programmed event.
PROBLEM: An event for 8AM Monday through Friday was entered,
but it will not accept it and SOLUTION: The ON
of the program. ON or OFF must be selected.
the key. See "SETTING THE TIME"
symbols.
key (temporary
is flashing.
or OFF was not entered as part
key
and
4000123942-2
10
1 Technical Data
24ci
Heating
Heat input (max) NET Q 26,94 kW
91,200 BTU/H
Heat input (min) NET Q 9,91 kW
33,820 BTU/H
Heat output (max) NET P 23,6 kW
81,550 BTU/H
Heat output (min) NET P 8,9 kW
30,370 BTU/H Efficiency - Sedbuk D 78,3% Maximum heating temperature 87° C Expansion vessel effective capacity 5 litres Expansion vessel charge pressure 0,5 bar Maximum system capacity at 75°C 110 litres Safety valve, maximum service pressure 3 bar
Hot water
Heat input (max) NET Q 26,94 kW
91,200 BTU/H Heat input (min) NET Q 9,91 kW
33,820 BTU/H Heat output (max) NET P 23,6 kW
81,550 BTU/H Heat output (min) NET P 8,9 kW
30,370 BTU/H Maximum hot water temperature 60 °C Minimum hot water temperature 38 °C Specific flow rate (for 35°C temp rise) 9,8 litres/min. Threshold flow rate 1,7 litres/min. Maximum supply pressure 10 bar Minimum supply pressure 0,5 bar
Combustion
Products outlet diameter 60 mm Fresh air inlet diameter 100 mm Combustion products values CO (60 ppm)
CO2 (6,7%)
NOx (48ppm)
Electrical
Electrical supply 230 V ~ 50Hz Electrical rating 122 W fused at 3A Level of protection IPX4D Fuse rating 125mA
Natural Gas (G20)
Ø Burner injector 1,2 mm Inlet pressure 20 mbar Maxi. Burner pressure 12,2 mbar Mini. Burner pressure 2,25 mbar Gas rate maximum 2,74 m3/h Gas rate minimum 1,16 m3/h
Butane Gas (G30)
Ø Burner injector 0,73 mm Inlet pressure 29 mbar Maxi. Burner pressure 23,2 mbar Mini. Burner pressure 4,41 mbar Gas rate maximum 2,01 kg/h Gas rate minimum 0,87 kg/h
18si
Heating
Heat input (max) NET Q 20,7 kW
70,628 BTU/H
Heat input (min) NET Q 11 kW
37,532 BTU/H
Heat output (max) GROSS P 18,4 kW
62,780 BTU/H
Heat output (min) GROSS P 8,9 kW
30,366 BTU/H Efficiency - Sedbuk D 78,3% Maximum heating temperature 87° C Expansion vessel effective capacity 5 litres Expansion vessel charge pressure 0,5 bar Maximum system capacity at 75°C 110 litres Safety valve, maximum service pressure 3 bar
Combustion
Products outlet diameter 60 mm Fresh air inlet diameter 100 mm Combustion products values CO (25 ppm)
CO2 (5,5%)
NOx (48ppm)
Electrical
Electrical supply 230 V ~ 50Hz Electrical rating 122 W fused at 3A Level of protection IPX4D Fuse rating 1,25mA
Natural Gas (G20)
Ø Burner injector 1,2 mm Inlet pressure 20 mbar Maxi. Burner pressure 8 mbar Mini. Burner pressure 2,25 mbar Gas rate maximum 2,2 m3/h
Butane Gas (G30)
Ø Burner injector 0,73 mm Inlet pressure 29 mbar Maxi. Burner pressure 14,8 mbar Mini. Burner pressure 4,41 mbar Gas rate maximum 1,63 kg/h Gas rate minimum 0,87 kg/h
Propane Gas (G31)
Ø Burner injector 0,73 mm Inlet pressure 37 mbar Maxi. Burner pressure 19,2 mbar Mini. Burner pressure 5,4 mbar Gas rate maximum 1,61 kg/h Gas rate minimum 0,83 kg/h
Propane Gas (G31)
Ø Burner injector 0,73 mm Inlet pressure 37 mbar Maxi. Burner pressure 29,8 mbar Mini. Burner pressure 5,4 mbar Gas rate maximum 2,01 kg/h Gas rate minimum 0,83 kg/h
11
4000123942-2
The 24ci and 18si are delivered in two separate packages:
• The boiler including fixing jig complete with isolating valves and fittings.
• The flue system.
Net lift weight (boiler only) 24ci 34 kg 18si 32 kg
Gross lift weight (boiler, fixing jig and packaging) 24ci 39 kg 18si 36 kg
1 T echnical Data
11658
184
740
310
2 General Information
IMPORTANT NOTICE.
Where no British Standards exists, materials and equipment should be fit for their purpose and of suitable quality and workmanship.
Refer to Manual Handling Operations, 1992 regulations. The installation of this boiler must be carried out by a competent
person in accordance with the rules in force in the countries of destination.
Manufacturer’s instructions must not be taken as overriding statutory requirements.
2.1 Sheet Metal Parts
WARNING: When installing the appliance, care should be taken to avoid any possibility of personal injury when handling sheet metal parts.
2.2 Statutory Requirements
The appliance is suitable only for installation in GB and IE and should be installed in accordance with the rules in force.
In GB the installation of the boiler MUST be carried out by a competent person as discribed in the following regulations:
Manufacturer’s instructions, supplied. The Gas Safety (Installation and Use) Regulations. The appropriate Building Regulations, either The Building
Regulations, The Building Regulations (Scotland), The building Regulations (Nothern Ireland).
410
Diagram 1.1
The Water Fittings Regulations or Water Bylaws in Scotland. The Health and Safety at Work Act, Control of Substances Hazardous to Health (COSHH).
The Current I.E.E. Wiring Regulations. Where no specific instructions are given, reference should be
made to the relevant British Standard Code of Practice. In I.E the installation must be carried out by a competent person
and installed in accordance with the current edition of I.S. 813 "Domestic Gas Installations", the current Building Regulations
and reference should be made to the current ETCI rules for electrical installation.
In GB the following Codes of Practice apply: BS4814, BS5440 Part 1 and 2, BS5449, BS5546 Part 1, BS6700,
BS6798, BS6891 and BS7074 Part 1 and 2, BS7478, BS7593, BS7671.
In IE: I.S.813, BS5546, BS5449, BS7074, BS7593. Manufacturer’s notes must not be taken as overriding statutory
requirements.
BSI Certification
This boiler certificated to the current issue of EN 483 for performance and safety.
It is important that no alteration is made to the boiler, without permission, in writing, from Hepworth Heating Ltd.
Any alteration that is not approved by Hepworth Heating Ltd., could invalidate the warranty and could also infringe the current issue of the Statutory Requirements.
4000123942-2
12
2 General Information
2.3 Gas Supply
The gas installation must be in accordance with the relevant standards.
In GB this is BS 6891. In IE this is the current edition of I.S.813 "Domestic gas
installation".
The supply from the governed meter must be of adequate size to provide a steady inlet working pressure of 20mbar (8in wg) at the boiler.
3 Heating System Design
Bypass fully shut
1
Open 1/4 turn
2
Open 1/2 turn
3
Open 1 turn
4
50
40
30
20
Important Notice
If your boiler has been converted to use L.P.G. Propane the following note applies:
Propane cylinders are under pressure and should never be stored or used indoors residentially.
They should only be kept outside. Under no circumstances should L.P.G. Propane cylinders be
fitted or stored in basement areas or boiler houses. On completion, test the gas installation for soundness using the
pressure drop method and suitable leak detection fluid, purge in accordance with the above standard.
9700
1
2
3
4
5
10
Open 2 turns
5
The installation of the boiler must comply with the requirements of the current issue of BS6798, in Ireland, refer also to the current edition of I.S.813"Domestic Gas Installations".
In GB it is necessary to comply with the Water Supply (Water Fittings) Regulations 1999 (for Scotland, the Water Byelaws 2000, Scotland).
To comply with the Water Regulations your attention is drawn to: The Water Regulations guide published by the Water Regulation Advisory Service (WRAS) which gives full details of the requirements.
In IE the requirements given in the current edition of I.S.813 "Domestic Gas Installations" and the current Building Regulations must be followed.
• The 24ci and 18si are for use with sealed central heating systems.
• Heating surfaces may consist of radiators, convectors or fan assisted convectors.
• The safety valve is an integral part of the boiler and it cannot be adjusted.
• The circulation pump is integral with the boiler.
• Pipe sectional areas shall be determined in accordance with normal practices, using the output/pressure curve (diagram 3.1). The distribution system shall be calculated in accordance with the output requirements of the actual system, not the maximum output of the boiler. However, provision shall be made to ensure sufficient flow so that the temperature difference between the flow and return pipes be less than or equal to 20°C. The minimum flow rate is shown in table 1.
Available pressure (kPa)
0 500 1000
(10 kPa = 1 m WG)
Flow rate through heating system (I/h)
Diagram 3.1
• The system can be fitted with a lockable control valve if necessary in the main flow or return pipes shown as valve 'A'
in diagram 3.2.
• The piping system shall be routed so as to avoid any air pockets and facilitate permanent venting of the installation. Bleed fittings must be provided at every high point of the system and on all radiators.
• The total volume of water permitted for the heating system depends, amongst other things, on the static head in the cold condition. The expansion vessel on the boiler is pressurised at
0.5 bar and allows a maximum system volume of 110 litres for an average temperature of 75°C and a maximum service pressure of 3 bar. This pressure setting can be modified at commissioning stage if the static head differs. An additional expansion vessel can be fitted to the system if required, see
diagram 3.2.
Guidance on vessel sizing is also given in a current issue of a BS5449 and BS7074 Part 1, for IE refer to the current edition of I.S.813 "Domestic Gas Installations".
• Provision shall be made for a drain valve at the lowest point of the system.
• Where thermostatic radiator valves are fitted, not all radiators must be fitted with this type of valve, and in particular, where a room thermostat is installed.
• In the case of an existing installation, it is ESSENTIAL that the system is thoroughly flushed prior to installing the new boiler, using a proprietary product from Fernox or Sentinel.
13
4000123942-2
3 Heating System Design
3.1 Bypass
• The boiler is fitted with an adjustable automatic bypass. Ensure that under no circumstances does the flow rate drop below the figure specified, see table 1.
• A system bypass is not required on the central heating circuit unless the system controls will not ensure a minimum water flow rate.
• Where a bypass has to be fitted, the bypass must be placed at least 1.5 metres away from the appliance, see diagram 3.2.
3.2 Filling the system 24ci.
• An integral filling device is fitted to the boiler to initially fill the system and replace water lost during servicing, see the relevant
parts of diagram 2 controls and lighting and diagram 1.
Additional expansion vessel
(if required)
Domestic
water
Boiler
Filling device
3.3 Filling the system 18si.
• Provision for filling the system must be made. The methods are shown in diagram 3.3. There must be no permanent connection to the mains water supply, even through a non­return valve.
NOTE: It is important that fittings used for connection to potable water comply with the water undertakings requirements.
TABLE 1. FLOW RATE
Model Minimum flow rate
24ci 16.94 litres per minute
18si 13.21 litres per minute
This is equal to 20°C differential at maximum heat input.
SUPPLY
PIPE
9898
BOILER
CONTROL
VALVE
11593
24ci
Hot water out
Cold supply in
Drain point
Control
Drain point
valve
Bypass
valve
*
'A'
Flow
Heating
circuit
Boiler
Additional Bypass valve
*
(if required)
Return
Additional expansion vessel (if required)
10157
HEATING CIRCUIT
Method 1
BOILER
RETURNFLOW
CONTROL
VALVE
DRAIN POINT
PREVENTION DEVICE
RETURNFLOW
DOUBLE
CHECK
VALVE
HOSE
UNION
HOSE
UNION
TYPE CA BACKFLOW
TEMPORARY CONNECTION
Control
Drain point
18si
4000123942-2
valve
Bypass
valve
*
'A'
Flow
Heating
circuit
Additional Bypass valve
*
(if required)
Return
Diagram 3.2
14
HEATING CIRCUIT
Method 2
CONTROL
VALVE
DRAIN POINT
CONTROL
VALVE
AIR GAP
TUNDISH
SUPPLY
PIPE
Diagram 3.3
4 Domestic Hot Water System Design. 24ci Only
General - All domestic hot water circuits, connections, fittings
must be in accordance with the relevant standards and water supply regulations.
For GB: Guidance G17 to G24 and recommendation R17 to R24 of the Water Regulation Guide.
For IE: The current edition of I.S.813 "Domestic Gas Installations".
• Copper tubing or plastic Hep hot water system. Unnecessary pressure losses should be avoided.
• Provision shall be made for a drain valve at the lowest points of the system.
0 may be used for the domestic
2
• The flow restrictor, supplied in the document envelope, must be fitted as diagram 7.1, limiting the flow through the boiler to a maximum of 10 litres/min.
• The boiler will operate with a minimum supply pressure of 0.5 bar, at a reduced flow rate.
Best operating performance will be obtained from a supply pressure of 1 bar or greater.
4.1 Hard Water Areas
In areas where the water is 'hard', more than 200mg/litre, it is recommended that a proprietary scale reducer is fitted in the cold water supply to the boiler.
15
4000123942-2
1 - Fan. 2 - Air pressure switch. 3 - Heat exchanger. 4 - Overheat thermostat. 5 - Combustion chamber. 6 - Expansion vessel. 7 - Ignition electrode. 8 - Burner. 9 - Flame sense electrode. 10 - Pump. 11 - Heating thermistor. 12 - Ignition unit. 13 - By-pass. 14 - Gas control valve. 15 - Loss of water sensor. 16 - Domestic heat exchanger 17 - 3 way valve 18 - Domestic water flow sensor 19 - Filter cold water inlet 20 - Filling system 21 - Discharge safety valve (3bar) 22 - Drain valve 23 - Heating filter
5 Boiler Schematic 24ci
9899
FITTED TO REAR OF APPLIANCE
A - Heating flow B - Domestic hot water outlet C - Gas D - Cold water inlet E - Heating return
5a Boiler Schematic 18si
1 - Fan. 2 - Air pressure switch. 3 - Heat exchanger. 4 - Overheat thermostat. 5 - Combustion chamber. 6 - Expansion vessel. 7 - Ignition electrode. 8 - Burner. 9 - Flame sense electrode. 10 - Pump. 11 - Heating thermistor. 12 - Ignition unit. 13 - By-pass. 14 - Gas control valve. 15 - Loss of water sensor. 16 - Heating filter. 17 - Discharge safety valve (3bar). 18 - Drain valve
Diagram 5.1
11450
FITTED TO REAR OF APPLIANCE
A - Heating flow. B - Gas. C - Heating return.
4000123942-2
Diagram 5a.1
16
6 Boiler Location, Flue and Ventilation
6.1 Boiler Location
The recommended clearances are shown in diagram 6.1. Note: The boiler must be mounted on a flat wall which is
sufficiently robust to take its weight when full. If in doubt, expert advice should be obtained.
The minimum acceptable spacings from the terminal to obstructions, other terminals and ventilation openings are shown in diagram 6.2. For Ireland the minimum distances for the flue terminal positionning must be those detailed in I.S.813 "Domestic Gas Installations".
The boiler must be installed so that the terminal is exposed to the external air.
6.2 Terminal guard, see diagram 6.3.
A terminal guard is required if persons could come into contact with the terminal or the terminal could be subject to damage.
If a terminal guard is required, it must be positioned to provide a minimum of 50mm clearance from any part of the terminal and to be central over the terminal.
A suitable terminal guard type K3 can be supplied by:
Tower flue components Ltd. Morley road Tonbridge Kent TN9 1RA
6.3 Flue options
There are various flue systems to choose from as follows: Horizontal telescopic top flue pack. Horizontal top flue pack. Vertical flue pack. Twin flue pack. Extensions, 90° and 45° bends. For detailed information refer to flue options guide. This is
available from your nearest stockist.
6.4 Cupboard or compartment ventilation
The boiler can be fitted in a cupboard or compartment without the need for permanent ventilation.
25mm
11652
20mm
5mm
*
above elbow
11508
MINIMUM SITING DIMENSIONS FOR THE POSITIONING OF FLUE TERMINALS MM
HORIZONTAL FLUES
A DIRECTLY BELOW, ABOVE OR
HORIZONTALLY TO AN OPENING, AIR BRICK, OPENING WINDOWS, AIR VENT, OR ANY
OTHER VENTILATION OPENING 300 B BELOW GUTTER, DRAIN/SOIL PIPE 75 C BELOW EAVES 200 D BELOW A BALCONY OR CAR PORT 200 E FROM VERTICAL DRAIN PIPES AND
SOIL PIPES 150 F FROM INTERNAL/EXTERNAL CORNERS
OR TO A BOUNDARY ALONGSIDE THE TERMINAL 300
G ABOVE ADJACENT GROUND OR
BALCONY LEVEL 300 H FROM SURFACE OR A BOUNDARY
FACING THE TERMINAL 600 I FACING TERMINALS 1200 J FROM OPENING (DOOR/WINDOW)
IN CAR PORT INTO DWELLING 1200 K VERTICAL FROM A TERMINAL 1500 L HORIZONTALLY FROM A TERMINAL 300
VERTICAL FLUES
M FROM ADJACENT WALL TO FLUE 300 N FROM ANOTHER TERMINAL 600 P FROM ADJACENT OPENING WINDOW 1000 Q ABOVE ROOF LEVEL 300
Diagram 6.2
*Note: It is permissible to
install the boiler with smaller clearances than those quoted PROVIDING that consideration is given for Servicing/Repairs.
600mm
450mm
*
300mm
Diagram 6.1
20mm
5mm
*
17
Diagram 6.3
4000123942-2
7 Fixing Jig
22mm
22mm
15mm
15mm
22mm
V
W
W
W
W
Z
Z
Z
Z
X
X
X
Y
Y
Y
A
B
C
D
E
The fixing jig is supplied within the boiler pack and is made up as follows : A - Heating flow isolating valve. B - 24ci only Domestic hot water outlet. C - Gas service cock. D - 24ci only Cold water inlet isolating valve. E - Heating return isolating valve.
Documentation Pack, inclusive
- Literature (not illustrated)
- Benchmark Book (not illustrated)
- Guarantee Registration form (not illustrated)
- Rewards Club leaflet (not Illustrated)
- Wiring Diagram (not illustrated)
- Flue restrictor (not illustrated)
Bag containing :
- 1 x 15mm green fibre washer (shown as "v" in diagram)
- Cold Water Inlet Restrictor
- 5 x 22mm fibre washers (shown as "w" in diagram)
Fittings Pack, inclusive
- Wall template
- Discharge Safety valve connection incl. Knurled nut and O ring seal 15mm compression fitting
- Discharge Safety Valve Instruction sheet
- 230V External connection instruction sheet
- Filling loop extension knob
- 230V External controls connection plug
Bag containing: (24ci only)
- 3 x 22mm Installation connection pipes
- 2 x 15mm Installation connection pipes
Bag containing: (24ci only)
- 4 x 22mm boiler connection pipes
- 1 x 15mm boiler connection pipe
Bag containing : (18si only)
- 3 x 22mm Installation connection pipes
Bag containing : (18si only)
- 2 x 22mm boiler connection pipes
- 1 x 15mm boiler connection pipe
Bag containing :
- 4 x 15mm fibre washers (shown as "x" in diagram)
- 4 x 22mm fibre washers - large bore (shown as "y" in diagram)
- 5 x 22mm fibre washers - small bore (shown as "z" in diagram)
11940a
Wall template
APPLIANCE HANGING BRACKET
FIXING JIG Inclusive Isolating Valves
Sealing Washers :
24ci 18si Description
V 1 (1) 1 (1) 15 mm Gas valve Connection only* W 4 (5) 2 (5) 22 mm - smal bore X 3 (4) 1 (4) 15 mm Y 3 (4) 3 (4) 22 mm - large bore Z 4 (5) 2 (5) 22 mm - smal bore
The quantity shown in bracket ( ) denotes the number supplied * It is essential that this green sealing washer is only fitted to the gas valve connection in the position shown in the Fixing Jig diagram
4000123942-2
18
Cold water inlet restrictor
24ci shown
Diagram 7.1
8 Piping System Installation
20mm
MIN.
C.H. flow
Gas supply
Cold water in
C.H. return
22mm. CENTRAL HEATING 15mm. DOMESTIC WATER 22mm. GAS SUPPLY
KEY
8.1 Cutting the flue hole
• Remove the wall template, follow the instructions given on the wall template.
• Position the wall template, taking due regard of the minimum clearances for the selected flue application, see diagram 8.1.
• Rear hole cutting
• Mark correct position of Top Rear flue outlet hole from template, then remove template, before cutting, for use, later.
• Side hole cutting
• Mark the horizontal centre line for the hole on the rear wall. Extend the horizontal centre line to the side wall and mark the vertical centre line of flue hole as shown in diagram 8.1.
IMPORTANT NOTE: When cutting the flue hole and when extending the flue centre line to a side wall, remember that the flue system must have a fall of about 35mm per metre of flue downward towards the terminal. There MUST never be a downward incline towards the boiler.
• Making allowance for the slope of the flue, cut hole in external wall, preferably using a core drill. For installations with internal and external access use a 105mm diameter core drill.
• For installations with internal access only use a 125 mm diameter core drill.
80 min.
184
MINIMUM SIDE CLEARANCE refer diagram
6.1
11943
8.2 Fixing jig, refer to diagram 7.1
IMPORTANT NOTE: Ensure that the fixing jig is fitted to a flat and true wall area for correct alignment with the boiler. If this cannot be achieved it is acceptable to pack out the fixing jig to obtain the correct alignment.
Side Flue - Check the horizontal centre line and reposition the template if necessary.
Rear Flue - Reposition the wall template over the hole in wall.
• Mark the securing position holes.
• Check that the fixing jig is level.
• Drill, plug and secure the jig to the wall, using suitable screws (not supplied) for the wall type and capable of supporting the total weight of the appliance.
8.3 Water connection
IMPORTANT NOTE: Do not subject the isolating valves to heat
from blowlamp, when making connection. Connect the system pipework to the fixing jig connection pipes
and the fixing jig isolating valves, observing the correct flow and return as shown in diagram 8.1.
8.4 Gas connection Gas Safety (Installation and use) Regulations
In your interests and that of gas safety, it is the law that ALL gas appliances are installed and serviced by a competent person in accordance with the above regulations.
• The whole of the gas installation, including the meter, should be inpected, tested for soundness and purged in accordance with the current issue of BS6891 and in IE the current edition of I.S.813 "Domestic Gas Installations".
24ci shown
Diagram 8.1
19
4000123942-2
9 Boiler Installation
9.1 Sheet metal parts
WARNING: When installing or servicing this boiler, care
should be taken when handling the edges of sheet metal parts to avoid the possibility of personal injury.
9.2 Installing the boiler
IMPORTANT NOTE: The system must be thoroughly flushed
using a propriety cleanser from Fernox or Sentinel to eliminate any foreign matter and contamination e.g. metal filings, solder particles, oil, grease etc.
Solvent products could cause damage to the system.
• Remove front panel, unscrew and remove the two retaining screws from the bottom of the front panel. Remove front panel by lifting up and forward.
• Remove the self adhesive wiring diagram label from the document envelope. Fit the self adhesive wiring diagram label to the inside of the front panel, put front panel in a safe place to avoid damaging it.
• Ensure the plastic plugs are removed from water and gas pipes. NOTE: There will be some spillage of water.
(24ci Only) Fit the cold water inlet restrictor (supplied in the document envelope) into cold water inlet isolating valve, see
diagram 7.1. Important Note. With regards to the manual handling
operations, 1992 regulations, the following operation exceeds the recommended weight for one man lift.
• Lift the boiler up and engage boiler onto the hanging bracket, refer to diagram 7.1.
• Fit the boiler jig connection pipes and washers between the boiler and isolating valves, see diagram 7.1.
9.3 Discharge safety valve (diagram 9.1)
The discharge safety valve pipe and sealing washer supplied in the connections pack, when fitted to the safety valve, will extend the valve below the boiler. The discharge pipe must be extended using pipe not less than 15 mm o.d. to discharge in a visible position outside the building, facing downward preferably over a drain.
IMPORTANT NOTE: To facilitate servicing of the appliance, the discharge pipe MUST ONLY be extended using a compression fitting supplied.
The pipe must have a continuous fall and be routed to a position so that any discharge of water, possibly boiling or steam, cannot create any danger to persons, damage to property or external electrical components and wiring. Tighten all pipe connection joints.
KNURLED UNION NUT finger tighten only
DISCHARGE SAFETY VALVE PIPE
9.4 Filling loop extension 24ci Only
The filling loop extension knob is supplied in the discharge
11581
safety valve pipe connection pack. Fit to the filling device on/ off knob, this is a push fit, see diagram 9.2.
9.5 Filling loop extension knob 18si
The filling loop extension is not required for this boiler, it can be discarded.
FILLING DEVICE
10088
4000123942-2
Diagram 9.1
20
24ci Only
FILLING LOOP EXTENSION
Diagram 9.2
10 Horizontal Telescopic Top Flue Installation
The Horizontal Telescopic Top Flue, Kit No. A2004500
Suitable for installations that require a flue length "L" from 430 minimum to 660 maximum. If longer flueing is required extensions and bends are available, see note below.
If the flue length, see diagram 10.2. is less than 430 'L' Do Not cut this flue but use the horizontal top flue 86285H.
Note: Additional 1 metre extensions, 90° and 45° bends are available. The maximum extended flue is 3.5m. The use of flue bends requires the max extended flue lengths to be reduced by 1m. for 90° and 0.5m. for 45°.
10.1 Horizontal Telescopic Top Flue
Kit of parts, refer to diagram 10.1.
10.2 Horizontal telescopic flue system
Rear and side flue lengths and dimensions, see diagram 10.2.
Max. Flue length 660mm
Min. Flue length 425mm
L
70mm
205mm
410 mm
11886
65mm
Note : Top of boiler casing not front panel
Drill, Screw and Tape (not supplied)
A
*
J
D
E
*
H
C
B
The flue kit A2004500 is 660 mm long and comprises:
- Telescopic flue assembly ..................................... A
- Fixing collar seal .....................................................B
- Fixing collar.............................................................C
- Elbow....................................................................... D
- External rubber sealing collar ...............................E
- *Gasket .................................................................... F
- *Screws 6 off...........................................................G
- *'O' rings .................................................................. H
- *Screws 4 off............................................................ J
* supplied in plastic bag
Diagram 10.1Telescopic Top flue kit
H
20mm Min. Clearance
75mm
* refer to diagram 6.1
Min. Wall Thickness
SIDE FLUE
10322
*
G
*
F
*
Max. Flue length 660mm
Min. Flue length 425mm
L
70mm
184mm
65mm
Note : Top of boiler casing not front panel
75mm Min. Wall Thickness
REAR FLUE
Diagram 10.2
21
4000123942-2
10 Horizontal Telescopic Top Flue Installation
10.3 Installation of telescopic flue assembly
• For flue lengths up to 0.5m fit the restrictor (supplied in the document envelope) inside the fan outlet, see diagram 10.3.
• Remove the elbow (D) and the telescopic flue assembly (A) from the flue kit.
Refer to Step 1. diagram 10.4. Fit the telescopic flue assembly (A) into the prepared hole in the wall. Position the elbow (D) on the boiler, do not secure. Position the telescopic flue assembly (A) as it would be fitted.
Refer to Step 2. diagram 10.4. Remove the telescopic flue assembly (A) from the prepared hole in the wall, make sure the air duct is extended to its required length. The flue duct at the elbow end must protrude 25mm. Drill ,secure with two screws and tape to secure the air duct, take care not to drill the inner flue pipe. Fit the fixing collar seal (B) to the telescopic flue assembly (A).
Refer to Step 3. diagram 10.4. Fit the telescopic flue assembly (A) with the fitted fixing collar seal into the prepared hole in the wall. Remove the backing from the self adhesive gasket (F) and carefully fit gasket to base of flue elbow. Fit the ‘O’ rings (H) into the grooves in the flue ducts within the elbow (D). Lubricate the ‘O’ rings with silicone. Fit flue elbow (D) onto boiler and secure with the four screws (G).
Refer to Step 4. diagram 10.4. Fit rubber sealing collar (E), into groove at the outer end of the air duct pipe (A). Carefully pull flue duct pipe into the elbow (D). (If the telescopic flue has been pulled apart care must be taken not to damage the ‘O’ ring on the flue duct when re-assembling). Secure with two screws (G). Pull telescopic flue assembly (A) inwards to bring rubber sealing collar hard up against external wall.
Refer to Step 5. diagram 10.4. Fit the fixing collar (C) using the two screws (G).
STEP 1.
Outside
wall face
17mm
FLUE LENGTH
IMPORTANT
"BUTT FIT"
STEP 2.
Drill, screw 2 off
and tape the Air Duct
2 off
(G)
STEP 3.
(A)
(A)
(D)
90mm
centre line
BOILER
(B)
25mm
ELBOW
C
L
Flue
FIXING
COLLAR
SEAL
4 off
11879
(D)
(G)
11874
The restrictor must be fitted to the inside of the fan outlet.
RESTRICTOR fitted for flue lengths less than 0.5m
Diagram 10.3
(A)
(E)
EXTERNAL RUBBER
SEALING COLLAR
STEP 4.
(A)
(E)
STEP 5.
(E)
'O' RING
(G)
(A)
FIXING
COLLAR
(H)
BOILER
(D)
2 off
(G)
(C)
Diagram 10.4
Diagram 10.4
GASKET
(F)
2 off
(D)
4000123942-2
22
10a Horizontal Top Flue Installation
10a.1 The Horizontal Top flue - kit 86285H
Is suitable for installations that require a max. flue length "L" of 740mm.
If a shorter flue length is required, the flue can be cut to a min. length"L" of 260mm rear or 300mm side. See diagram 10a.2 for min. flue lengths.
Note: Additional 1 metre extensions, 90° and 45° bends are available. The maximum extended flue is 3.5m. The use of flue bends requires the maximum extended flue lengths to be reduced by 1m. for 90° and 0.5m. for 45°.
Max. Flue length 660mm
Min. Flue length 425mm
L
70mm
11886
65mm
10a.2 Flue systems rear and side, refer to diagram 10a.1.
10a.3 Flue cutting, refer to diagram 10a.2.
Important: Do not leave any burrs or sharp edges on the cut
ends of the pipes.
G
F
B
E
D
A
C
J
H
I
11646
205mm
410 mm
20mm Min. Clearance
75mm
* refer to diagram 6.1
Min. Wall Thickness
SIDE FLUE
Max. Flue length 660mm
Min. Flue length 425mm
L
70mm
Note : Top of boiler casing not front panel
The flue kit 86285H comprises:
- Air duct pipe .......................................................... A
- Flue duct pipe ........................................................B
- Elbow....................................................................... C
- Fixing collar seal .................................................... D
- Fixing collar..............................................................E
- External rubber sealing collar ...............................F
- Internal flange .......................................................G
- Gasket..................................................................... H
- Screws .......................................................................I
- 'O' rings..................................................................... J
Horizontal Top flue kit
Diagram 10a.1
184mm
65mm
Note : Top of boiler casing not front panel
75mm Min. Wall Thickness
REAR FLUE
Diagram 10a.2
23
4000123942-2
10a Horizontal Top Flue Installation
17mm
90mm
X
cutting length
C
Air duct cutting length
X minus 90mm
plus 17mm =
Air duct
cutting length
25mm
check
dimension
(cut end)
Flue duct cutting length = air duct cutting length + 95mm
L
Air duct
Flue duct
Outside
wall face
Flue
centre line
10a.4 Installation of horizontal top flue assembly
Important: If the flue has been cut, ensure that there are no
burrs that could damage the ‘O’ ring.
• For flue systems less than 0,5 m long, fit the flue restrictor (a) into the fan outlet, see diagram 10a.4.
• Remove the backing from the self adhesive gasket (H) and carefully fit gasket to base of elbow (C).
• Fit both ‘O’ rings (J) into the flue elbow (C), one at the inlet, one at the outlet. By necessity, they are a loose fit, apply a small amount of suitable lubricant to each ‘O’ ring when fitting.
• Fit elbow onto boiler and secure with the four screws (I).
• Fit rubber sealing collar (F), into groove at the outer end of pipe (A).
• Insert flue duct pipe (B) into inner end of air duct pipe (A), rotate flue duct pipe to locate into groove inside air duct pipe.
• Fit air/flue duct pipe assembly through the wall with rubber sealing collar to the outside.
• Fit internal plastic flange (G) onto air duct pipe (A).
• Fit the fixing collar seal (D) onto the flue duct pipe (B) ensuring it is the correct way round (the larger diameter onto the pipe).
• Pull air/flue duct pipe assembly inwards to bring rubber sealing collar (F) hard up against external wall, while carefully pushing the fixing collar seal onto the elbow ensuring that the flue duct pipe locates into the flue elbow outlet while taking care not to tear the ‘O’ ring.
• Fit the fixing collar (E) around the fixing collar seal (D) and secure with 2 screws provided.
• Push the internal plastic flange (G) along the air duct pipe (A) until engaged against internal wall.
11643
Horizontal Top flue system
The maximum permissible length (L) is 3.5 m. For flue systems up to 0.5 m length, the flue restrictor must be fitted (a) inside the fan outlet. For longer flue systems, the restrictor must not be fitted.
For each 90° flue elbow used, (or two 45° elbows) the maximum permissible length (L) must be reduced by 1 metre.
FLUE RESTRICTOR
a
Gasket
L
184
65
Diagram 10a.3
10092
4000123942-2
Diagram 10a.4
24
11 Electrical Connection
WARNING: This appliance must be earthed. This appliance
must be wired in accordance with these instructions. Any fault arising from incorrect wiring cannot be put right under the terms of the Glow worm guarantee.
All system components must be of an approved type. Electrical components have been tested to meet the equivalent
requirements of the BEAB. Do not interrupt the mains supply with a time switch or
programmer. Connection of the whole electrical system and any heating
system controls to the electrical supply must be through a common isolator.
Isolation should preferably be by a double pole switched fused spur box having a minimum contact separation of 3mm on each pole. The fused spur box should be readily accessible and preferably adjacent to the boiler. It should be identified as to its use.
A fused three pin plug and shuttered socket outlet may be used instead of a fused spur box provided that:
a) They are not used in a room containing a fixed bath or shower.
b) Both the plug and socket comply with the current issue of BS1363.
11.1 Mains Cable
Important: If a replacement supply cable is required it must be
purchased. Part No. S1008600.
11.2 Voltage Free External Controls
WARNING: UNDER NO CIRCUMSTANCES MUST ANY MAINS VOLTAGE BE APPLIED TO ANY OF THE TERMINALS ON THE VOLTAGE FREE HEATING CONTROLS CONNECTION TERMINAL.
This boiler will operate continuously on heating, as supplied, if the wire link (E), fitted between the two terminals of the heating controls connection, is left in place, see diagram 11.1.
External heating controls e.g. Room thermostat, should be fitted in accordance with the rules in force and as shown in the example, diagram 11.2.
RETAINING SLOTS
VOLTAGE FREE HEATING CONTROLS CONNECTION TERMINAL
CONTROLS PANEL REAR COVER
SECURING SCREW (3)
WIRE LINK(E)
11911
11994
Diagram 11.1
25
Diagram 11.2
4000123942-2
11 Electrical Connection
11.3 Mains Voltage External Controls
WARNING: UNDER NO CIRCUMSTANCES MUST ANY MAINS VOLTAGE BE APPLIED TO ANY OF THE TERMINALS ON THE VOLTAGE FREE HEATING CONTROLS CONNECTION TERMINAL.
When mains voltage external controls are used, remove the MAINS VOLTAGE HEATING CONTROLS CONNECTION PLUG from the fittings pack and install on the control interface PCB as follows.
Gain access to the control interface by unclipping the fascia panel and hinging forward, see diagram 11.3.
Route the external heating controls cable (not supplied) and connect to the plug
Insert plug onto controls interface PCB, see diagram 11.3. Close the fascia panel and remove the screws to open the rear
cover of control panel, see diagram 11.1. Secure the external heating control cable in the strain relief, and
thread the cable through rear of the control panel and out of the cables exit, see diagram 11.4.
Close and secure rear cover of control panel. IMPORTANT: Remove the wire link from the voltage free
heating controls connector terminal, see diagram 11.1. Connect external heating controls as diagram 11.5. External controls should be fitted in accordance with the rules
in force.
11.4 Electrical Connections - Testing
Carry out preliminary electrical system checks as below:
1. Test insulation resistance to earth of mains cables.
2. Test the earth continuity and short circuit of cables.
3. Test the polarity of the mains.
CONTROL PANEL USER INTERFACE
, see diagram 11.3.
RETAINING LATCHES
11659
OILER
CONTROLS
INTERFACE PCB
3 2 
EXTERNAL
FROST
THERMOSTAT
EXTERNAL
THERMOSTAT
INTERNAL PROGRAMMER
EXTERNAL 230V AC ROOM THERMOSTAT
EXTERNAL 230V AC FROST THERMOSTAT
DO NOT
CONNECT
MAINS VOL TAE
HEATIN CONTROLS
CONNECTION PLU
ROOM
X
PRORAMMER
TO MAIN PCB
CONNECTOR J5
HEATIN CONTROLS
REMOVE LIN
HEN EXTERNAL
CONTROLS ARE SE
EXTERNAL
JUNCTION BOX
3 AMP FUSE
DOUBLE POLE
ISOLATOR
STRAIN RELIEF
MAINS CABLE
EXTERNAL CONTROLS CABLE
Diagram 11.4
VOLTAE FREE
CONNECTION
ON CONTROLS
BOX COVER
ONOFF
SITCH
LNE
230V~ 50Hz
PERMANENT
MAINS
SUPPLY
11992
The type of plug and orientation may be different to that illustrated but the wiring should always be as wiring diagrams
PLUG
4000123942-2
EXTERNAL CONTROLS CABLE(MAINS VOLTAGE)
CONTROLS INTERFACE PCB
Diagram 11.3
11974
26
OLER
INTERFACE PCB
EXTERNAL
FROST
THERMOSTAT
EXTERNAL
ROOM
THERMOSTAT
EXTERNAL
PRORAMMER
EXTERNAL PROGRAMMER/CLOCK
EXTERNAL 230V AC ROOM THERMOSTAT
EXTERNAL 230V AC FROST THERMOSTAT
X
DO NOT
CONNECT
MAINS VOL TAE HEATIN CONTROLS CONNECTION PLU
CONTROLS
3 2 
TO MAIN PCB
CONNECTOR J5
HEATIN CONTROLS
REMOVE LNK
HEN EXTERNAL
CONTROLS ARE SE
EXTERNAL
JUNCTION BOX
DOUBLE POLE
ISOLATOR
VOLTAE FREE
CONNECTION
ON CONTROLS
BOX COVER
ONOFF
SITCH
3 AMP FUSE
LNE
230V~ 50Hz
PERMANENT
MAINS
SUPPLY
Diagram 11.5
11993
12 Commissioning
Important: The commissioning and first firing of the boiler must only be done by a competant person.
Gas installation
If conversion from G20 to 30 or 31 is required, refer to section
13. It is recommended that any air is purged from the supply at the
gas purge point on the gas valve, see diagram 12.1.
Filling the system
The following steps 1 - 8, show how to fill the system.
1.
Make sure that:
• The boiler is connected to the electrical supply.
• The gas service cock is open. Turn the switch OFF ( 0 )
Air in pipes
Important: A central heating system can not operate correctly
unless it is filled with water and air bled from the system. If these conditions are not met the system may be noisy.
Bleed the air in the radiators and adjust the pressure if system requires. If the system requires filling to often this may be due to minor leaks or corrosion in the system.
BURNER PRESSURE POINT
GAS PURGE POINT
11898
24ci shown
Diagram 12.1
9796
2.
• Open the three water isolating valves.
HEATING FLOW
24ci shown
3.
• Undo cap on automatic air vent on top of pump and leave undone.
DOMESTIC HOT WATER OUT
(24ci Only)
Note: Isolating valves are shown in the: OFF position
COLD GAS SERVICE COCK
4.
• Turn the switch ON ( I )
24ci Only Open the tap on the filling device
• Fill the system until the pressure indicated on the display is 1 bar. Close filling device.
9810
WATER IN
(24ci Only)
HEATING RETURN
11933
9792
NOTE: On initial fill there may be a small discharge of water from the Reduced Pressure Zone valve
27
4000123942-2
12 Commissioning
5.
• Bleed each radiator to remove air, ensure all bleed screws are re-tightened.
• If necessary repressurise the system, refer to procedure 4
7.
• Ensure the display indicates a system pressure of 1.0 bar adjust if necessary.
Adjusting the Central heating output.
The central heating output is factory preset to approx. 15kW. If a different central heating output is required, proceed as
follows: To gain access to potentiometer P3, unclip the control box,
see diagram 11.1.
Ins 061a
10217
• Leave cap open on automatic air vent.
6.
8.
• Open various hot water taps to bleed system
The potentiometer P3, is shown in diagram 12.2,to adjust to the required heating output, insert a small flat edge screw driver into the arrowed slot in potentiometer P3, turn clockwise to adjust to the desired setting. Use a manometer to monitor the burner pressure.
9810
Ins 062a
maxi
15 kW
P.
P3
max.
mini
P3
POTENTIOMETER P3
234 1
ON DIP
POTENTIOMETER P6
P6
P7
11890
USER INTERFACE BOARD
Diagram 12.2
MANOMETER
SW1 DIP SWITCH
15 kW
P. max.
mini
ON DIP
Factory set in "OFF" position
234 1
maxi
0
P6
+
Dip Switches
The position of the SW1Dip Switch(s), see diagram 12.2, and the table below can be used to change the operation of the
PUMP OPERATION DIP SWITCH 1 DIP SWITCH 2 HEATING TEMP DIP SWITCH 3 DIP SWITCH 4 CONTINUOUS ON ON 53OCON ON WITH BURNER ON OFF 87OC ON* OFF* CONTINUOUS OFF ON 53OC OFF ON WITH HEATING OFF* OFF* 73 DEMAND
pump and maximum heating temperature of your boiler.
O
C OFF OFF
FACTORY SETTING * GB/IE PREFFERED SETTING
4000123942-2
28
12 Commissioning
When all adjustments are completed.
• Adjust heating temperature to maximum.
• Check that any external controls, if fitted, are calling for heat (set room thermostat to maximum).
• Allow the temperature to rise to the maximum value, with all radiator valves open. The temperature rise will cause release of the air contained in the water of the central heating system.
• Air driven towards the boiler will be automatically released through the automatic air vent.
• The air trapped at the highest point of the system must be released by bleeding the radiators. Check the burner gas rate required, ten minutes after lighting. Refer to Data Label on electrical controls box. Should there be any doubt about the gas rate it should be checked at the meter, refer to technical data.
On reaching maximum temperature, the boiler should be turned off and the system drained as rapidly as possible whilst still hot.
• Refill system to a pressure of between 1 and 2 bar and vent as before.
• Restart boiler and operate until a maximum temperature is reached. If necessary, refer to section 14 to adjust the bypass. Shut down boiler and vent heating system. If necessary, top up heating system and make sure that a pressure of at least 1 bar is indicated when system is COLD.
24ci Only Flush the domestic hot water system by opening the hot water taps for several minutes.
Completion
Adjust the boiler temperature control and any system controls to their required settings.
For IE, it is necessary to complete a "Declaration of Conformity" to indicate compliance to I.S.813. An example of this is given in the current edition of I.S.813.
Please ensure the “Benchmark” logbook is completed and left with the user and the magnetic lighting instruction label is placed on the surface of the boiler casing.
Instruct the User
Instruct and demonstrate the lighting procedure and advise the user on the safe and efficient operation of the boiler.
Instruct on and demonstrate the operation of any heating system controls.
Advise the user on the use and maintenance of any scale reducer and pass on any relevant instructional documents.
Advise that to ensure the continued efficient and safe operation of the boiler it is recommended that it is checked and serviced at regular intervals. The frequency of servicing will depend upon the installation conditions and usage, but in general, once a year should be enough.
Draw attention, if applicable, to the current issue of the Gas Safety (Installation and Use) Regulations, Section 35, which imposes a duty of care on all persons who let out any property containing a gas appliance in the UK.
It is the Law that any servicing is carried out by a competent person.
Advise the user of the precautions necessary to prevent damage to the system, boiler and the building, in the event of the heating system being out of use during frost or freezing conditions.
Advise the user that the permanent mains electrical supply SHOULD NOT be switched off, as the built in frost protection and pump saver program would not be operable.
Reminder, leave these instructions and the ‘Benchmark’ logbook with the user.
13 Changing Gas Type
Should it be necessary to change the gas type, a conversion kit with instructions will be required.
This modification must only be carried out by a competent person.
Conversion natural gas (G20) to G30/G31 Part No. A2011900.
Setting the step pressure.
Adjusting the step pressure may be a necessary operation after gas conversion or after changing the gas control valve when a new replacement part is required.
Proceed as follows:
• Gain access to the gas control valve, connect a pressure gauge.
14 Bypass Setting
Bypass
The boiler has a built-in bypass, refer to diagram 14.1. The boiler is supplied with the bypass open half a turn. It should
not be necessary to adjust the bypass, but if required ensure that under no circumstances does the flow rate fall below the figures specified, refer to table 1. in section 3 (turn clockwise 'A' to close the valve ).
• Unclip the control box, see diagram 11.1.
• Run the appliance in heating mode.
• Read the burner pressure setting in heating mode, before the boiler modulates.
• Adjust the central heating output to the minimum setting by adjusting potentiometer P3, refer to commissioning section.
• Adjust the potentiometer P6 burner pressure to the desired value, by inserting a small flat edge screw driver into the arrowed slot, turn to adjust to the desired setting, see diagram
12.2.
• Return the potentiometer P3 to its initial value.
A
24ci shown
9718
29
Diagram 14.1
4000123942-2
15 Routine Cleaning and Inspection
REMEMBER, when replacing a part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not use reconditioned or copy parts that have not been clearly authorised by Hepworth Heating.
To ensure the continued efficient and safe operation of the boiler it is recommended that it is checked and serviced at regular intervals. The frequency of servicing will depend upon the particular installation conditions and usage, but in general once a year should be enough.
It is the law that any servicing is carried out by a competant person.
15.1 Products of combustion check
Note: To obtain a products of combustion reading, unscrew the left hand sampling point cap on the flue elbow, located on top of boiler, see diagram 15.1.
Connect the analyser tube onto sampling point. Refer to the combustion product values in Section 1 Technical
Data.
Switch on the electrical supply and gas supply, then operate the boiler.
On completion of the test switch off the electrical supply and the gas supply, remove analyser tube and replace sampling point cap.
9532
PRODUCTS SAMPLING POINT
Diagram 15.1
15.2 Service Check and Preparation.
• Isolate boiler from the gas and electrical supplies.
(24ci Only) Drain the Domestic hot water circuit, refer to
diagram 15.2.
• Drain the boiler, refer to diagram 15.2.
• On completion check all gas-carrying parts for soundness with leak detection fluid.
To Drain the Domestic hot water circuit (24ci Only)
• Close boiler isolating valve (d).
• Turn on one or more hot water taps.
To Drain the boiler
• Close isolating valves (e) and (a).
• Open the boiler drain valve (f).
(b)
(a)
HEATING FLOW
24ci shown
DOMESTIC HOT WATER OUTLET
(24ci Only)
Note: Isolating cocks water and gas are shown in the: OFF position
GAS SERVICE COCK
(c)
BOILER DRAIN VALVE
(d)
COLD WATER INLET (24ci Only)
9839
(f)
11933
(e)
HEATING RETURN
Diagram 15.2
4000123942-2
30
15 Routine Cleaning and Inspection
15.3 Front panel
• Unscrew and remove the two retaining screws from the bottom of the front panel.
• Remove front panel by lifting up and forward.
15.4 Control panel
• Lower forwards to gain access to lower part of boiler.
15.5 Sealed chamber cover
• Unscrew and remove the two retaining screws from the sealed chamber cover, see diagram. 15.3.
• Lift cover up and off pins on top of boiler.
15.6 Side panels (for ease of access if available), refer to diagram 15.4
• Unscrew and remove the two retaining screws from front of each side panel.
• Left hand side panel only disconnect the control panel retaining strap at the control panel.
• Unhook each panel from the front retaining tabs.
• Pull each panel forward from the rear retaining tabs to remove.
9533
15.7 Combustion chamber cover
• Unscrew and remove the two screws securing combustion chamber cover to combustion chamber, see diagram 15.5.
• Remove combustion chamber cover from boiler.
15.8 Ignition and Flame Sensing Gaps
• Check that the ignition and flame sensing gaps as shown in diagram 15.6. Note: To gain access to ignition and sense electrodes for removal, refer to Section, 18.11 and 18.12 in
Replacement of Parts.
15.9 Burner, refer to diagram 15.7
• Unscrew and remove the two burner retaining screws.
• Remove burner from boiler by easing it forward off the two burner guides, taking care not to damage the insulation.
• Clean burner by washing in soapy water. Dry thoroughly before refitting.
Note: To gain access to injectors for removal and cleaning, refer to Section, 18.8.
15.10 Fan, refer to diagram 15.8
• Disconnect power supply leads and earth lead from fan.
• Unscrew and remove the two fan retaining bolts.
• Ease the fan down and forwards to remove.
Diagram 15.3
9797
97999800
31
24ci shown
Diagram 15.4
4000123942-2
15 Routine Cleaning and Inspection
15.11 Heat exchanger, refer to diagram 15.9
• Remove air pressure switch sensing tube from the side of
9811
the flue hood.
• Unscrew and remove the two retaining screws from front of each side panel.
• Unhook each panel from the front retaining tabs and ease outwards.
• Remove the flue hood. When refitting ensure the rear of the flue hood locates in the tabs.
• Use a soft brush or vacuum clean the heat exchanger.
DO NOT USE ANY TOOL LIKELY TO DAMAGE PAINTED
Diagram 15.5
FINISH OF HEAT EXCHANGER.
3.5mm
IGNITION GAP
3.5 mm
FLAME SENSING GAP
9812
BURNER RETAINING SCREWS
BURNER GUIDE
3.5mm
Diagram 15.6
9752
9816
9818
EARTH
9741
LEAD
FAN RETAINING SCREWS
POWER SUPPLY LEADS
Diagram 15.8
9742
AIR PRESSURE SWITCH SENSING TUBE
4000123942-2
9818
Diagram 15.7
9817
32
HEAT EXCHANGER
FLUE HOOD
9825
Diagram 15.9
15 Routine Cleaning and Inspection
15.12 (24ci Only) Domestic water inlet filter, refer to diagram 15.10
If the water flow rate through the appliance has reduced it may be necessary to clean or replace the domestic water inlet filter.
• Pull out slotted clip securing the filter in its housing, remove the filter to clean or renew if necessary.
Push the filter fully into its housing and replace the securing clip.
• Open isolating valve, (d) diagram 15.2, on cold water inlet and test the Domestic Hot Water circuit for soundness.
15.13 Central Heating Filter, refer to diagram
15.11
Remove the filter retaining clip and filter clean or renew if necessary.
Push the filter fully into its housing, ensuring the correct orientation. The flat and hole in the filter as shown. Secure with retaining clip.
15.14 Sealed chamber cover seal check
• Check the condition of the seal, replace as required.
• To replace remove the old seal, thoroughly clean the casing surfaces. Fit new seal, it is supplied to the correct length, see
diagram 18.25.
DOMESTIC WATER INLET FILTER HOUSING
24ci only
FILTER
CLIP
9822
Diagram 15.10
11934
15.15 Combustion chamber insulation
• Check the condition of the combustion chamber insulation. If renewing, refer to Section 18.14.
15.16 Flue system
• Check externally to make sure that flue is not blocked
• Inspect flue system to make sure that all fittings are secure.
15.17 Reassembly of parts removed for servicing
All parts are replaced in reverse order to removal.
RETAINING CLIP
FILTER
FLAT
11935
33
Diagram 15.1124ci shown
4000123942-2
16 Fault Finding
Before trying to operate the boiler make sure that :
• All gas supply cocks are open and that the gas supply has been purged of air.
• The heating system pressure is at least 1 bar.
• There is a permanent mains supply to the boiler and that the polarity is correct.
WARNING. Always isolate the boiler from the electrical supply before carrying out any electrical replacement work.
Always check for gas soundness after any service work. Should there be any doubt about the voltage supply to any of
the components, it is possible to carry out a simple electrical test to ensure all is operational in that area.
IMPORTANT: On completion of the fault finding task which has required the breaking or remaking of the electrical connections, the continuity, polarity, short circuit and resistance to earth checks must be repeated using a suitable multimeter.
Overheat thermostat reset button
Refer to Section 18.10 to locate the overheat thermostat reset button.
Depress the button to reset.
9826
OVERHEAT THERMOSTAT
RESET BUTTON
Diagram 16.1
DISPLAY FAULT
'01' and 'F' and 'flashing red LED' Ignition fault (lockout) caused by no gas, no detection '02' and 'F' and 'flashing red led' Air fault, pressure switch, no power to fan
'05' and 'F' and 'flashing red LED' Overheat fault '06' and 'F' and 'flashing red LED' Central heating flow NTC fault '09' and 'F' and 'flashing red LED' Water pressure sensor fault '11' and 'F' and 'flashing red LED' No reception by the main board (MMI Lead) '12' and 'F' and 'flashing red LED' User interface or distant control panel fault '13' and 'F' and 'flashing red LED' Main board fault '14' and 'flashing red LED' Over temperature on primary water circuit
'15' and 'F' and 'flashing red LED' Stepper motor fault (gas valve) '16' and 'F' and 'flashing red LED' Gas safety value failure '17' and 'F' and 'flashing red LED' Power supply <170V '18' and 'F' and 'flashing red LED' Local user interface fault
'19' and 'F' and 'flashing red LED' Central heating NTC not connected to pipe '20' and 'F' and 'flashing red LED' User interface not compatible with boiler
'0.5bar' flashing and 'F' and 'flashing red LED' Lack of water fault (<0.5b) '2.7bar' flashing and 'F' and 'flashing red LED' Upper water pressure (>2.7b)
4000123942-2
34
16 Fault Finding
TYPE OF FAULT CHECK
No display on control panel • 230V supply
• PCB fuse
• Connection between PCBs
No domestic hot water 24ci Only) • Loose connections on control board (PCB), No central heating • Connections on air pressure switch (electrical or tubes) (Red flashing warning light and flashing disconnected, fault code in display) • Faulty control or interface board (PCB's),
• Water pressure, flashing pressure
• Shortage of air or gas,
• Faulty temperature sensor,
• Overheating,
COMPONENT TESTING DATA
COMPONENT NORMAL MEASURE CHECK
Gas control valve Under demand during ignition sparks: If 0 Volt: the gas control valve Resistance of coil 116 24V dc for 1 to 2 seconds, then is not faulty.
12Vdc (constant) at the gas control If 24 Volts and then 12 Volts valve electrical connection. but no gas at the burner:
Check if the gas control valve is
stuck. If not, check the adjustment valve.
Adjustment valve Close the gas inlet: If the valve does not move: (step motor) Dismantle the step motor (screw not Check the connections at both
sealed in). Trigger a demand and check motor and control board (PCB). that the valve opens during the ignition. Change the motor. Replace the
control board (PCB).
(24ci Only)
Three way valve. When heating is on: If voltages are different: Electrical supply to motor 230V ac between 1 and 2 of the motor. Connections. 0 between 1 and 3. About 25V ac to 35V ac between 2 and 3. Control board (PCB).
9.6k between 1 and 2. When hot water is on: Three way valve lead.
9.6k between 1 and 3. 230V ac between 2 and 3 of the motor. 3 2 1 (1, 2 and 3 marked on About 25V ac to 35V ac between 1 and 2. the motor).
Thrust action of the motor. Unfasten the clip (YES, no risk of water If electrical supply is OK. (remove gas control valve leak), pull out the motor and leave it but the motor axle does not move before testing) plugged in. Replace the motor, or replace
When hot water is on: the spindle should the control board (PCB). pull in. When heating is on : the spindle should push out.
(24ci Only)
Domestic water flow To test: Use a new detector and
connect it electrically in place of the faulty one . Blow through to simulate a demand for water.
35
4000123942-2
16 Fault Finding
FAULT: NO HEATING
Are the external heating
controls calling for heat?
YES
Is the polarity correct?
YES
Connect 1 and 2 on J10,
does boiler fire in central heating?
YES
Faulty 230V controls board.
NO
NO
NO
Rectify fault on external controls.
Rectify, check the 230V
controls board.
Faulty main PCB.
24ci ONLY
FAULT: NO HOT WATER, BUT THE HEATING IS WORKING
Is the water flow rate greater
than 1.7l/min. (threshold figure).
YES
Is flow detector operating ?
YES
Check the connectors on the
flow sensor and the control board (PCB).
If the fault persists, fit a relplacement
control board (PCB).
NO
NO
Check the cold water inlet filter
for dirt. Is the cold water tap fully open ?
Check the heat exchanger for scaling.
Change or clean it.
11800
4000123942-2
36
16 Fault Finding
F1 FAULT DISPLAYED
FAULT: THE BURNER LIGHTS BUT THEN GOES OUT. THERE IS NO FLAME DETECTED.
The flame is not spreading across
the whole burner and is not reaching
the sensing electrode. Is the gas
pressure correct?
YES
NO
Check that the gas taps are fully open Check the gas pressure.
Is the boiler actually designed for the gas being used.
YES
Clean the gas filter. Clean the burner.
F1 or F4 FAULT DISPLAYED
FAULT: THE BURNER LIGHTS, THEN GOES OUT.
The flame is spreading across the
whole burner, but not being detected.
CHECK THE MAINS
FAULT NOT FOUND
NO
CHECK
THE
PROBE
Change the gas type for the boiler (gas conversion kit).
With the power turned off, check the continuity between the flame sense electrode and terminal H2 . 4 on the control board (PCB). Check the connector on the end of the wire. Check that the spark electrode is pointing towards the flame.
Check the spark electrode. Change it.
If the problem persists, change the
control board (PCB). (flame detection module faulty).
37
11873
4000123942-2
16 Fault Finding
F1 FAULT DISPLAYED
FAULT: THE BURNER DOES NOT LIGHT AT ALL, BUT THERE IS AN IGNITION SPARK.
Are the gas taps on?
YES
Is there 24Vdc at the gas control valve? for testing see component testing data.
YES
Test the gas control valve. Check resistance of safety valve coil.
NO
NO
Turn on the gas taps.
Check the wiring. If the problem persists, change the control board (PCB).
FAULT: THE ROOM TEMPERATURE IS INADEQUATE AND RADIATORS ARE LUKE-WARM.
Is the room thermostat and or radiator
set high enough and calling for duty?
NO
Turn up settings
Is the heating power adequate?
YES
Is the heating temperature on the boiler set high enough?
YES
- Check set point P3. (Refer to Commissioning)
- Check the adjustment of the by-pass internal and
external (If fitted). - 24ci Only Check the 3-way valve is not passing into the domestic hot water heat exchanger.
4000123942-2
38
16 Fault Finding
24ci ONLY
F AUL T : THE WA TER A T THE T APS IS LUKE-W ARM.
Is the temperature higher if you reduce
the flow through the taps?
YES
Check that the flow restrictor on the cold water inlet is fitted. Check the rate of flow. Check burner pressure is correct.
FAULT: THE FAN DOES NOT START.
Is there 230V ac
at fan during demand?
NO
NO
Check the 3-way valve is not passing into the radiators. (The radiators should stay cold in Summer setting)
11875
Check continuity of fan harness.
YES
Faulty fan, replace.
Faulty PCB, replace.
YES
FAULT: THE FAN RUNS BUT THERE ARE NO SPARKS.
• CHECK CONTIUITY OF SPARK (ELECTRODES AND LEADS)
• CHECK POWER SUPPLY FROM PCB TO IGNITION UNIT
CONNECTIONS TO THE AIR PRESSURE SWITCH
Pr
P2
P1
3
2 1
LH
11876
11877
Air flow switch take-off.
Electrical contacts.
39
4000123942-2
17 Wiring Diagram 24ci
10224
4000123942-2
40
17a Wiring Diagram 18si
10298
41
4000123942-2
18 Replacement of Parts
To Drain the central heating circuit
• Open drain valve fitted at the lowest point in the system.
• Allow air into the system by opening a radiator bleed screw or the boilers drain valve (f).
To Drain the Domestic hot water circuit (24ci Only)
• Close boiler isolating valve (d).
• Turn on one or more hot water taps.
To Drain the boiler
• Close the isolating valves (a), (d) and (e) .
• Open the boiler drain valve (f).
BOILER DRAIN VALVE
9839
(f)
11933
(b)
(a)
HEATING FLOW
24ci shown
IMPORTANT INFORMATION
WARNING: Before commencing the replacement of any
component, isolate appliance from electrical supply and turn off gas at service cock.
Replacement of parts must be carried out by a competent person.
When replacing components it may be necessary to renew sealing washers, gaskets and 'O' rings. If new ones are supplied with replacement components they must be used.
All parts are replaced in reverse order to removal. If any gas-carrying components are disturbed, removed or
replaced it will be necessary on completion of assembly to test for gas soundness and purge in accordance with the current issue of BS6891 or in IE, the current edition of I.S.813 "Domestic Gas Installations".
18.1 Central heating thermistor
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4.
DOMESTIC HOT WATER OUTLET
(24ci Only)
Note: Isolating cocks water and gas are shown in the: OFF position
GAS SERVICE COCK
(c)
CENTRAL HEATING THERMISTOR
• Locate central heating thermistor on heating flow pipe on centre of boiler, see diagram 18.2.
• Unclip thermistor from pipe.
• Disconnect electrical connections from thermistor.
• Fit electrical connections to replacement thermistor and fit thermistor to pipe. The polarity is not important.
(d)
COLD WATER INLET (24ci Only)
(e)
HEATING RETURN
Diagram 18.1
24ci shown
Diagram 18.2
9821
4000123942-2
42
18 Replacement of Parts
18.2 Fan.
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
Remove the sealed chamber cover, refer to Section 15.5.
• Remove the fan, refer to Section 15.10.
18.3 Air pressure switch
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
Remove the sealed chamber cover, refer to Section 15.5.
• Locate air pressure switch situated at the top right hand side, see diagram 18.3.
• Remove air pressure switch tube from sensing probe on flue hood.
Note: Do not fit tube until the air pressure switch is in position.
• Disconnect air pressure switch electrical connections.
• Unclip to remove air pressure switch.
RETAINING CLIPS
ELECTRICAL CONNECTORS
SENSING TUBE
UNION NUT
9646
AIR PRESSURE SWITCH
Diagram 18.3
COLD WATER INLET RESTRICTOR
18.4 (24ci Only) Domestic water inlet filter
If the water flow rate through the appliance has reduced it may be necessary to clean or replace the water inlet filter, refer to section 15.12.
Before starting refer to the front of Section 18 Important
information.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4.
• Clean or replace the water inlet filter, refer to Section 15.12.
18.5 Central Heating Filter
It may be necessary to clean or replace the central heating filter. Before starting refer to the front of Section 18 Important
information.
• Clean or replace the central heating filter, refer to Section
15.13.
18.6 ( 24ci Only) Cold water inlet restrictor
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4. Drain down domestic hot water circuit of boiler only, refer to
relevant part of diagram 18.1.
• Undo union nuts from boiler cold water in isolating valve.
• Clean and inspect restrictor, replace if necessary, see diagram
18.4.
18.7 Burner, refer to Section 15.9.
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4.
Remove the sealed chamber cover, refer to Section 15.5.
11939
11932
COLD WATER IN ISOLATING VALVE
24ci Only
Remove the combustion chamber cover, refer to Section
15.7.
• Remove burner from boiler, refer to Section 15.9.
Diagram 18.4
18.8 Burner injectors, refer to diagram 18.5.
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4.
Remove the sealed chamber cover, refer to Section 15.5.
Remove the combustion chamber cover, refer to Section
15.7.
• Remove burner from boiler, refer to Section 15.9.
• Remove and replace injectors as required. Note: The injectors may be cleaned, remove injectors inspect
and clean. Do not use a wire or sharp implement. Note: Make sure that injector size, marked on each injector, is
the same as that given in ‘Section 1 Technical Data’ for the type of gas being used.
43
4000123942-2
18 Replacement of Parts
18.9 Burner injector assembly, refer to diagram
18.6.
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4.
Remove the sealed chamber cover, refer to Section 15.5.
Remove the combustion chamber cover, refer to Section
15.7.
• Remove burner from boiler, refer to Section 15.9.
• Undo the gas supply union nut from under the sealed chamber. Note: The fibre washer between the burner injector assembly
and gas supply must be kept for use on reassembly.
• Undo and remove the sense and ignition electrode assemblies.
• Remove the burner injector assembly securing screws.
• Remove the burner injector assembly by lifting up, easing the gas connection through the grommet in the sealing chamber.
Note: Take care not to damage the insulation.
• When refitting burner injector assembly ensure the gas connection locates correctly through the grommet.
Note: Make sure that injector size, marked on each injector, is the same as that given in ‘Section 1 Technical Data’ for the type of gas being used.
9819
9820
9814
BURNER INJECTOR BAR
SENSE ELECTRODE ASSEMBLY
Diagram 18.5
GROMMET GAS SUPPLY
PIPE
IGNITION ELECTRODE ASSEMBLY
9813
Diagram 18.6
18.10 Overheat thermostat
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
Remove the sealed chamber cover, refer to Section 15.5.
• Locate overheat thermostat on heating flow pipe on right hand side of boiler, see part of diagram 18.7.
• Disconnect electrical connections from thermostat
• Remove the thermostat and bracket assembly from heating flow pipe by unclipping at the side of the bracket. Remove the thermostat, fit new thermostat and replace assembly.
• When refitting electrical connections to replacement thermostat the polarity is not important.
18.11 Ignition electrode
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4.
Remove the sealed chamber cover, refer to Section 15.5.
Remove the combustion chamber cover, refer to Section
15.7.
• Remove burner from boiler, refer to Section 15.9.
• Remove the left hand side panel, refer to Section 15.6.
• Undo and remove screw securing electrode assembly to the burner injector assembly, see diagram 18.6.
• Disconnect the electrical connections at the ignition unit, see diagram 18.22. Note the routing of the cables.
OVERHEAT THERMOSTAT
9826
CLIP
ELECTRICAL LEADS
PIPE SECURING CLIP 2 OFF
9825
HEAT EXCHANGER
Diagram 18.7
18.12 Flame sense electrode
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4.
Remove the sealed chamber cover, refer to Section 15.5.
Remove the combustion chamber cover, refer to Section 15.7.
• Remove burner, refer to Section 15.9.
• Remove the right hand side panel, refer to Section 15.6.
• Undo and remove screw securing sense assembly to the burner injector assembly, see diagram 18.6.
• Disconnect the electrical connection from the inline connector, Note the routing of the cable.
4000123942-2
44
18 Replacement of Parts
18.13 Heat exchanger, refer to diagram 18.7.
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
Remove the sealed chamber cover, refer to Section 15.5.
Remove the combustion chamber cover, refer to Section
15.7.
• Drain down central heating water circuit of the boiler only,
refer to relevant part of diagram 18.1.
Remove the fan, refer to Section 15.10.
• Remove air pressure switch sensing tube from the side of the flue hood, see diagram 15.9.
• Release both side panels, refer to section 15.6.
• Remove the flue hood, lift up and off. When refitting ensure the rear of the flue hood locates in the tabs.
• Disconnect the electrical leads from the overheat thermostat.
• Remove the two pipe securing clips.
• Lift to remove the heat exchanger taking, care not to damage the insulation.
18.14 Combustion chamber insulation, refer to diagram 18.8.
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
Remove the sealed chamber cover, refer to Section 15.5.
Remove the combustion chamber cover, refer to Section
15.7.
• Remove the heat exchanger, refer to Section 18.13.
• Pull out side insulation panels from combustion chamber.
• Tilt rear insulation panel forwards and out.
• Fit replacement insulation.
18.15 Printed circuit board (PCB), refer to diagram 18.9.
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4.
• Undo and remove the two front retaining screws.
• Hinge up the control panel cover and ease forwards from the rear retaining lugs to gain access to PCB. Do not strain the cables attached to the PCB. Note the routing of the cables.
• Carefully pull off electrical connections to PCB.
• Unclip and lift out PCB.
• Fit replacement PCB. Be careful not trap any of the cables. Make sure that PCB connections are fully pushed onto
replacement PCB.
INSULATION
9824
CONTROL BOARD COVER
10021
24ci shown
45
PCB (CONTROL BOARD)
Diagram 18.8
10001
Diagram 18.9
4000123942-2
18 Replacement of Parts
MAINS SWITCH230V CONTROLS BOARD
24ci shown
CONTROL PANEL
USER INTERFACE BOARD
18.16 User interface board, refer to diagram
18.10.
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Unclip control panel user interface and hinge forward . Do not strain the cables.
• Disconnect the electrical connections from the user inter face board.
• Remove the two user inter face board retaining screws.
• Remove the user inter face board.
11659
11660
PROGRAMMER
Diagram 18.10
PUMP ELECTRICAL CONNECTION BOX
PUMP HEAD
9823
18.17 Mains switch, refer to diagram 18.10.
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Unclip control panel user interface and hinge forward . Do not strain the cables.
• Disconnect the electrical connections from mains switch.
• Remove the mains switch.
18.18 230V Controls board, refer to diagram
18.10.
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Unclip control panel user interface and hinge forward . Do not strain the cables.
• Disconnect the electrical connection from the 230V controls board and the electrical connection from printed circuit board (PCB).
• Remove the 230V controls board retaining screw.
• Remove the 230V controls board.
18.19 (24ci Only) Analogue programmer, refer to diagram 18.10
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
HEX HEAD SCREW (4 OFF)
24ci shown
• Unclip control panel user interface and hinge forward. Do not strain the cables.
• Disconnect the electrical connection from the programmer.
• Undo the two securing screws and remove the programmer.
Diagram 18.11
18.20 Central heating pump head, refer to diagram 18.11.
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4.
• Drain down central heating water circuit of the boiler only, refer to relevant part of diagram 18.1.
Note: it is not necessary to drain down the entire heating system to carry out this work.
• For ease of access if required remove the right hand side panel, refer to Section 15.6.
• Undo four head fixing screws and remove pump head.
• Gain access to the pump electrical connection box and remove cover.
• Disconnect pump cable from pump (avoid straining cables).
• Connect electrical connection to replacement pump head.
• Fit replacement pump head.
4000123942-2
46
18 Replacement of Parts
18.21 (24ci Only) Filling system tap, refer to diagram 18.12.
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4.
• Drain down the hotwater circuit, refer to relevant part of diagram 18.1.
• Pull of the filling loop tap extension.
• Pull out slotted metal clip securing tap into housing, remove tap.
• Pull out slotted metal clip and remove pipe from tap.
18.22 (24ci Only) Reduced pressure zone valve (RPZ), refer to diagram 18.12.
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4.
• Drain down the boiler only, refer to relevant part of diagram
18.1.
• Pull out slotted metal clip securing pipe to RPZ.
• Pull out slotted metal clip securing RPZ into housing, remove RPZ.
18.23 Boiler drain point, refer to diagram
18.13.
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4.
• Drain down the boiler only, refer to relevant part of diagram
18.1. Pull out slotted metal clip securing boiler drain valve into
housing, remove boiler drain valve.
REDUCED PRESSURE ZONE VALVE (RPZ)
FILLING TAP
BOILER DRAIN VALVE
11936
Diagram 18.1224ci Only
9841
Diagram 18.13
9846
18.24 (24ci Only) Water flow sensor, refer to diagram 18.14.
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4. Drain down the hotwater circuit, refer to relevant part of
Section 18.1.
• Undo the union nut on the cold water inlet isolating valve.
• Pull out slotted metal clip securing filling system tap into housing, swing the tap forwards.
• Pull out the two slotted metal clips retaining the domestic water inlet filter housing.
• Remove domestic water inlet filter housing.
• Remove electrical connections from water flow sensor.
• Pull off slotted metal clip and remove water flow sensor.
9847
WATER FLOW SENSOR
24ci only Diagram 18.14
47
4000123942-2
18 Replacement of Parts
18.25 System water pressure sensor, refer to diagram 18.15.
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4. Drain down the boiler, refer to relevant part of Section 18.1.
• Remove electrical connections from water pressure sensor.
• Pull off slotted metal clip and remove water pressure sensor.
18.26 Bypass valve, refer to diagram 14.1.
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4. Drain down the boiler, refer to relevant part of Section 18.1.
• Remove the ignition unit, refer to Section 18.33. Pull out slotted metal clip, ease out bypass valve from bypass
valve housing.
18.27 Automatic air vent, refer to diagram
18.16.
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4.
• Drain down the boiler only, refer to relevant part of diagram
18.1.
• Unscrew to remove automatic air vent.
• After fitting replacement automatic air vent ensure the cap is open.
24ci shown
9833
SYSTEM WATER PRESSURE SENSOR
Diagram 18.15
9810
CAP
AIR VENT
Diagram 18.16
11936
18.28 Gas Control valve, refer to diagram
18.17.
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4.
• Disconnect gas supply pipe union nuts at the gas control valve.
• Disconnect injector supply pipe union nut at the gas control valve. Slacken the union nut at the burner injector bar.
• Remove the wire restraining clip from underside of gas control valve
• Ease gas control valve forwards and disconnect electrical connections to gas control valve.
Note: Use the new washers supplied with the gas control valve.
• Withdraw gas control valve assembly.
• Fit gas restrictor to replacement gas control value.
• Fit replacement gas control valve. If the step pressure requires adjusting, refer to Section 13
Changing Gas Type.
24ci shown
GAS CONTROL VALVE
9842
Diagram 18.17
4000123942-2
48
18 Replacement of Parts
18.29 Gas control valve stepper motor, refer to diagram 18.18
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4.
Remove the gas control valve, refer to Section 18.28.
Disconnect the electrical connection from stepper motor.
Remove the two screws securing stepper motor to the gas
control valve.
• Fit replacement gas control valve stepper motor.
• Note: Take care not to damage the 'O' ring.
18.30 Discharge safety valve, refer to diagram
18.19.
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4.
• Drain down the boiler, refer to relevant part of section 18.1
• Undo discharge pipe union nut.
• Pull out slotted metal clip from valve body and remove valve.
18.31 (24ci Only) Three-way valve head, refer to diagram 18.20.
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4.
• Remove gas control valve, refer to Section 18.28. (It will not be necessary to remove the gas control electrical cables).
• Remove electrical plug from valve head.
• Pull out slotted metal clip from valve body and remove valve head from body.
• Fit replacement valve head. Note :
1) When refitting clip, ensure that letters YES are as shown.
2) It is not necessary to drain boiler to carry out this work.
10018
24ci shown
GAS CONTROL VALVE
STEPPER MOTOR
Diagram 18.18
PRESSURE RELIEF VALVE
Diagram 18.19
9794
9848
49
24ci only
THREE WAY VALVE HEAD
Diagram 18.20
4000123942-2
18 Replacement of Parts
18.32 (24ci Only) Three-way valve actuator, refer to diagram 18.21.
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4.
• Drain down the boiler only, refer to relevant part of diagram
18.1.
• Remove the gas control valve, refer to Section 18.28.
• Remove 3-way valve head, refer to Section 18.31.
• Remove the three way valve actuator.
18.33 Ignition unit, refer to diagram 18.22.
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4.
• For ease of access remove the left hand side panel, refer to
Section 15.6.
• Disconnect electrical connections.
• Remove ignition unit securing screw.
• Pull upwards to release and remove the ignition unit from the retaining slot.
24ci only
10017
THREE WAY VALVE/ BYPASS HOUSING
THREE WAY VALVE ACTUATOR
Diagram 18.21
IGNITION UNIT
9785
9845
18.34 (24ci Only) Domestic hot water plate to plate heat exchanger
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4.
• Drain down the boiler and hotwater circuit ,refer to relevant parts of diagram 18.1.
• Unclip the central heating thermistor.
• Unscrew the heating flow pipe union nut, swing pipe forwards.
• Remove the gas supply pipe between the gas control valve and injector bar, see diagram 18.23.
• Disconnect the union connection from the expansion vessel.
• Supporting domestic hot water plate to plate heat exchanger, unscrew and remove two screws securing it onto pump mounting and 3-way valve/bypass housing.
• Remove plate to plate heat exchanger from boiler.
• Fit replacement plate to plate heat exchanger. Note: Plate to plate heat exchanger mounting screws are offset
to ensure correct fitting.
DOMESTIC HOT WATER PLATE TO PLATE HEAT EXCHANGER
Diagram 18.22
9870
4000123942-2
9850
24ci only Diagram 18.23
50
18 Replacement of Parts
18.35 Expansion vessel
Renewal of the expansion vessel requires the boiler to be removed from the wall. As an alternative, a separate expansion vessel of the same specification may be connected as close as possible to the boiler, leaving the original in position, refer to the installation instructions.
Replacing the expansion vessel Before starting refer to the front of Section 18 Important
information.
• For this operation the boiler must be removed from the wall.
• IMPORTANT: With regards to the manual handling operations, 1992 regulations, the following operation exceeds the recommended weight for one man lift.
• Remove the front panel, refer to Section 15.3.
• Lower the control panel, refer to Section 15.4.
• Drain down the boiler only ,refer to relevant parts of diagram 18.1.
• Disconnect the flue system.
• Disconnect the fixing jig connection pipes at the boiler.
• Disconnect the pressure relief valve discharge pipe.
• Disconnect the mains cable and any external controls cables.
• Lift up to remove the boiler from the wall.
• Remove sealed chamber cover, refer to Section 15.4.
• Remove the right hand side panel, refer to Section 15.6.
• From the rear of the boiler, unclip wiring harness retaining wire.
• Undo pipe coupling on expansion vessel.
• Unscrew and remove expansion vessel bracket retaining screw.
• Slide expansion vessel to the left and forward to remove. Note: Check that expansion vessel pressure is correct, see
‘Section 1 Technical Data’.
9873
24ci shown
EXPANSION VESSEL
9872
9871
Diagram 18.24
10063
18.36 Sealed chamber cover seal, refer to diagram 18.25
Before starting refer to the front of Section 18 Important information.
• Remove the front panel, refer to Section 15.3.
• Remove the sealed chamber cover, refer to Section 15.5.
• Remove the old seal, thoroughly clean the casing. Fit the new seal, it is supplied to the correct length.
Note: Ensure the seal is fitted correctly giving an air tight seal.
SEALED CHAMBER COVER
SEAL
FRONT PANEL
Diagram 18.25
51
4000123942-2
19 Spare parts
When ordering spare parts, quote the part number and description, stating the appliance model number and serial number from the data label.
Short parts list
No. Description Part No. G.C. No.
1 Central heating thermistor 801935 E91-959 2 Fan 801920 E92-062 3 Air pressure switch 801921 E91-953 4 24ci only Domestic water flow sensor 801910 E84-014 5 Printed circuit board - Main 801915 E91-904 6 Pump head 801896 7 System water pressure sensor 801911 E83-997 8 Gas control valve (G20) 801891 E91-945 9 Gas control valve (G30) 801978 E92-058 10 Discharge safety valve 801904 E94-000 11 Overheat thermostat 801913 E91-949 12 Ignition electrode 801888 E91-917 13 Flame sense electrode 801887 E91-922 14 230V controls board 801923 E84-018 15 User interface PCB 801922 E91-954 16 Stepper motor (G20) 801892 E91-924 17 Stepper motor (G30) 801979 E92-059 18 Ignition unit 801936 E91-960 19 24ci only Three way valve motor 801912 E88-839 20 Three way valve actuator 801903 E88-838 21 Heat exchanger 801881 E91-939 22 Burner / 14 Blades 801890 E91-944
Because of our constant endeavour for improvement details may vary slightly from those in the instructions.
4000123942-2
52
Loading...