Glow-worm 18-30sxi User Manual

0020008155A.02.05
Instructions for Use
Installation and Servicing
To be left with the user
18sxi
12041
G.C. No. 41-047-72
30sxi
G.C. No. 41-047-62
High Efficiency
System Boiler
Glow-worm, Nottingham Road, Belper, Derbyshire. DE56 1JT
www.glow-worm.co.uk
Guarantee Registration
Thank you for installing a new Glow-worm appliance in your home. Glow-worm appliances are manufactured to the very highest standard so we are pleased to offer our customers a Comprehensive Guarantee. This product is guaranteed for 24 months from the date of installation or 30 months from the date of manufacture, whichever is the shorter, for parts. In addition this product is guaranteed for 12 months from the date of installation or 18 months from the date of manufacture, whichever is the shorter, for labour. The second year of the parts guarantee, from the beginning of the 13th month onwards after installation or manufacture, is conditional upon the boiler having been serviced by a CORGI registered gas installer, in accordance with the manufacturer's recommendations. We strongly recommend regular servicing of your gas appliance, but where the condition is not met, any chargeable spare parts or components issued within the applicable guarantee period still benefit from a 12 month warranty from the date of issue by the manufacturer.
We recommend you complete and return as soon as possible your guarantee registration card.
If your guarantee registration card is missing you can obtain a copy or record your registration by telephoning the Glow-worm Customer Service number 01773 828100.
For customer service call:
01773 828100
Technical helpline: 01773 828300
For General and Sales enquiries:
Tel. 01773 824639
Fax: 01773 820569
To register your Glow-worm appliance call:
0800 073 2142
0020008155A
2
Contents
The instructions consist of three parts, User, Installation and Servicing Instructions. The
instructions are an integral part of the appliance and must, to comply with the current issue
of the Gas Safety (Installation and Use) Regulations, be handed to the user on completion
of the installation.
CONTENTS DESCRIPTION SECTION PAGE No.
Important Information 4
INTRODUCTION
General Information 5 Manual Handling 5
INSTRUCTIONS
FOR USE
INSTALLATION
INSTRUCTIONS
SERVICING
INSTRUCTIONS
Appliance Safety Devices 7 Maintenance and Servicing 7 Operating the Boiler 8
Technical Information 1 9 Boiler Location and Ventilation 2 12 Flue Location and Ventilation 3 13 Heating System 4 15 Domestic Hot Water System 5 16 Installation Preparation 6 17 Gas/Water & Appliance Connection 7 19 Safety Discharge Valve and Condensate Connections 8 20 Flue Preparation Telescopic and Standard Flue 9 22 Electrical Connections 10 25 Commissioning 11 27
Servicing 12 30 Fault Finding 13 34 Replacement of Parts 14 38 Spare Parts 15 48
3 0020008155A
Important Information
WARNINGS
Gas Leak or Fault
Turn off the gas emergency control valve immediately. Eliminate all sources of ignition, i.e.smoking, blowlamps, hot air guns
etc. Do not operate electrical lights or switches either on or off. Open all doors and windows,ventilate the area.
Sheet Metal Parts
This boiler contains metal parts (components) and care should be taken when handling and cleaning,
Under no circumstances must the User interfere with or adjust sealed parts.
with particular regard to edges.
Sealed Components
Gas Category
This boiler is for use only on G20 natural gas, but the 30sxi may be converted for use on G31 gas (Propane L.P.G.).
Gas safety (Installation and use) Regulations
In your interests and that of gas safety, it is the law that ALL gas appliances are installed and serviced by a competent person in accordance with the above regulations.
Testing and Certification
This boiler is tested and certificated for safety and performance. It is therefore important that no alteration is made to the boiler, without permission, in writing, from Glow-worm.
Any alteration not approved by Glow-worm, could invalidate the certification, boiler warranty and may also infringe the current issue of the Statutory Requirements.
CE Mark
This boiler meets the requirements of Statutory Instrument No. 3083 The boiler (Efficiency) Regulations, and therefore is deemed to meet the requirements of Directive 92/42/EEC on the efficiency requirements for new hot water boilers fired with liquid or gaseous fuels.
Type test for purposes of Regulation 5 certified by: Notified body 0087.
Product/production certified by: Notified body 0086.
The CE mark on this appliance shows compliance with:
1. Directive 90/396/EEC on the approximation of the laws of the Member States relating to appliances burning gaseous fuels.
2. Directive 73/23/EEC on the harmonization of the Laws of the Member States relating to the electrical equipment designed for use within certain voltage limits.
3. Directive 89/336/EEC on the approximation of the Laws of the Member States relating to electromagnetic compatibility.
Control of Substances Hazardous to Health
The adhesives and sealants used in this appliance are cured and give no known hazard in this state.
Insulation Pads / Ceramic Fibre
If you have a history of skin complaint you may be susceptible to irritation. High dust levels are usual only if the material is broken. Normal handling should not cause discomfort, but follow normal good hygiene and wash your hands before eating, drinking or going to the lavatory. If you do suffer irritation to the eyes or severe irritation to the skin seek medical attention. The insulation is composed of non-combustible material.
Electrical Supply
The boiler must be earthed.
All system components shall be of an approved type and shall be connected in accordance with the current issue of BS7671 and any applicable local regulations.
External wiring must be correctly earthed, polarised and in accordance with the relevant standards.
In GB this is BS 6891.
In IE this is the current edition of I.S.813 "Domestic Gas Installations".
The boiler must be connected to a permanent 230V ac, 50Hz supply.
Connection of the whole electrical system of the boiler, including any heating controls, to the electrical supply must be through one common isolator.
Isolation should be by a double pole switched fused spur box, with a minimum gap of 3mm for both poles. The fused spur box should be readily accessible and preferably adjacent to the appliance. It should be identified as to its use.
Alternatively, an unswitched shuttered socket outlet and 3A fused 3 pin plug, both to the current issue of BS1363 may be used provided that they are not used in a room containing a bath or shower.
o
Wiring to the boiler must be PVC 85 than 0.75mm2 (24/0.20mm).
C insulated cable, not less
0020008155A
Sealed System
Draining, refilling and pressurising MUST be carried out by a competent person.
4
General Information
General Note
This condensing system boiler is designed to provide central heating from a sealed water system with a fully indirect cylinder. The central heating water temperature can be adjusted on the boiler.
Once the controls are set the boiler operates automatically.
Please read these instructions and follow them carefully for the correct and economical use of your boiler.
Water Treatment
In the case of an existing installation, it is ESSENTIAL that prior to installing the new boiler the system is thoroughly flushed. For optimum performance after installation of a new system, the boiler and its associated central heating system should also be flushed. Flushing should be carried out in accordance with BS7593: 1992 using a cleanser such as Sentinel X300 or X400, Fernox Superfloc or Salamander corrosion guard cleaner.
For long-term corrosion protection, after flushing, an inhibitor suitable for stainless steel exchangers should be used, refer to the current issue of BS 5449 and BS 7593 on the use of inhibitors in central heating systems. Examples are Sentinel X100 Fernox or Salamander corrosion guard inhibitor.
Compartment or Cupboard Installations
If the boiler is fitted into a compartment or cupboard it does not require ventilation openings.
Do not use the compartment or cupboard for storage.
Condensate Drain
The condensate drain, see section 8.2, must not be modified or blocked.
Pluming from flue terminal
Like all condensing boilers this appliance will produce a plume of condensation from the flue terminal in cool weather. This is due to the high efficiency and hence low flue gas temperature of the boiler. It is normal and not a fault indication.
Cleaning
The boiler casing can be cleaned using a mild liquid detergent with a damp cloth, then a dry cloth to polish.
Do not use any form of abrasive or solvent cleaner as you may damage the paintwork.
Electrical Supply
If the mains electricity and gas are to be turned off for any long periods during severe weather, it is recommended that the whole system, including the boiler, should be drained to avoid the risk of freezing. Make sure that, if fitted, the immersion heater in the cylinder is switched off.
Clearances
If fixtures are positioned close to the boiler, space must be left as shown in diagram 2.1. Enough space must also be left in front of the boiler to allow for servicing.
Manual Handling
IMPORTANT: With regards to the Manual Handling Operations,
1992 Regulations, the following lift operation exceeds the recommended weight for a one man lift.
General recommendations when handling
Clear the route before attempting the lift.
Ensure safe lifting techniques are used – keep back straight – bend using legs.
Keep load as close to body as possible.
Do not twist – reposition feet instead.
If 2 persons performing lift, ensure co-ordinated movements during lift.
Avoid upper body/top heavy bending - do not lean forward/ sideways.
Recommend wear suitable cut resistant gloves with good grip to protect against sharp edges and ensure good grip.
Always use assistance if required.
Removal of carton from delivery van
Recommend 2 person lift or 1 person with use of sack truck. If 1 person is performing lift, straddle the load, tilt and place carton into position on truck. Recommend secure appliance onto truck with suitable straps. Ensure safe lifting techniques are used – keep back straight – bend using legs. Keep load as close to body as possible. If 2 persons performing lift, ensure co­ordinated movements during lift. Always use assistance if required.
Carriage of carton from point of delivery to point of installation – ground floor
Recommend 2 person lift or 1 person with use of sack truck. If 1 person is performing lift, straddle the load, tilt and place carton into position on truck. Recommend secure appliance onto truck with suitable straps. Ensure safe lifting techniques are used – keep back straight – bend using legs. Keep load as close to body as possible. If 2 persons performing lift, ensure co­ordinated movements during lift. Clear the route before attempting the lift. If removing boiler from truck straddle the load and tilt forwards to facilitate secure grip. Ensure safe lifting techniques are used – keep back straight – bend using legs. Do not twist – reposition feet instead. Take care to avoid trip hazards, slippery or wet surfaces and when climbing steps and stairs. Always use assistance if required.
5 0020008155A
Manual Handling
Carriage of carton from point of delivery to point of installation – first or higher floor, cellar.
Recommend 2-person lift or 1 person with use of sack truck. If 1 person is performing lift, straddle the load, tilt and place carton into position on truck. Recommend secure appliance onto truck with suitable straps. Ensure safe lifting techniques are used – keep back straight – bend using legs. Keep load as close to body as possible. If 2 persons performing lift, ensure co­ordinated movements during lift. Avoid upper body/top heavy bending - do not lean forward/sideways. Clear the route before attempting the lift. If removing boiler from truck straddle the load and tilt forwards to facilitate secure grip. Ensure safe lifting techniques are used – keep back straight – bend using legs. Do not twist – reposition feet instead. Take care to avoid trip hazards, slippery or wet surfaces and when climbing steps and stairs. Always use assistance if required.
Carriage of carton from point of delivery to point of installation – roofspace.
Recommend 2-person lift. Ensure co-ordinated movements during lift. Avoid upper body/top heavy bending - do not lean forward/sideways. Clear the route before attempting the lift. Take care to avoid trip hazards, slippery or wet surfaces and when climbing steps and stairs. When transferring appliance into roofspace, recommend 1 person to be in roofspace to receive the appliance and other person to be below to pass up and support appliance. Ensure safe lifting techniques are used – keep back straight – bend using legs. Keep load as close to body as possible. Always use assistance if required. It is assumed safe access, flooring and adequate lighting are provided in the roof space. It is recommended a risk assessment of the roof space area be carried out before moving the appliance into the area to take into account access, stability of flooring, lighting and other factors, and appropriate measures taken.
Unpacking of appliance from carton.
Recommend 2 persons unpack appliance from carton. Always keep working area clear. Recommend cut base end of carton and open carton flaps, then tilt boiler forwards from its side onto its base and remove carton by sliding up over the boiler. Ensure safe lifting techniques are used – keep back straight – bend using legs. Keep load as close to body as possible. Always use assistance if required. Dispose of packaging in a responsible manner. Recommend wear suitable cut resistant gloves with good grip to protect against sharp edges and ensure good grip when handling appliance outside packaging.
Positioning of Appliance for Final Installation – no obstructions.
Recommend 2 persons lift appliance to position into place. Fit bracket securely onto wall before lifting appliance into position. Obtain firm grip on front and sides of appliance, lift upwards, ensure stable balance achieved and lift upwards to position in place on bracket. Ensure safe lifting techniques are used – keep back straight – bend using legs - when lifting load from floor level. Do not twist – reposition feet instead. Keep boiler as close as possible to body throughout lift to minimise strain on back. Ensure co-ordinated movements to ensure equal spread of weight of load. Always use assistance if required. Recommend wear suitable cut resistant gloves with good grip to protect against sharp edges and ensure good grip when handling appliance.
Positioning of Appliance for Final Installation – above worktop, foreseeable obstructions etc.
Recommend 2 persons lift appliance to position into place. Fit bracket securely onto wall before lifting appliance into position. Obtain firm grip on front and sides of appliance, lift upwards, onto worktop if practicable. Ensure stable balance achieved and lift upwards to position in place on bracket. If 2 persons positioning onto bracket obtain firm grip at front and sides/base of boiler. Ensure co-ordinated movements during 2 person lifts to ensure equal spread of weight of load. Ensure safe lifting techniques are used – keep back straight – bend using legs ­when lifting load from floor level. Do not twist – reposition feet instead. Keep boiler as close as possible to body throughout lift to minimise strain on back. Avoid upper body/top heavy bending - do not lean forward/sideways. Always use assistance if required. Recommend wear suitable cut resistant gloves with good grip to protect against sharp edges and ensure good grip when handling appliance.
Positioning of Appliance for Final Installation – within compartment etc. restricting installation.
Recommend 2 persons lift appliance to position into place, space permitting. Fit bracket securely onto wall before lifting appliance into position. Obtain firm grip on front and sides of appliance, lift upwards, onto worktop if practicable. Ensure stable balance achieved and lift upwards to drop into place onto bracket. If 2 persons positioning onto bracket obtain firm grip at front and sides/base of boiler. Ensure co-ordinated movements during 2 person lifts to ensure equal spread of weight of load. If 1 person positioning onto bracket recommend obtain firm grip supporting base of boiler. Ensure safe lifting techniques are used – keep back straight – bend using legs - when lifting load from floor level. Do not twist – reposition feet instead. Keep boiler as close as possible to body throughout lift to minimise strain on back. Always use assistance if required. Recommend wear suitable cut resistant gloves with good grip to protect against sharp edges and ensure good grip when handling appliance.
Positioning of Appliance for Final Installation – in roof space restricting installation.
Recommend 2 persons lift appliance to position into place, space permitting. Fit bracket securely onto wall before lifting appliance into position. Obtain firm grip on front and sides of appliance, lift upwards, ensure stable balance achieved and lift upwards to position into place onto bracket. If 2 persons positioning onto bracket obtain firm grip at front and sides/base of boiler. Ensure co-ordinated movements during 2 person lifts to ensure equal spread of weight of load. If 1 person positioning onto bracket recommend obtain firm grip supporting base of boiler. Ensure safe lifting techniques are used - keep back straight – bend using legs - when lifting load from floor level. Do not twist – reposition feet instead. Keep boiler as close as possible to body throughout lift to minimise strain on back. Always use assistance if required. Recommend wear suitable cut resistant gloves with good grip to protect against sharp edges and ensure good grip when handling appliance. It is recommended a risk assessment of the roof space area be carried out before moving the appliance into the area to take into account access, stability of flooring, lighting and other factors, and appropriate measures taken.
0020008155A
6
Appliance Safety Devices - User Instructions
Electrical Supply Failure Reset Switch
The boiler will not work without an electrical supply.
Normal operation of the boiler should resume when the electrical supply is restored.
Reset any external controls, to resume normal operation of the central heating.
If the boiler does not resume normal operation turn the mains reset switch off and on. If the boiler does not resume normal operation after this the overheat stat may have operated.
Overheating Safety
In the event of the boiler overheating the safety devices will cause a safety shutdown. If this happens, call your Installation/ Servicing company.
Frost Protection
The appliance has a built in frost protection programme as long as the electricity and gas are left switched on.
This device operates the burner and system pump when the temperature inside the boiler falls to 3
Any other exposed areas of the system should be protected by a separate frost thermostat.
0
C.
Condensate Drain Blockage
As a safety feature the boiler will stop working if the condensate drain becomes blocked. During freezing conditions this may be due to the forming of ice in the condense drain external to the house. Release an ice blockage by the use of warm cloths on the pipe. The boiler should then restart. Contact your installation/ servicing company if the fault persists.
Maintenance and Servicing - User Instructions
Maintenance and Servicing
To ensure the continued efficient and safe operation of the appliance it is recommended that it is checked and serviced as necessary at regular intervals. The frequency of servicing will depend upon the particular installation conditions and usage, refer to guarantee registration on the inside front cover of this literature.
If this appliance is installed in a rented property in the UK there is a duty of care imposed on the owner of the property by the current issue of the Gas Safety (Installation and Use) Regulations, Section 35.
Servicing/maintenance should be carried out by a competent person in accordance with the rules in force in the countries of destination.
To obtain service, please call your installer or Glow-worm’s own service organisation using the telephone number on the inside front cover of this literature.
Please be advised that the ‘Benchmark’ logbook should be completed by the installation engineer on completion of commissioning and servicing.
All CORGI Registered Installers carry a CORGI ID card, and have a registration number. Both should be recorded in your benchmark Logbook. You can check your installer is CORGI registered by calling CORGI direct on: 01256 372300.
Spare Parts
Remember, when replacing a part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not use reconditioned or copy parts that have not been clearly authorised by Glow-worm.
If a part is required contact Glow-worm’s own service organisation using the telephone number on the inside front cover of this booklet.
Please quote the name of the appliance, this infomation will be on the name badge on the front of the appliance.
If in doubt seek advice from the local gas company or Glow­worm’s own service organisation using the telephone number on the inside front cover of this booklet.
7 0020008155A
Operating the Boiler - User Instructions
CONTROLS FASCIA
CONTROL LIGHT
MAINS RESET SWITCH
CENTRAL HEATING WATER TEMPERATURE CONTROL
DIGITAL DISPLAY
OPERATION OF THE BOILER
1. Check that all isolating valves on the boiler are open and that water flows from the hot water tap.
2. If you are in any doubt about the boiler being filled with water contact your installer or Glow-worm's own service
organisation using the telephone number on the inside front cover of this booklet. Do not operate the boiler
without water.
3. Check that the electrical supply to the boiler is ON and set any remote controls as required.
4. With the Central Heating Water Temperature Control in its "OFF" (0) position, turn the Mains Reset Switch to the ON (1) position, the running lamp will initially illuminate (green) then go off, the system pressure will be displayed and should read on the digital display, at least 0.7bar (recommended 1.0bar), if less you MUST contact your installation / servicing company.
9239
Diagram 1
USER CONTROLS
CENTRAL HEATING CONTROL
1. Turn the central heating water temperature control "ON", the lighting sequence will begin, the running lamp will illuminate (green) to indicate the boiler has lit, the system temperature will now be displayed instead of system pressure.
The temperature of the central heating water can be adjusted by turning the central heating water temperature control to desired setting between 1 'Min' and
Set the control to
If the boiler fails to light, reset the controls, see paragraph below, TO RESET
If a fault occurs the running lamp will flash red and a fault code will appear on the digital display.
TO RESET
2. Turn the Mains Reset Switch to 0, wait for 5 seconds, turn Mains Reset Switch to 1, the boiler is reset.
If the fault persists contact your installer/service provider using the telephone number on the inside font cover of this booklet.
TO TURN THE BOILER OFF
3. Turn the Mains Reset Switch to the OFF (0) position.
Turn the gas supply OFF at the gas service cock if the boiler is to be out of use for some time.
'0' to switch off heating.
'Max'. Maximum setting is appoximately 82°C.
0020008155A
8
1 Technical Information
87
THIS DIMENSION CAN BE INCREASED TO 600mm MAX.
77
176
334
FLUE
GAS
14
FLUE CENTRE LINE
C
L
76
C
L
BOILER
715
SAFETY DISCHARGE DRAIN
177
22
48
18
12860
Standard Flue
1.1 IMPORTANT NOTICE
The boiler is supplied in one pack, the flue and fixing jig are supplied seperately.
This boiler is for use only on G20 natural gas, but the 30sxi may be converted for use on G31 gas (Propane L.P.G.).
Where no British Standards exists, materials and equipment should be fit for their purpose and of suitable quality and workmanship.
Refer to Manual Handling Operations, 1992 Regulations.
The installation of this boiler must be carried out by a competent person in accordance with the rules in force in the countries of destination.
Manufacturer’s instructions must not be taken as overriding statutory requirements.
1.2 Statutory Requirements
In GB the installation of the boiler must be carried out by a competent person as described in the following regulations:
The manufacturer’s instructions supplied.
The Gas Safety (Installation and Use) Regulations.
The appropriate Buildings Regulations either The Building Regulations, The Building Regulations (Scotland),The Building Regulations (Northern Ireland).
The Water Fittings Regulations or Water byelaws in Scotland.
The Health and Safety at Work Act, Control of Substances Hazardous to Health (COSHH).
The Current I.E.E. Wiring Regulations.
156
450
134
Diagram 1.1
Where no specific instructions are given, reference should be made to the relevant British Standard Code of Practice.
In IE, the installation must be carried out by a competent person and installed in accordance with the current edition of I.S.813 "Domestic Gas Installations", the current Building Regulations and reference should be made to the current ETCI rules for Electrical Installation.
In GB the following Codes of Practice apply:
BS4814, BS6798, BS5440 Part 1 and 2, BS5546 Part 1, BS5449, BS6891, BS6700, BS7074 Part 1 and 2, BS7593, BS7671.
In IE: I.S.813, BS5546, BS 5449, BS 7074, BS 7593.
Manufacturer’s instructions must not be taken as overriding statutory requirements.
NOTE: For further information, see the current issue of the Building Regulations, approved document L1 ( in the UK) and the references:
1) GIL 59, 2000: Central heating system specification (CheSS) and
2) GPG 302, 2001: Controls for domestic central heating system and hot water. BRECSU.
Certification
This boiler certificated to the current issue of EN 483 for performance and safety.
It is important that no alteration is made to the boiler, without permission, in writing, from Glow-worm.
Any alteration that is not approved by Glow-worm, could invalidate the warranty and could also infringe the current issue of the Statutory Requirements.
9 0020008155A
1 Technical Information
1.3 Gas Supply
The gas installation must be in accordance with the relevant standards.
In GB this is BS6891.
In IE this is the current edition of I.S.813 "Domestic Gas Installations".
The supply from the governed meter must be of adequate size to provide a steady inlet working pressure of 20mbar (8in wg) at the boiler.
On completion, test the gas installation for soundness using the pressure drop method and suitable leak detection fluid, purge in accordance with the above standard.
1.4 Technical Data
All dimensions are given in millimetres (except as noted).
Refer to diagrams 1.1, 1.3 and Tables 1 and 2.
The data label is positioned on the inner door, refer to diagram 1.2.
The Seasonal Efficiency Domestic Boilers UK (SEDBUK) is: 18 and 30 sxi: Class ‘A’.
The value is used in the UK Government's Standard Assessment Procedure (SAP) for energy rating of dwellings. The test data from which it has been calculated has been certified by B.S.I..
12341
12531
1.5 Condensation Drain
A plastic drain pipe must be fitted to allow discharge of condensate to a drain.
Condensate should, if possible, be discharged into the internal household draining system. If this is not practical, discharge can be made externally into the household drainage system or a purpose designed soak away, see section 8.2 for more details.
1.6 Vertical Plumbing Kit
Where the heating flow and return pipes come from above the boiler a vertical plumbing kit is available,
Central Heating Kit Pt. No. 2000460477.
Contact Glow-worm for further details.
Do not route any pipes behind the boiler, unless a vertical plumbing kit is used or the pipes are "chased" into the wall.
Diagram 1.2
0020008155A
10
1 Technical Information
Total Weight 18sxi 41kg (90lb)
Gas connection Rc1/2 (1/2in BSPT)
Water connection 22mm copper
Safety valve Preset 3bar (43.5lbf/in
Safety valve discharge 15mm copper
TABLE 1
30sxi 44.5kg (98lb)
2
)
HEAT EXCHANGER
FAN
BURNER
OVERHEAT CUT-OFF
EXPANSION
VESSEL
FLOW THERMISTOR
RETURN THERMISTOR
10155
Expansion vessel capacity 8 litres (1.76 gallons) Charge pressure 0.5bar (7.3lbf/in
System min. pressure 0.7bar (10.1lbf/in2)
Maximum system 130 litres (28.6 gallons) content using fitted at 750C average system expansion vessel temperature
Electrical supply 230V~50Hz
Electrical rating 180W fused 3A
IP classification X4D
Internal Fuse rating
On PCB 630mAT
2
)
Ball valves are fitted in water and gas connections.
For larger systems use an additional
expansion vessel.
GAS CONTROL VALVE
AUTOMATIC AIR VENT
PUMP
C.H. FLOW
SAFETY VALVE
DISCHARGE
BYPASS
C.H. INLET FILTER
GAS
SCHEMATIC LAYOUT OF BOILER
C.H. RETURN
Diagram 1.3
DRAIN TA P
TABLE 2
18sxi
BURNER
%CO
APPROXIMATE
GAS RATE
(after 10 mins.
from cold)
Case Off 9.1 +0.2 -0.5
Case On 9.3 +0.3 -0.5
2
MIN MAX
m3/h
0.53 2.00
ft3/h
18.7 71
30sxi
BURNER
%CO
APPROXIMATE
GAS RATE
(after 10 mins.
from cold)
11 0020008155A
Case Off 9.1 +0.2 -0.5
2
Case On 9.3 +0.3 -0.5
MIN MAX
m3/h
0.53 3.0
ft3/h
18.7 107
2 Boiler Location and Ventilation
2.1 Location
This boiler is not suitable for outdoor installation.
This boiler may be installed in any room, although particular attention is drawn to the installation of a boiler in a room containing a bath or shower where reference must be made to the relevant requirements.
This boiler is suitable for installation in bathroom zones 2 and 3.
In GB this is the current I.E.E. WIRING REGULATIONS and BUILDING REGULATIONS.
In IE reference should be made to the current edition of I.S.813 "Domestic Gas Installations" and the current ETCI rules.
The boiler must be mounted on a flat wall, which is sufficiently robust to take its total weight, see Table 1.
12344
5
5
600
2.2 Clearances
The boiler should be positioned so that at least the minimum operational and servicing clearances are provided, see diagram
2.1.
Additional clearances may be beneficial around the boiler for installation and servicing.
For flue installations where external access is not practicable, consideration should be given for the space required to insert the flue internally, which may necessitate clearance larger than those specified in diagram 2.1.
2.4 Timber Frame Buildings
If the boiler is to be installed in a timber building it should be fitted in accordance with the Institute of Gas Engineers document IGE/UP/7/1998. If in doubt seek advice from the local gas undertaking or Glow-worm.
2.5 Room Ventilation
The boiler is room sealed, so when it is installed in a room or space, a permanent air vent is not required.
2.6 Cupboard or Compartment Ventilation
Due to the high efficiency and hence low casing temperature of this boiler, cupboard or compartment ventilation is not necessary.
Leave existing air vents.
150
5
20 20
200
† A removable compartment door can be placed at least 5mm in front of the appliance.
0020008155A
MINIMUM CLEARANCE FROM PERMANENT SURFACES
12
Diagram 2.1
3 Flue Location and Ventilation
3.1 Flue Options
This boiler is suitable for concentric Horizontal and Vertical flues, elevated horizontal and vertical twin, all are fitted onto the top of the boiler.
The Glow-worm Flue Options Guide, available on request or through the web site, describes in detail the necessary accessories.
These instructions describe the use of the standard and telescopic horizontal flues.
The instructions for all other flues will be contained in those packs.
75 min. to 540 max.
WALL THICKNESS
87min
112
3.2 Flue Length
The maximum permissable horizontal flue length is 10 metres plus the flue terminal, this can be achieved by use of the accessories, however should additional 90 be used then the length MUST be reduced by 1metre.
When extension pipes are used the flue system must be designed to have a continuous fall to the boiler of at least 2.5 44mm/metre to allow condensate to run back into the boiler and out via the drain.
The flue can be installed from inside the building, when access to the outside wall face is not practicable.
The diagrams 3.1 to 3.4 describe the lengths achievable without the use of extensions or elbows.
208 min. to 413 max.
12839
87min
WALL THICKNESS
o
or 2 x 45o elbows
112
o
12837
176
OUTSIDE WALL FACE
NOTE. If necessary, it is permitted to increase this dimension to 600mm max.
BOILER MOUNTING WALL
TOP REAR FLUE - STANDARD
NOTE. If necessary, it is permitted to increase this dimension to 600mm max.
87min
Max flue length 717mm
20mm min. clearance
A
Diagram 3.1
211239
C
L
FLUE
12840
176
OUTSIDE WALL FACE
NOTE. If necessary, it is permitted to increase this dimension to 600mm max.
BOILER MOUNTING WALL
TOP REAR FLUE - TELESCOPIC
NOTE. If necessary, it is permitted to increase this dimension to 600mm max.
87min
Max flue length 589mm
20mm min. clearance
A
Diagram 3.3
211239
C
L
FLUE
12838
OUTSIDE WALL FACE
INTERNAL SURFACE
A
Max. distance from outside
wall face to min clearance. LH - 458mm
Min. distance from outside wall face to min clearance. LH/RH - 75mm
RH - 486mm
TOP SIDE FLUE - STANDARD
OUTSIDE WALL FACE
Max. distance from outside wall face to min clearance. LH - 330mm RH - 358mm
Diagram 3.2 Diagram 3.4
TOP SIDE FLUE - TELESCOPIC
INTERNAL SURFACE
A
Min. distance from outside
wall face to min clearance. LH - 125mm RH - 153mm
13 0020008155A
3 Flue Location and Ventilation
MINIMUM SITING DIMENSIONS FOR FANNED FLUE TERMINALS POSITION MM
HORIZONTAL FLUES
A DIRECTLY BELOW AN OPENING, AIR BRICK,
OPENING WINDOWS 300
B ABOVE AN OPENING, AIR BRICK,
OPENING WINDOWS 300
C HORIZONTALLY TO AN OPENING,
AIR BRICK, OPENING WINDOWS 300
D BELOW GUTTER, DRAIN/SOIL PIPE 25
E BELOW EAVES 25
F BELOW A BALCONY OR CAR PORT 25
G FROM VERTICAL DRAIN PIPES AND
SOIL PIPES 25
H FROM INTERNAL/EXTERNAL CORNERS 25
H TO A BOUNDARY ALONGSIDE THE
*
TERMINAL 300
I ABOVE ADJACENT GROUND OR
BALCONY LEVEL 300
J FROM SURFACE OR A BOUNDARY
*
FACING THE TERMINAL 600
K FACING TERMINALS 1200
L FROM OPENING (DOOR/WINDOW)
IN CAR PORT INTO DWELLING 1200
M VERTICAL FROM A TERMINAL 1500
N HORIZONTALLY FROM A TERMINAL 300
3.4 Terminal Position
The minimum acceptable siting dimensions for the terminal from obstructions, other terminals and ventilation openings are shown in diagram 3.5. For Ireland the minimum distances for flue terminal positioning must be those detailed in I.S.813 "Domestic Gas Installations".
The terminal must be exposed to the external air, allowing free passage of air across it at all times.
Being a condensing boiler some pluming may occur from the flue outlet. This should be taken into consideration when selecting the position for the terminal.
H
* and J* See diagram 3.5 . These dimensions comply with
the building regulations, but they may need to be increased to avoid wall staining and nuisance from pluming depending on site conditions.
Increased siting flexibility can be achieved by using the Glow­worm Plume Management Kit, A2044000 (black) or A2044100 (white).
NOTE: If necessary it is permitted to increase the terminal protrusion through the outside wall to greater than the minimum dimension of 87mm but no more than 600mm, see diagram 1.1.
Carports or similar extensions of a roof only, or a roof and one wall, require special consideration with respect to any openings, doors, vents or windows under the roof. Care is required to protect the roof if made of plastic sheeting. If the carport comprises of a roof and two or more walls, seek advice from the local gas supply company before installing the boiler.
H
* and J* See diagram 3.5 . These dimensions comply with
the building regulations, but they may need to be increased to avoid wall staining and nuisance from pluming depending on site conditions.
3.5 Terminal Guard
A terminal guard is required if persons could come into contact with the terminal or the terminal could be subject to damage.
In a terminal guard is required, it must be positioned to provide minimum of 50mm clearance from any part of the terminal and be central over the terminal.
The guard should be similar to that shown in diagram 3.6.
A suitable guard is manufactured by:
Tower Flue Components
Morley Rd.
Tonbridge
Kent
TN9 1RA
Size: 280 x 280 x 270mm.
TERMINAL GUARD
VERTICAL FLUES
P FROM ANOTHER TERMINAL 600
Q ABOVE ROOF LEVEL 300
R FROM ADJACENT OPENING WINDOW 1000
S FROM ADJACENT WALL TO FLUE 300
Diagram 3.5
0020008155A
Diagram 3.6
14
4 Heating System
4.1 General
The boiler is for use only with sealed central heating systems.
The safety valve is an integral part of the boiler and it cannot be adjusted.
The digital read-out on the controls fascia indicates the system pressure when there is no demand.
The circulation pump is integral with the boiler.
4.2 Expansion Vessel
The boiler has an integral expansion vessel with a capacity of 8 litres (1.76 gallons), with a change pressure of 0.5bar.
NOTE: The expansion vessel volume depends on the total water system volume and the initial system design pressure. To check if an additional expansion vessel is required, an accurate calculation of vessel size is given in the current issue of BS5449 and BS7074 Part 1, for IE refer to the current edition of I.S.813 "Domestic Gas Installations".
4.3 Flow Rate
The flow rate through the boiler must not be allowed to fall below that given in Table 3.
The system can be fitted with a lockable balancing valve if necessary in the main flow or return pipes shown as valve “A” in diagram 4.1.
4.4 Bypass
The boiler is fitted with an adjustable automatic bypass. Ensure that under no circumstances does the flow rate drop below the figure specified, refer to table 3 and section 11.6.
The installation of the boiler must comply with the requirements of the current issue of BS6798, in Ireland, refer also to the current edition of I.S.813 "Domestic Gas Installations".
In GB it is necessary to comply with the Water Supply (Water Fittings) Regulations 1999 (for Scotland, the Water Byelaws 2000, Scotland).
To comply with the Water regulations your attention is drawn to: The Water Regulations guide published by the Water Regulations Advisory Service (WRAS) gives full details of the requirements.
In IE the requirements given in the current edition of I.S.813 "Domestic Gas Installations" and the current Building Regulations must be followed.
4.5 Filling the Sealed System
Provision for filling the system at low level must be made, see diagram 4.2. There must be no permanent connection to the mains water supply, even through a non-return valve.
NOTE: It is important that fittings used for connection to potable water comply with the water undertakings requirements.
Table 3. Flow Rate
MODEL MINIMUM FLOW RATE
18sxi 774 litres/hr.
30sxi 1289 litres/hr.
This is equal to 20oC differential at maximum heat input.
BOILER
ADDITIONAL EXPANSION VESSEL (if required)
* BYPASS
RETURN
(if required)
HEATING CIRCUIT
FLOW CONTROL VALVE
'A'
DRAIN POINT
* Refer to section 11.6
Diagram 4.1
10157
15 0020008155A
4 Heating System
4.6 Water Treatment
In the case of an existing installation, it is ESSENTIAL that prior to installing the new boiler the system is thoroughly flushed. For optimum performance after installation of a new system, the boiler and its associated central heating system should also be flushed. Flushing should be carried out in accordance with BS7593: 1992 using a cleanser such as Sentinel X300 or X400, or Fernox Superfloc.
For long-term corrosion protection, after flushing, an inhibitor suitable for stainless steel exchangers should be used, refer to the current issue of BS 5449 and BS 7593 on the use of inhibitors in central heating systems. Examples are Sentinel X100 and Fernox.
IMPORTANT: It is ESSENTIAL that the cleanser is fully removed from the system after flushing and before adding inhibitor. Take care to ensure that all low points in the system are fully drained.
For all systems follow the manufacture's instructions, but where new radiators are fitted do not leave the cleanser in the system for longer than 24 hours.
4.7 Draining Tap
A draining tap must be provided at the lowest points of the system, which will allow the entire system to be drained.
A drain tap for the appliance is provided as an integral part of the hydroblock, see diagram 12.11.
HEATING CIRCUIT
Method 1
BOILER
BOILER
RETURNFLOW
CONTROL
VALVE
DRAIN POINT
CONTROL
VALVE
DOUBLE
CHECK
VALVE
HOSE
UNION
HOSE
UNION
SUPPLY
PIPE
TEMPORARY CONNECTION
11593
5 Domestic Hot Water System
5.1 General
General - All domestic hot water circuits, connections, fittings
must be in accordance with the relevant standards and water supply regulations.
For GB: Guidance G17 to G24 and recommendation R17 to R24 of the Water Regulations Guide.
For IE: The current edition of I.S.813 "Domestic Gas Installations".
The domestic water hot service must be in accordance with the current issue of BS5546, refer also to the current issue of BS6700.
TYPE CA BACKFLOW PREVENTION DEVICE
RETURNFLOW
CONTROL
VALVE
HEATING CIRCUIT
DRAIN POINT
Method 2
CONTROL
VALVE
AIR GAP
TUNDISH
SUPPLY
PIPE
Diagram 4.2
5.2 Domestic Hot Water Cylinder
SINGLE FEED INDIRECT CYLINDERS ARE NOT SUITABLE AND SHOULD NOT BE USED.
The domestic hot water cylinder must be of the double feed indirect coil type. It must be suitable for working at a gauge pressure of 0.35bar above the safety valve setting.
0020008155A
16
6 Installation Preparation
6.1 Appliance Pack
IMPORTANT: With regards to the Health and Safety Manual
Handling requirements, two persons shall be required to lift the appliance, refer to manual handling on page 5.
Please check the contents of packs as shown in diagram 6.1.
NOTE: The fixing pack is located in the base polystyrene packing under the boiler base.
Remove the polystyrene end packing pieces then carefully lay the boiler on its back, remove the two front casing panel securing screws and lift off the panel from two retaining lugs.
Remove the transit packaging behind the front panel and discard.
Carefully place front panel and screws to one side.
12346
Diagram 6.1
17 0020008155A
6 Installation Preparation
6.2 Wall Template
Remove the wall template from the wall mounting pack and place in the desired position on a flat wall, giving due consideration to boiler clearances, see section 2.2, and the flue you are fitting.
6.3 Flue Hole Cutting
The standard horizontal flues are designed with an internal fall of 44mm/metre towards the boiler for disposal of condensate. If the standard flue length alone is being used then the flue hole of diameter 105mm can be cut in the position marked on the wall template.
For standard side flues the horizontal flue centre line on the wall template should be extended to the side wall, and the vertical centre of the flue hole marked at 176mm from the back wall.
For installations with external access, a 105mm diameter core drill can be used.
For installations with internal access only, a 125mm diameter core should be used.
When using extension pipes with the horizontal rear flue, a core drill size of 125mm should be used to allow the extension pieces to slope at 44mm/metre (2.5
For extended side flues the flue hole centre should be determined by extending the dashed inclined line on the template to the side wall. This dashed line is drawn at 44mm/metre (2.5o) rise from the boiler. Where this line reaches the side wall, a horizontal line should be marked. The vertical centre line of the flue should then be marked at 176mm from the back wall, see diagram 6.2.
To allow for the flue passing through the wall at this angle a 125mm hole should be drilled irrespective of internal or external installation.
If necessary remove the wall template whilst drilling the flue hole.
o
) towards the boiler.
12075
2.5°
16
°
2.5 130
130
WALL TEMPLATE
EXTENDED SIDE FLUE
HANGING BRACKET
127
WALL TEMPLATE
176
0
90
Ø 125
Diagram 6.2
WALL PLUG
12050
6.4 Fixing Jig and Hanging Bracket Fixing
Reposition the wall template over the flue hole and mark the position of the fixing holes for the jig and the hanging bracket, see diagram 6.3.
Drill the four fixing holes, 2 for the hanging bracket and 1 each for the top hole of the fixing jig wall brackets and insert suitable wall plugs.
If gas and/or water pipes are to be connected through the rear wall, the holes must be drilled as marked on the wall template prior to securing the fixing jig.
Secure the fixing jig wall brackets to the wall using suitable screws.
NOTE: Due to the varied site conditions we do not supply fixings and advise that the installer should supply those which are suitable.
Locate the jig plate between the wall brackets and secure with the No. 8 self tapping fixing screws supplied in the fittings pack.
SCREW
WALL PLUG
SCREW (2 OFF)
FIXING JIG PLATE
SCREW
FIXING JIG WALL BRACKETS (2 OFF) (Handed as shown)
Diagram 6.3
0020008155A
18
7 Gas/Water & Appliance Connection
7.1 System Connection
The system can now be connected without the boiler being mounted. All water and gas connections are on the fixing jig with the exception of the condense drain and safety discharge, the positions of these are shown on the wall template.
The gas supply pipe must be chased into the wall if routed up the back of the boiler.
A Vertical Piping Kit can be used to route the central heating or DHW pipes, see section 1.6.
Make connections to fixing jig, gas, water and heating cocks with the tube assemblies supplied in fixing pack as shown in diagram 7.1.
7.2 Gas Connection
The gas supply can be connected from below or through the wall at the rear of the boiler, the position is shown on the wall template.
Refer also to section 1.2.
Fit the sealing washer into the securing nut and make good the final connection to the gas service cock on the wall mounting jig, see diagram 7.1.
Do not subject the gas service cock to heat.
Make sure the on/off lever is accessible.
The whole of the gas installation, including the meter, should be inspected, tested for soundness and purged in accordance with the current issue of BS6891 and in IE the current edition of I.S.813 "Domestic Gas Installations".
7.3 Water Connections
Flush out the heating system before connecting to the boiler, refer to section 4.6.
Make the connections to the heating system by fitting the sealing washers into the securing nuts and make good the final connection to the isolating valves on the fixing jig, see diagram
7.1.
Do not subject the isolation valves to heat.
Make sure the drain point is accessible, refer diagram 12.11.
7.4 Appliance Connection
IMPORTANT: With regards to the Manual Handling Operations,
1992 Regulations, the following lift operation exceeds the recommended weight for a one man lift, refer to manual handling on page 5.
The appliance will contain a small amount of water, place a water container beneath the boiler connections before removing the protective caps.
Position gasket/sealing washers supplied in the fittings pack, as shown in diagram 7.1.
Lifting the boiler into position, lean the top of the boiler slightly to the wall and position just above the hanging bracket. Lower the boiler slowly and engage onto the hanging bracket.
Pivot the boiler to engage the fixing jig connections, ensuring that the previously positioned washers /gaskets are not disturbed, see diagram 7.1.
Make good the final connections.
A
12350
C
A
12348
Diagram 7.1
19 0020008155A
8 Safety Discharge Valve and Condensate Connections
8.1 Safety Discharge Valve
The pipe from the safety discharge valve must not discharge above an entrance, window or any type of public access area.
A short discharge tube is supplied loose in the wall mounting pack. This must be extended, using not less than 15mm o.d. pipe, to discharge, in a visible position, outside the building, facing downwards, preferably over a drain, see diagram 8.1.
The pipe must have a continuous fall and be routed to a position so that any discharge of water, possibly boiling, or steam, cannot create any danger to persons, damage to property or external electrical components and wiring.
To ease future servicing it is advisable to use a compression type fitting to extend the discharge pipe.
8.2 Condensate Drain Connection
The condensate drain connection is behind the pump at the rear of the boiler, see diagram 8.2. 21.5mm plastic overflow pipe should be used to fit into the drain connection on the condensate siphon and discharge condensate to a drain. The drain pipe should have a fall of at least 2.5
Condensate should, if possible be discharged into the household internal drainage system. If this is not practicable, discharge can be allowed into the external household drains or a purpose designed soak-away.
It is recommended that any external condensate drain pipe is insulated or of a 32mm diameter, to prevent freezing in adverse weather conditions.
The condensate is discharged periodically in ‘slugs’ by siphonic action.
It is not necessary to provide air breaks or extra traps in the discharge pipe as there is already a trap inside the boiler. Fitting an extra trap may cause the boiler siphon to work incorrectly.
Refer to BS5546 or BS6798 for advice on the disposal of boiler condensate.
A range of condensate fittings are available. These cost effective easy to install condensate fittings, when used, are designed to help installers with the easy removal of condensate.
The fittings are available from Hepworth Plumbing Products and normal distribution channels.
o
away from the boiler.
SAFETY DISCHARGE VALVE
UNION NUT Tighten half turn past finger tight
SAFETY DISCHARGE VALVE PIPE
CONDENSATE DRAIN
11694
Diagram 8.1
11504
SPIGOT
CONDENSATE FITTINGS
Description Nom Dia. mm.
Overflow to Waste Adaptor (A021). 21.5
For connection to 32mm. or 40mm Push - Fit or Solvent Weld pipe.
Overflow to Rainwater 21.5 Adaptor (A022).
For connection to round and square section downpipe.
Overflow to Soil 32 or 21.5 Adaptor (S117).
For connection to 110mm soil pipe.
Overflow to Soil 40 or 21.5 Adaptor (S118).
For connection to 110mm soil pipe.
Conensate Soakaway (S951). 21.5
0020008155A
CAP
Diagram 8.2
20
8 Safety Discharge Valve and Condensate Connections
Typical Gravity Draining Condensate Installations
INTERNAL SOIL AND VENT STACK
MIN. DIA. 21MM NO RESTRICTION ON LENGTH
Internal Soil and Vent Pipe
EXTERNAL LENGTH OF PIPE 3M MAX.
OPEN END OF PIPE DIRECT INTO GULLEY BELOW GROUND BUT ABOVE WATER LEVEL
*
MIN. DIA. 21MM
BOILER
BOILER
*NOTE: FOR EXTENDED PIPE RUNS 32MM DIA. PIPE SHOULD BE USED.
EXTERNAL SOIL AND VENT STACK
EXTERNAL MAX. 3M
MIN. DIA. 21MM NO RESTRICTION ON LENGTH
BOILER
External Soil and Vent Pipe or Rainwater Pipe
SINK (CONSTITUTES AIR BREAK)
MIN. DIA. 21MM NO RESTRICTION ON LENGTH
BOILER
12333
Internal Termination into Combined Sink WasteExternal Termination to a Gulley or Hopper
21MM TERMINATION FROM APPLIANCE *NOTE: FOR EXTENDED PIPE RUNS 32MM DIA. PIPE SHOULD BE USED.
MIN. DIA. 21MM NO RESTRICTION ON LENGTH
BOILER
OPEN END OF PIPE DIRECT INTO GULLEY BELOW GROUND LEVEL BUT ABOVE WATER LEVEL.
SINK
Internal Termination Downstream of Sink Waste
CEMENT MORTAR SEALING
100MM PLASTIC TUBE
BOTTOM OF TUBE SEALED
HOLE DEPTH 400MM
2 ROWS OF 3 x 12MM HOLES AT 25MM CENTRES 50MM FROM BOTTOM OF TUBE. HOLES TO FACE AWAY FROM HOUSE.
External Termination into Soakaway
NOTE: PIPEWORK SHOULD ALWAYS FALL AWAY FROM BOILER BY AT LEAST 2.5 44mm FOR EVERY 1M.
o
2.5 FALL
25MM
300MM
0
Diagram 8.3
21 0020008155A
9 Flue Preparation Telescopic and Standard Flue
9.1 Flue Components
The components supplied in the Standard and Telescopic kit are shown in diagram 9.1.
Top Outlet Horizontal Concentric Flue Packs: A2043600 Horizontal telescopic flue pack. A2043400 Standard horizontal flue pack.
SEALING TAPE (telescopic only)
SCREW x 2
Additional flue accessories are available to suit your site conditions, see diagram 9.2.
The Glow-worm Flue Options Guide, available on request or through the web site, describes in detail the necessary accessories.
FLUE
SECURING COLLAR
SEALING COLLAR
ELBOW
SCREW x 2
SCREW x 4
GASKET (fitted)
12841
SEALING COLLAR
0.5m
EXTENSION
2000460481
SCREW x 1
TELESCOPIC TERMINAL ASSEMBLY
45o Bend
2000460485
(2off)
STANDARD TERMINAL ASSEMBLY
o
90
Bend
2000460484
Diagram 9.1
12842
0020008155A
1m
EXTENSION
2000460482
2m
EXTENSION
2000460483
VERTICAL
FLUE
ADAPTOR
A2024600
Diagram 9.2
22
9 Flue Preparation Telescopic and Standard Flue
9.2 Flue Length
Top Rear flue - Telescopic - with the flue elbow temporarily
fitted, measure the distance from the outside wall to the butt joint, see diagram 9.4. If the measurement 'Y' exceeds 525mm, then the appropriate length of extension pipe is required, if the dimension is less than 320mm DO NOT cut the flue, it can project to a maximum of 600mm, if this is not desirable then a Standard flue MUST be used and cut to length.
Top Rear flue - Standard - with the flue elbow temporarily fitted, measure the distance from the outside wall to the butt joint, see diagram 9.3. If the measurement 'Y' exceeds 652mm, then the appropriate length of extension pipe is required. The minimum dimension is 187mm to suit a 75mm min wall thickness.
Top Side flue - Telescopic - with the flue elbow temporarily fitted, measure the distance from the outside wall to the butt joint, see diagram 9.6. If the measurement 'Y' exceeds 525mm, then the appropriate length of extension pipe is required, if the dimension is less than 320mm DO NOT cut the flue, it can project to a maximum of 600mm, if this is not desirable then a Standard flue MUST be used and cut to length.
Y
WALL THICKNESS
112
Top Side flue - Standard - with the flue elbow temporarily fitted, measure the distance from the outside wall to the butt joint, see diagram 9.5. If the measurement 'Y' exceeds 652mm, then the appropriate length of extension pipe is required. The minimum dimension for Lhd is 270 and Rhd 242 to suit a minimum wall thickness of 75mm.
Y
OUTER RUBBER COLLAR
FLUE DUCT
AIR DUCT
COLLAR
12658
12843
DRILL AND SCREW
OUTSIDE WALL FACE
BOILER MOUNTING WALL
TOP REAR FLUE - STANDARD
Y
WALL THICKNESS
COLLAR
112
DRILL AND SCREW
Diagram 9.3
DRILL AND SCREW
12850
OUTSIDE WALL FACE
INNER PLASTIC COLLAR
TOP SIDE FLUE - STANDARD
Y
OUTER RUBBER COLLAR
FLUE DUCT
AIR DUCT
C
L
FLUE
Diagram 9.5
COLLAR
DRILL AND SCREW
12851
OUTSIDE WALL FACE
BOILER MOUNTING WALL
DRILL AND SCREW
TOP REAR FLUE - TELESCOPIC
COLLAR
Diagram 9.4
OUTSIDE WALL FACE
INNER PLASTIC COLLAR
TOP SIDE FLUE - TELESCOPIC
C
L
FLUE
Diagram 9.6
23 0020008155A
9 Flue Preparation Telescopic and Standard Flue
9.2 (cont'd) Flue and Air Ducts
Telescopic:
The Telescopic Flue system MUST NOT be cut.
Adjust the flue to your required length "Y", mark the securing hole position in the air duct. Drill a 3mm diameter hole at this position, take care not to pierce the inner flue duct. Secure with screw provided and tape the joint, see diagram 9.7.
Standard:
Separate the flue duct from the terminal by twisting to release the terminal catch, then pull out of the retaining seal, refer to diagram 9.8.
The duct cutting lengths are shown in diagram 9.8.
The air duct should be cut at the opposite end to the terminal fixing.
The terminal plastic duct MUST be cut at the opposite end to the catch.
The plastic flue duct extensions MUST be cut at the opposite end to seal.
The cut ducts must be de-burred and all filings and debris removed.
NOTE: If you require to lubricate the seals to ease installation, please do not use a mineral oil based grease, we would recommend the use of water.
AIR DUCT - TELESCOPIC
TOP TELESCOPIC AIR DUCT SECURING
12852
Diagram 9.7
L
12847
9.3 Flue Assembly
The flue assembly is a push fit design with securing collars.
Having adjusted the telescopic or cut the air and flue ducts as described in section 9.2
Assemble the flue elbow to the air duct, ensuring the correct alignment of the terminal. Fit the collar into position, mark through two of the pre drilled holes in the collar. Remove collar and drill two 3mm diameter holes in the elbow, take care not to pierce the inner flue duct.
Insert the terminal flue duct, remembering to engage the catch within the terminal, check for alignment.
Fit the rubber sealing collar behind the locating lugs on the flue terminal, see diagram 9.1.
Push the flue assembly into the wall, externally or internally, initially until the end of the assembly protrudes a short way from the inside face of the wall. This will enable the internal trim ring(if required) to be positioned and allow the flue duct to be drawn back into the flue elbow after the boiler has been mounted.
9.4 Flue Attachment To Boiler
Secure the flue elbow in position on top of the boiler with four torque headed screws supplied.
Draw the flue assembly from wall and engage the flue duct into the elbow and butt fit the air duct, then fit the collar and secure with screws provided, see diagram 9.9.
NOTE: If the air and flue ducts have been correctly cut to the instructions given in section 9.2, the rubber sealing collar should fit flush with the outside wall, check this.
Slide the internal trim ring back against the wall, securing in place with a small amount of sealant if required.
AIR DUCT
L
13mm
TERMINAL CATCH
FLUE DUCT
L + 11mm
DUCT CUTTING LENGTHS
12846
Diagram 9.8
0020008155A
Diagram 9.9
24
10 Electrical Connections
WARNING: This appliance must be wired in accordance with
these instructions. Any fault arising from incorrect wiring cannot be put right under the terms of the Glow-worm guarantee.
All system components must be of an approved type.
Electrical components have been tested to meet the equivalent requirements of the BEAB.
Connection of the whole electrical system and any heating system controls to the electrical supply must be through a common isolator.
Isolation should preferably be by a double pole switched fused spur box having a minimum contact separation of 3mm on each pole. The fused spur box should be readily accessible and preferably adjacent to the boiler. It should be identified as to its use.
A fused three pin plug and shuttered socket outlet may be used instead of a fused spur box provided that:
a) They are not used in a room containing a fixed bath or shower.
b) Both the plug and socket comply with the current issue of BS1363.
The mains electrical supply must be maintained at all times in order to provide domestic hot water.
Do not interrupt the mains supply with a time switch or programmer.
WARNING: UNDER NO CIRCUMSTANCES MUST ANY MAINS VOLTAGE BE APPLIED TO ANY OF THE TERMINALS ON THE VOLTAGE FREE HEATING CONTROLS CONNECTION PLUG.
RETAINING LATCHES
CONTROLS FASCIA
EXTERNAL CONTROLS CABLE (MAINS VOLTAGE)
11408
11505
Diagram 10.1
10.1 Mains Cable
IMPORTANT: If a replacement supply cable is required it must
be purchased. Part No. S1008600.
10.2 External controls (Mains Voltage)
Gain access to the 230V interface by unclipping the controls fascia and hinging forward, see diagram 10.1.
Remove the red link from the mains voltage heating controls connection plug and connect as shown in diagrams 10.2 & 10.3, then route the external control cable as shown on diagram 10.2.
Close the fascia panel and open the rear cover of control panel, see diagram 10.4.
Secure the external control cable in the strain relief, see diagram 10.4.
Thread the external control cable through rear of the control panel where the other cables exit, see diagram 10.4.
Close rear cover of control panel.
External control should be fitted in accordance with the rules in force.
Refer to wiring diagram in Section 13.
PLUG
Diagram 10.2
25 0020008155A
10 Electrical Connections
10.4 Electrical Connections - Testing
Carry out preliminary electrical system checks as below:
1. Test insulation resistance to earth of mains cables.
2. Test the earth continuity and short circuit of cables.
3. Test the polarity of the mains.
9808
11627
CONTROL PANEL REAR COVER
STRAIN RELIEF
CABLE EXIT
SECURING SCREW (3)
12406
MAINS CABLE
EXTERNAL CONTROL CABLE
Diagram 10.3
Diagram 10.4
0020008155A
26
11 Commissioning
Please ensure the "Benchmark" logbook is completed and left with the user and the magnetic lighting instruction label is placed on the surface of the boiler casing.
LPG CONVERSION - 30sxi only
NOTE: Steps 11.1 to 11.3 will need to be completed before the
appliance can be converted.
The 30sxi can be converted to run on LPG-Propane (G31).
This conversion should only be carried out by a competent
person.
During the conversion to Propane use of a suitable flue gas analyser is necessary.
As an option a chargeable boiler only commissioning service can be provided by Glow-worm Service by calling telephone No. 01773 828100.
Tools required to make the conversion are a 2mm Allen key and an electricians screwdriver.
Ensure that the appliance supply pressure = 37mb.
(1) Access the gas valve.
(2) Refer to diagram 11.3 and turn the gas valve throttle fully
clockwise.
1
(3) Turn the throttle back anti-clockwise by 5
(4) Ensure that the gas analyser is set to the correct fuel
setting - Propane.
(5) Attach combustion analyser to the combustion test point.
See diagram 12.1.
(6) Unclip the controls fascia to reveal the service potentiometer
on the rear of the user interface. See diagram 12.7.
(7) Turn on the mains electrical supply and turn on the gas
service cock. Switch the boiler on.
(8) Ensure external controls are calling for heat. The boiler
should fire automatically.
(9) Using an electrical screwdriver, rotate the service
potentiometer to the mid point or 3 o’clock position. See diagram 12.7. The fan speed should now reduce to minimum and ‘12’ should be shown flashing on the digital display. Check the CO and using a 2mm allen key carefully adjust the offset screw until a CO the offset screw clockwise increases the CO2 reading.
(10) After setting combustion, rotate the service
potentiometer fully anti-clockwise so that the display indicates the water temperature. Check that the CO combustion remains between 9.8% and 10.8% CO2. Further adjustment should not be necessary, however if required, carefully adjust the gas valve throttle (see diagram 11.3) until this is achieved.
(11) Remove analyser probe from the test point and replace the
cap. Refit the control panel.
(12) Fit the LPG conversion label supplied in the documentation
pack to the inner front panel alongside the data label. Refit the inner door and outer door.
value. If necessary refer to diagram 11.3
2
reading of 10.5% ± 0.2% is achieved. Turning
2
/2 turns.
2
INNER CASING
CASING
PANEL
PANEL
SECURING
SECURING SCREWS
SCREW (2)
Diagram 11.1
AUTOMATIC
11507
CAP
AIR VENT
PUMP
Diagram 11.2
11.1 Preliminaries
A competent person in accordance with the current issue of BS6798 should carry out commissioning.
NOTE: Remove the inner casing panel, see diagram 11.1.
Make sure that the system has been thoroughly flushed out with cold water without the pump in place.
Refit the pump, fill the system with water, making sure that all the air is properly vented from the system and pump, see diagram 11.2.
Before operating the boiler check that all external controls are calling for heat.
12353
27 0020008155A
11 Commissioning
11.2 System Commissioning
Open the two central heating isolating valves, slots in line with the length of the valve, see diagram 7.1
To enable the system pressure to be viewed, turn the heating temperature knob to the OFF position .
Turn the mains electricity supply on to the appliance and ensure that the mains switch on the appliance fascia is set to the on position.
The system pressure should be viewed on the digital display on the front of the appliance, see diagram 1 of the Users Instructions.
Pressurise the system until the pressure on the display reads at least 1.0bar.
Make sure that the automatic air vent works correctly and that the black cap is loosely fitted to allow air to escape, see diagram
11.2
Check the heating system and boiler connections for water soundness.
11.3 Preparation for Lighting
Isolate the boiler from the mains electrical supply.
Test for gas soundness and purge air from the gas supply. Turn on the gas isolation valve, slot in line with the length of the valve, see diagram 7.1.
11.4 Initial Lighting
The lighting procedure of the boiler is fully automated.
Ensure that the central heating water temperature control knob is turned OFF.
Turn on the mains electrical supply and the mains reset knob to (I) on the controls fascia.
The digital display will show system pressure.
Turn the central heating water temperature control knob to (I) MINIMUM.
The digital display will now show water temperature.
The fan should start and after a few seconds the ignition will commence
If the burner fails to light the fan will stop. Initially this may be due to air in the gas supply line. The boiler will automatically have three attempts at ignition.
If necessary turn the reset switch to the off position (O), then back to the on position (I) and the boiler will restart.
After the boiler has lit, allow to warm at minimum temperature setting to purge any air from the system.
NOTE: If the appliance is operated above MINIMUM on initial lighting, there is a possibility that the overheat thermostat will trip and "F5" will be displayed on controls fascia, this is due to air not having been completely purged. See diagram 14.15 for reset switch.
Once the system has been purged of air, turn the central heating water temperature control knob to the desired temperature.
The appliance will then continue to fire until the user controls are satisfied.
NOTE: That after first power up the firing sequence changes. After one minute stabilisation time the boiler will ramp slowly to full rate rather than going immediately to full rate. This is an adaptive feature to cope with small system requirements.
OFFSET ADJUSTMENT
12402
GAS VALVE
THROTTLE
ELECTRICAL PLUG
PRESSURE TEST POINT
Diagram 11.3
11.5 Testing - Gas
Case Off Case On
Burner CO2 (G20) 9.1+0.2-0.5 9.3+0.3-0.5 Burner CO2 Propane (G31) 10.5+0.3-0.7 10.7+0.3-0.8 Should any doubt exist about the gas rate, check it using the gas meter test dial and stop watch at least 10 minutes after the burner has lit, making sure that all other gas burning appliances and pilot lights are off.
3
The approximate gas rate: 18sxi : 2.0m
30sxi : 3.0m
NOTE: (LPG (G31) should be adjusted as described on the
previous page. (It should be checked that the supply pressure is 37mb for LPG appliances).
The gas valve is factory set and should need no adjustment. It should be checked that the supply pressure is 20mb when the boiler is firing at full rate. This can be achieved by checking the inlet pressure at the pressure test point on the gas valve shown in diagram 11.3.
Disconnect pressure gauge.
NOTE: That the burner pressure cannot be measured at the gas valve as it is altered by the suction of the fan and modulated according to demand.
Replace inner casing panel and front casing panel, see diagram
11.1.
/h (71 ft3/h)
3
/h (107 ft3/h)
0020008155A
28
11 Commissioning
11.6 Testing - Heating System
Check that all remote controls are calling for heat. The boiler will fire automatically. Fully open all radiator valves and flow control valve ‘A’ if fitted, see diagram 4.1.
Balance the radiators as required and if fitted adjust valve ‘A’ to give the required system differential. Turn off all radiators that can be shut off by the user and check to see if less than the maximum differential allowed of 20 flow and return.
This boiler has a built in bypass, see diagram 11.4. and 14.17.
The boiler is supplied with the bypass open half a turn. It should not be necessary to adjust the bypass, but if required turn the adjustment screw clockwise to close the valve, see diagram
11.4.
Allow the system to reach maximum temperature then switch off the boiler by isolating from the electrical supply.
Drain the entire system rapidly whilst hot, using the drain tap at the lowest part of the system. Fill and vent the system as described previously in section 11.2.
Lock or remove the handle from control valve ‘A’ to prevent unauthorised adjustment.
o
C can be achieved across
AUTOMATIC BYPASS VALVE
BYPASS TUBE
9531
Diagram 11.4
11.7 Completion
Adjust the boiler temperature control and any system controls to their required settings. In addition it is necessary to complete the "Benchmark" logbook.
11 Commissioning - Instructions to the User
11.8 User Controls and Options
The mains / reset switch is used to restart the boiler after a fault condition has occurred, i.e. ignition failure.
The central heating water temperature control knob allows the user to set the desired temperature.
NOTE: If there is no demand the digital display shows the water pressure.
Temperature Display
The digital display normally shows the operating temperature of the unit when there is a central heating demand.
11.9 Pump Exercise Program
After a power cut or every 24 hours in frost setting/summer mode the pump will run for one minute to prevent it from sticking. This will also occur during normal operating if there is no demand for more than 24 hours.
11.10 Frost Protection
The boiler has a built in frost protection programme as long as the electricity and gas are left switched on.
This device operates the burner and system pump when the temperature inside the boiler falls to 3
When the temperature inside the appliance reaches 10°C the burner will shut down and after a short period the pump will stop.
This device primarily protects the boiler. Any other exposed areas of the system should be protected by a separate frost
thermostat.
0
C.
For IE, it is necessary to complete a "Declaration of Conformity" to indicate compliance to I.S.813. An example of this is given in the current edition of I.S.813.
Testing Flue Gases: If any doubt exists that the flue products are not exhausting correctly, investigate by use of a gas analyser (FGA).
11.11 Instruct the User
Instruct and demonstrate the lighting procedure and advise the user on the safe and efficient operation of the boiler.
Instruct on and demonstrate the operation of any heating system controls.
Advise the user on the use and maintenance of any scale reducer and pass on any relevant instructional documents.
Advise that to ensure the continued efficient and safe operation of the boiler it is recommended that it is checked and serviced at regular intervals. The frequency of servicing will depend upon the installation conditions and usage, but in general, once a year should be enough.
Draw attention, if applicable, to the current issue of the Gas Safety (Installation and Use) Regulations, Section 35, which imposes a duty of care on all persons who let out any property containing a gas appliance in the UK.
The user shall not interfere with or adjust sealed components.
It is the Law that any servicing is carried out by a competent person.
Advise the user that, like all condensing boilers this appliance will produce a plume of condensation from the flue terminal in cool weather. This is due to the high efficiency and hence low flue gas temperature of the boiler.
Advise the user of the precautions necessary to prevent damage to the system, boiler and the building, in the event of the heating system being out of use during frost or freezing conditions.
Advise the user that the permanent mains electrical supply SHOULD NOT be switched off, as the built in frost protection and pump saver program would not be operable.
Reminder, leave these instructions and the ‘Benchmark’ logbook with the user.
29 0020008155A
12 Servicing
Important Notes
To ensure the continued efficient and safe operation of the boiler it is recommended that it is checked and serviced at regular intervals. The frequency of servicing will depend upon the particular installation and usage, but in general once a year should be enough.
It is the Law that any servicing is carried out by a competent person.
When replacing a part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not use reconditioned or copy parts that have not been clearly authorised by Glow-worm.
FLUE ELBOW
12853
12.1 General
Refer to Table 2 Section 1 Technical Information. Measurement of the products of combustion can be achieved by connection of a probe to the combustion analyser test point, see diagram
12.1.
IMPORTANT NOTE: Products of combustion will be discharged when the cap is removed. It is important to replace the cap immediately.
Before commencing with a service or replacement of parts the boiler should be isolated from the electrical supply and the gas supply should be turned off at the gas valve, see diagram 7.1.
All routine servicing requirements can be achieved by the removal of the front panel and inner panel only. To remove simply undo the two screws on the underside of the front panel and lift off, see diagram 11.1. Undo the two screws on the front of inner panel and lift off, see diagram 11.1.
Unless stated otherwise any part removed during servicing should be replaced in the reverse order to removal.
Servicing should always include the removal of any debris from the condensate pipe and siphon.
After completing any servicing of gas carrying components, ALWAYS test for gas soundness and carry out a functional test of the controls.
Testing Flue Gases: If any doubt exists that the flue products are not exhausting correctly, investigate by use of a gas analyser (FGA).
COMBUSTION ANALYSER TEST POINT
FLUE DUCT EXTENSION
SPARK ELECTRODE
SPARK GAP
3.5 to 4.5
Diagram 12.1
11410
12.2 Spark Electrode
Disconnect the electrode lead and two securing screws. Withdraw the spark electrode carefully from the combustion chamber, see diagram 12.2 and 12.5.
Inspect the tips for damage.
Clean away any debris and check the spark gap is
3.5mm to 4.5 mm.
Check the electrode gasket for signs of leakage and replace if necessary.
SECURING SCREW (2 OFF)
EARTH LEAD
GASKET
Diagram 12.2
0020008155A
30
12 Servicing
12.3 Burner
NOTE: IF THE BURNER HAS TO BE REMOVED IT WILL
REQUIRE A NEW GASKET WHEN REFITTED.
Drop down the control panel into the service position, see diagram 10.4.
Disconnect the gas supply at the gas service cock.
Remove the two gas pipe retaining clips, one located below gas valve and the other one located on the underside of the boiler chassis, see diagram 12.4.
Pull sealing grommet down gas pipe, see diagram 12.4.
Push the gas pipe upwards further into gas valve connection and then rotate anti-clockwise (looking down) until the gas pipe end is over the large hole in boiler chassis, see diagram 12.4.
Withdraw the gas pipe from gas valve connection and remove.
NOTE: When replacing ensure that the sealing grommet, situated below the gas valve is correctly re-seated.
Disconnect the gas control valve plug at the gas control valve.
Disconnect the electrical leads from the fan.
Remove the five combustion chamber front retaining nuts, see diagram 12.5.
Gently remove the fan, gas control valve and burner assembly from the combustion chamber, see diagram 12.3.
Clean the burner with a soft brush taking great care not to damage the front insulation. DO NOT use wire or sharp instruments to clean the holes of the burner.
Inspect the burner for any signs of damage.
Inspect the sealing rings and replace if necessary.
Removal of the burner is not necessary during a normal service.
12.4 Combustion Chamber and Heat Exchanger
Refer to diagram 12.3.
Remove loose debris from combustion chamber using a soft brush and vacuum cleaner. Carefully flush by spraying water any remaining debris through the condensate trap (Ensure the water is kept away from electrical components).
GAS PIPE RETAINING CLIP
GAS SUPPLY AT GAS SERVICE COCK
HEAT EXCHANGER
GAS VALVE
GAS PIPE RETAINING CLIP
SEALING GROMMET
GAS PIPE
Diagram 12.4
NUT (5 OFF)
SPADE CONNECTOR
12402
11480
11531
12343
SEALING RING
FAN
COMBUSTION CHAMBER
BURNER
GAS VALVE
Diagram 12.3
ELECTRODE LEAD
31 0020008155A
Diagram 12.5
12 Servicing
12.5 Condensate Drain
The condense drain does not normally need removing during servicing.
To flush the condense drain carefully pour water into the heat exchanger and check that water flows freely to drain.
If the condense drain is blocked refer to section 14.27 for removal.
12.6 Combustion Check
Once the appliance has been re-assembled (apart from the front and inner casing panels) connect a CO analyser to the test point on the flue elbow, see diagram 12.1.
IMPORTANT NOTE: Products of combustion will be discharged when the cap is removed. It is important to replace the cap immediately.
Turn on the gas service cock, see diagram 7.1.
With the power off and the appliance cold, unclip the controls fascia and hinge it down to reveal the potentiometers on the rear of the User interface, see diagram 12.7. Take care not to allow the fascia to drop down and damage the wiring.
Turn on the electrical supply.
Ensure external controls are calling for heat. The boiler should fire automatically.
Allow the boiler to fire for a minimum of 60 seconds and then, using an electrical screwdriver, rotate the service potentiometer fully clockwise. This will allow the digital display to indicate the ‘flashing’ fan speed on the appliance fascia.
In the fully clockwise position the display should be indicating the maximum fan speed of the appliance, 57±1 for 30sxi and 41±1 for 18sxi.
Check the CO
18sxi 30sxi 9.1+0.2-0.5 Case Off
30sxi LPG 10.5+0.3-0.7 Case Off
Note that with the inner case front panel fitted the combustion readings will increase slightly to:
18sxi 30sxi 9.1+0.3-0.5 Case On
30sxi LPG 10.7+0.3-0.7 Case On
If adjustment proves necessary then proceed as follows.
For LPG appliances refer to the begining of commissioning
LPG CONVERSION - 30sxi only.
Any adjustment to the gas valve should only be carried out by a competent person.
Refer to diagram 12.6.
Adjust the maximum rate CO
9.1+0.2-0.5 in small incrimental adjustments, then wait for the analyser to reflect the change before continuing to 9.1+0.2-0.5 (anti-clockwise to increase).
Rotate the service potentiometer fully anti-clockwise. Hold it in this position for about 5 seconds before rotating the service potentiometer clockwise to the mid-point or 3 o’clock position. The fan should reduce to 1200 ±100 rpm which will flash ‘12’ on the digital display.
Check the CO
If adjustment proves necessary then proceed as follows.
Adjustment of the CO2 at minimum rate is very coarse so carefully adjust the CO
9.1+0.2-0.5, see diagram 12.6.
Rotate the service potentiometer fully clockwise and recheck the maximum rate combustion, which should be
9.1+0.2-0.5 ± 0.2%.
value, which should be:
2
by rotating the throttle to
2
value, which should be 9.1+0.2-0.5.
2
with the offset adjustment to
2
combustion
2
After checking combustion rotate the service potentiometer fully anti-clockwise so that the display indicates the water temperature.
Replace the cap on the test point and refit the control cover rear panel.
OFFSET ADJUSTMENT
THROTTLE
Diagram 12.6
RETAINING LATCHES
CONTROLS
USER INTERFACE
FASCIA
MIN. SERVICE POTENTIOMETER
MAX.
POTENTIOMETERS
Diagram 12.7
12402
11505
11417
0020008155A
32
12 Servicing
12.7 Central Heating Return Filter
Turn off the electrical supply to the boiler.
Refer to section12.8 and drain the heating circuit of the boiler.
Remove the filter retaining clip and clean filter or renew if necessary, see diagram 12.10.
Refit the filter, ensuring the correct orientation. The flat and hole in the filter positioned as shown in diagram 12.10. Secure with retaining clip.
Open the heating flow and return isolating valves and refill, vent and pressurise the heating circuit. See section 11.2.
Check for leaks.
12.8 Draining of Boiler Heating Circuit
Drain down the Heating Circuit only, by closing the heating flow and return isolating valves on the wall mounting jig, see diagram
7.1.
Attach a length of hose to the drain point and open the drain valve, see diagram 12.11.
After servicing or replacing parts, close the drain valve and remove the hose. Open the heating flow and return isolating valves and refill, vent and pressurise the heating circuit. See section 11.2.
Check for leaks.
RETAINING CLIP
HOUSING
FIXING JIG
CENTRAL HEATING RETURN FILTER
GAS SERVICE COCK
FLAT AND HOLE
Diagram 12.10
DRAIN POINT
9184
11533
12.9 Inner Casing Panel Seal Check
Check the condition of the seal, replace as required.
To replace remove the old seal, thoroughly clean the casing sufaces. Fit the new seal, it is supplied to the correct length, see diagram 12.12.
FRONT CASING PANEL
DRAIN VALVE
MOUNTING JIG
Diagram 12.11
10063
INNER CASING PANEL
SEAL
Diagram 12.12
33 0020008155A
13 Fault Finding
NOTE:
Before trying to operate the boiler make sure that :
• All gas supply cocks are open and that the gas supply has been purged of air.
• There is a permanent mains supply to the boiler.
• There is a heating demand from the external controls.
WARNING:
Always isolate the boiler from the electrical supply before carrying out any electrical replacement work.
Always check for gas soundness after any service work.
Electrical Testing
Should there be any doubt about the voltage supply to any of the components, it is possible to carry out a simple electrical test.
IMPORTANT: On completion of the Service/Fault Finding tasks which have required the breaking and remaking of the electrical connections the earth continuity, polarity, short circuit and resistance to earth checks must be repeated using a suitable multimeter.
To carry out the electrical test, gain access, as follows:
Hinge down the control box and remove Torx screws and unhook the rear panel, refer diagram 13.1.
Refer to the Wiring diagram 13.2 and fault finding charts diagrams 13.3 and 13.4.
RETAINING SLOTS
RETAINING CORD
TORX SCREWS (3)
REAR PANEL
9808
CONTROL BOX
Diagram 13.1
0020008155A
34
13 Fault Finding
12454
Diagram 13.2
35 0020008155A
13 Fault Finding
12189
Does ’F’ flash?
YES
YES
REFER TO DIAGRAM 13.4.
0020008155A
Diagram 13.3
36
13 Fault Finding
12355
Diagram 13.4
37 0020008155A
14 Replacement of Parts
14.1 Important Notes
When replacing a part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not use reconditioned or copy parts that have not been clearly authorised by Glow-worm.
Replacement of parts must be carried out by a competent person.
Before replacing any parts the boiler should be isolated from the mains electric supply and the gas should be turned off at the service cock on the boiler, see diagram 7.1.
Unless stated otherwise parts are replaced in the reverse order to removal.
After replacing any parts always test for gas soundness and if necessary carry out functional test of the controls.
For replacement of parts the front casing and the inner casing panel of the boiler will need to be removed. To remove undo the two screws on the underside of the front casing and lift off. Undo the two screws on the front of the inner front panel and lift off.
The side panels can be hinged sideways to aid replacement of parts.
Undo and remove the three screws securing each side panel to the boiler, two at the front and one at the top.
SECURING SCREWS (2)
ELECTRICAL CONNECTIONS
11492
IGNITER UNIT
SPADE CONNECTOR
IGNITION LEAD
Diagram 14.1
14.2 Spark Electrode
For access, refer to section 14.1.
Remove the spark plug lead, earth lead and two securing screws. Withdraw the spark electrode carefully from the combustion chamber, see diagram 12.2.
14.3 Igniter Unit
For access, refer to section 14.1.
Remove ignition lead and electrical connections, then remove igniter unit by removing two securing screws, see diagram 14.1.
14.4 Ignition Lead
For access, refer to section 14.1.
Refer to diagram 12.5.
Pull the spark plug style connector off the spark electrode and the spade connector connected to the igniter unit, see diagram
14.1.
0020008155A
38
14 Replacement of Parts
14.5 Gas Valve
For access, refer to section 14.1.
Remove the electrical plug from the gas valve, see diagram
14.2.
Refer to section 12.3 for removal of the fan, gas valve and burner assembly.
Before removing the gas valve note its position on the fan.
Remove the three securing screws, which fix the gas valve, plastic swirl plate to the venturi on the fan.
Remove the gas valve.
Remove the flexible gas supply pipe from the gas valve.
When refitting the gas valve take care as it can be fitted more than one way.
After assembly test for gas soundness and purge in accordance with the current issue of BS6891 or in IE, the current edition of I.S.813 "Domestic Gas Installations".
14.6 Fan
For access, refer to section 14.1.
Refer to section 12.3 for removal of the fan gas valve and burner assembly.
Remove the gas valve as described in the relevant parts of section 14.5.
Remove the venturi plate secured with four screws and remove the two screws securing the fan to the gas manifold, see diagram 14.3.
Check the gasket and replace if necessary.
NOTE: The 30sxi fan is secured through an extension piece with two securing screws, check and replace any seals or gaskets if necessary.
11486
VENTURI PLATE
SECURING SCREW (3)
Diagram 14.3
11485
GAS MANIFOLD
SECURING SCREW (2)
14.7 Burner
NOTE: THE BURNER WILL REQUIRE A NEW GASKET
WHEN REFITTED.
For access, refer to section 14.1.
Refer to section 12.3 for removal of the fan, gas valve and burner assembly.
Remove the four screws that secure the burner, see diagram
14.5.
GAS VALVE
ELECTRICAL PLUG
12402
FAN
BURNER
Diagram 14.4
11487
INSULATION
PRESSURE TEST POINT
Diagram 14.2
SECURING SCREW (4)
39 0020008155A
Diagram 14.5
14 Replacement of Parts
14.8 Front Insulation
For access, refer to section 14.1.
Refer to section 12.3 for removal of the fan, gas valve and burner assembly.
Remove burner as described in section 14.7.
Remove spark electrode, see section 14.2.
NOTE: THE BURNER WILL REQUIRE A NEW GASKET WHEN REFITTED.
14.9 Rear Insulation
For access, refer to section 14.1.
Refer to section 12.3 for removal of the fan, gas valve and burner assembly.
Remove securing screw and washer in the centre of the insulation and withdraw insulation, see diagram 14.6.
SECURING SCREW
WASHER
14.10 Viewing Window
For access, refer to section 14.1.
Refer to diagram 14.7.
Remove circlip.
Remove steel washer.
Remove glass.
Remove fibre washer.
Replace in reverse order.
SECURING
11412
BOLT
UPPER SUPPORT BRACKET
11488
CIRCLIP
STEEL WASHER
HEAT EXCHANGER
FIBRE WASHER
REAR INSULATION
Diagram 14.6
GLASS
Diagram 14.7
11413
EXPANSION VESSEL
11489
COUPLING
Diagram 14.8
0020008155A
40
14 Replacement of Parts
14.11 Expansion Vessel
For access, refer to section 14.1.
Refer to section 12.8 and drain the boiler heating circuit.
Undo the coupling at the base of the vessel, see diagram 14.8.
While holding the vessel remove the securing bolt on the top panel of the boiler and upper support bracket on top of the expansion vessel.
Lift the vessel up, draw bottom out to the left, lower and remove.
Fit the replacement unit.
Refill, vent and pressurise the boiler.
Check for leaks.
14.12 Heat Exchanger
For access, refer to section 14.1.
Refer to section 12.3 for removal of the fan, gas valve and burner assembly.
Drain the boiler heating circuit, see section 12.8.
Remove the clip securing the clear condense pipe to heat exchanger.
Pull to remove the condense pipe out of the bottom of the heat exchanger.
Undo the two nuts of the flow and return pipes from the heat exchanger.
Move the pipes away from the heat exchanger.
Loosen the three heat exchanger securing screws and clamps (two at the top and one at the bottom) to remove the heat exchanger, see diagram 14.9.
CAUTION: There will be water in the heat exchanger.
Remove condense pipe connector from bottom of heat exchanger.
Carefully ease heat exchanger out.
11490
FLOW AND RETURN PIPE NUTS
FLUE HOOD
SECURING SCREWS AND CLAMPS
Diagram 14.9
11602
14.13 Flue Hood
For access, refer to section 14.1.
Refer to diagram 14.10.
Remove heat exchanger as per section 14.12.
Remove the two securing screws and pull the flue hood down and away from the flue hood bracket and flue elbow, see diagram 14.10.
14.14 Pump (head only)
For access, refer to section 14.1.
Refer to section 12.8 and drain the boiler heating circuit.
Refer to diagram 14.11.
Remove the four cap head screws.
Carefully remove the pump head together with cable, do not strain cable.
Support the pump head, unscrew cable cover at the side of pump head and remove.
Disconnect wiring from pump head.
Reconnect wiring to new pump head and fit cover.
Fit the new pump head with ‘O’ ring.
Refill, vent and pressurise the boiler.
Check for leaks.
SECURING SCREWS
Diagram 14.10
41 0020008155A
14 Replacement of Parts
14.15 Safety Discharge Valve
For access, refer to section 14.1.
Refer to section 12.8 and drain the boiler heating circuit.
Refer to diagram 14.12.
Undo the safety discharge valve union and remove from the pipework.
Remove the securing clip and withdraw the safety discharge valve.
Refill, vent and pressurise the boiler.
Check for leaks.
14.16 Heating Flow Thermistor
For access, refer to section 14.1.
Refer to diagram 14.13.
Remove the electrical connections from the thermistor.
Remove the retaining clip from the flow pipe.
Remove the thermistor from the retaining clip.
Note that the polarity of the wiring to thermistors is unimportant.
14.17 Heating Return Thermistor
For access, refer to section 14.1.
Refer to diagram 14.15.
Remove the electrical connections from the thermistor.
Remove the retaining clip from the return pipe.
Remove the thermistor from the retaining clip.
Note that the polarity of the wiring to thermistor is unimportant.
14.18 Overheat Thermostat
For access, refer to section 14.1.
Refer to diagram 14.13.
Remove the electrical connections from the overheat stat.
Remove the retaining clip from the return pipe.
Remove the overheat stat from the retaining clip.
Ensure that the replacement thermostat is correctly located on the flat on the return pipe and carefully push the thermistor clip into place.
SAFETY DISCHARGE VALVE
FLOW PIPE
OVERHEAT THERMOSTAT
RETURN PIPE
11694
Diagram 14.12
11503
CAP HEAD SCREW (4)
0020008155A
PUMP HEAD
OUTLET CONNECTOR
CABLE COVER
Diagram 14.11
11507
42
RESET SWITCH
FLOW THERMISTOR
RETURN THERMISTOR
Diagram 14.13
14 Replacement of Parts
14.19 Automatic Air Vent
For access, refer to section 14.1.
Refer to section 12.8 and drain the boiler heating circuit.
Refer to diagram 14.14.
Unscrew the automatic air vent.
Fit the new automatic air vent and ‘O’ ring ensuring the vent cap is left loose.
Refill, vent and pressurise the boiler.
Check for leaks.
14.20 Low Water Pressure Sensor
For access, refer to section 14.1.
Refer to section 12.8 and drain the boiler heating circuit.
Refer to diagram 14.15.
Disconnect the electrical lead by pushing up retaining tab and withdraw lead plug.
Remove the retaining clip to remove the low water pressure sensor.
Fit the new low water pressure sensor. Refill vent and pressurise the boiler.
Check for leaks.
14.21 Bypass Tube
For access, refer to section 14.1.
Refer to section 12.8 and drain the boiler heating circuit.
Refer to diagram 14.15.
Remove the retaining clips to remove the bypass tube.
Replace the bypass tube, refill, vent and pressurise the boiler.
Check for leaks.
14.22 Automatic Bypass Valve
For access, refer to section 14.1.
Refer to section 12.8 and drain the boiler heating circuit.
Refer to diagram 14.15.
Remove the retaining clip to remove the bypass valve.
Replace the reduced pressure zone valve, refill, vent and pressurise the boiler.
Check for leaks.
14.23 Central Heating Filter
Refer to section 12.7.
AUTOMATIC AIR VENT
11507
FLOW PIPE CONNECTOR
AUTOMATIC BYPASS VALVE
Diagram 14.14
ELECTRICAL LEAD AND PLUG
LOW WATER PRESSURE SENSOR
BYPASS TUBE
Diagram 14.15
11605
43 0020008155A
14 Replacement of Parts
14.24 Heating Circuit Drain Point
Refer to section 12.8 to drain the boiler heating circuit.
Refer to diagram 14.16.
Remove the retaining clip to remove the drain point.
Replace the draining point, refill, vent and pressurise the boiler.
Check for leaks.
14.25 Inner Casing Panel Seal
For access, refer to section 14.1.
Refer to diagram 14.17.
Remove the inner casing panel.
To replace remove the old seal, thoroughly clean the casing surfaces. Fit the new seal, it is supplied to the correct length.
Refit the inner casing panel.
NOTE: Ensure the seal is fitted correctly giving an airtight joint.
RETAINING CLIP
DRAIN POINT
11533
14.26 Condense Drain
Refer to diagram 14.18.
Remove the clips securing the flexible tubes to the siphon adapter by twisting the clips slightly to disengage the clip jaws from each other.
Remove black flexible tubes from siphon adapter.
Lift off the siphon adapter.
Remove the drain connection downstream of the condense trap.
Remove the two condense trap securing screws. Lift up and carefully remove the condense trap taking care not to spill any water which may be left in the unit. As the unit is lifted remove the flexible pipe on the outlet.
Remove the cap at the base of the condense trap.
Remove any solids found.
Remove the float to clean it.
Flush water through the trap to remove any remaining solids.
Check for any debris in the outlet pipe of the condensate drain and clean as necessary.
Reassemble and refit the condense trap.
When refitting the cap ensure that a watertight seal is achieved, but do not use excessive force.
Remove the siphon adaptor from the flexible tubes, using a suitable container, flush the heat exchanger until the water appears clear in the container.
FRONT CASING PANEL
SIPHON ADAPTER
FLOAT
Diagram 14.16
10063
INNER CASING PANEL
SEAL
Diagram 14.17
9948
0020008155A
44
CAP
SEAL
CONDENSE TRAP
SCREW
Diagram 14.18
14 Replacement of Parts
14.27 Hydroblock Assembly Left-Hand
Refer to section 12.8 to drain the boiler heating circuit.
Refer to diagram 14.15.
Undo the connector on the bottom of the flow pipe from the hydroblock.
Undo the nut connecting flow pipe to heat exchanger.
Lift the flow pipe up out of the way.
Remove the bypass tube, refer to section 14.20.
Undo the safety discharge valve union and remove the pipework.
Remove the securing clip and withdraw the safety discharge valve, refer to section 14.15.
Remove securing clip 1 below hydroblock, see diagram 14.19.
Undo three securing screws on the underside of the left-hand hydroblock.
Remove screw in back plate.
Lift out the left hand hydroblock.
Remove any remaining components for refitting into the replacement left hand hydroblock.
Refill, vent and pressurise the boiler.
Check for any leaks.
14.28 Hydroblock Assembly Right-Hand
For access, refer to section 14.1.
Refer to section 12.8 to drain the boiler heating circuit.
Refer to diagram 14.15.
Undo the connector on the bottom of the return pipe from the hydroblock.
Undo the nut connecting return pipe to heat exchanger.
Lift the return pipe up out of the way.
Undo the coupling at the base of the expansion vessel, see diagram 14.8.
Remove the clip holding the expansion vessel coupling into the top of the right hand hydroblock.
Move the coupling out of the way.
Remove pump head, refer to section 14.14.
NOTE: It is not necessary to disconnect the electrical lead but put pump head in a convenient place where it will not strain the lead.
Remove the bypass tube, refer to section 14.21.
Remove the electrical connection to the low water pressure sensor, refer to section 14.20.
Remove the water connection clip 2 below the hydroblock, see diagram 14.19.
Remove the central heating filter, refer to section 12.7.
Remove the retaining clip to remove the drain point, refer to section 14.24.
Undo two securing screws on underside of the right hand hydroblock.
Remove screw in back plate.
Lift out the right hand hydroblock.
Remove the remaining components for refitting into the replacement right hand hydroblock.
Refill, vent and pressurise the boiler.
Check for leaks.
11480
SECURING CLIP 1
CENTRAL HEATING FLOW
SECURING CLIP 2
CENTRAL HEATING RETURN
Diagram 14.19
45 0020008155A
14 Replacement of Parts
14.29 Access to Switches and User Interface
For access, refer to section 14.1.
Release the front of the fascia by carefully prising up the two retaining latches, see diagram 14.20.
Do not allow the front of the controls fascia to swing down and be loosely held by the electrical connections to the mainsreset switch, user interface and programmer. Either remove the connections or support the fascia.
14.30 Mains Reset Switch
Refer to section 14.29 for access and diagram 14.21.
Remove the switch retaining screw.
Remove switch from housing.
Remove electrical leads.
14.31 Mains Reset Knob
Refer to section 14.29 for access.
Remove actuator by springing back retaining clips, see diagram
14.21.
Spring back knob retaining clips and push knob out from the back.
14.32 User Interface
Refer to section 14.29 for access and diagram 14.23.
Remove electrical plug.
Remove the two securing screws.
Withdraw the board.
When replacing the board refer to instructions supplied with replacement PCB on setting it up.
CONTROLS FASCIA
KNOB RETAINING CLIPS
RETAINING LATCHES
11505
Diagram 14.20
MAINS RESET SWITCH
14.33 Main PCB
For access, refer to section 14.1.
Hinge down the control box.
Remove three TORX screws and unhook the rear panel.
Remove the electrical connections to the PCB.
Prise back the two PCB retaining clips and withdraw the PCB.
When refitting the rear panel ensure the leads are not trapped.
14.34 Control Box
For access, refer to section 14.33.
Remove relevant plugs and connectors, refer to wiring diagram
13.2.
Withdraw grommets and leads so they are hanging loose.
Unthread the retaining strap and remove the control box by drawing it outwards away from its retaining slots, see diagram
14.22.
MAINS RESET KNOB
Diagram 14.21
0020008155A
46
14 Replacement of Parts
RETAINING SLOTS
RETAINING STRAP
MAIN PCB
REAR PANEL
CONTROL BOX
PCB RETAINING CLIPS
TORX SCREWS (3)
FUSE
Diagram 14.22
12411
230V CONTROLS INTERFACE BOARD
USER INTERFACE
11419
Diagram 14.24
SECURING SCREWS
USER INTERFACE
14.35 Fuse - Main PCB - Control Box
For access, refer to section 14.33.
The fuse (rated 630mAT) is located at bottom right hand side of the PCB, see diagrams 13.2 or 14.22.
14.36 230V Controls Interface
For access, refer to section 14.29.
Disconnect the electrical connection from the 230V controls board and the electrical connection from the Main PCB, see diagram 14.24.
Remove the 230V controls interface retaining screw.
Remove the 230V controls interface board.
Diagram 14.23
47 0020008155A
15 Spare Parts
When ordering spare parts, contact Glow-worm’s own service organisation using the telephone number on the front cover of this booklet.
Please quote the name of the appliance and serial number, to be found on the data label, see diagram 1.2.
If ordering from British Gas also quote the G.C. number of the part.
Key No. Part No. Description GC Part No.
1 801724 Overheat Thermostat E83996
2 801911 Pressure Sensor E83997
3 801637 Spark Electrode E83999
4 2000801904 Safety Discharge Valve E84000
5 2000801898 Automatic Air Vent E84001
6 2000801897 Central Heating Filter E84002
7 801722 Heating flow thermistor /Heating return thermistor E84003
8 801649 Gas valve E84004
9 2000802779 Mains Reset Switch H20701
10 801655 Igniter Unit E84015
11 2000801909 By-pass E84016
12 2000801923 230V Controls Interface E84018
13 2000802731 Main PCB
14 2000801380 Pump (head only) E77408
15 801645 Fan
16 2000802661 User Interface - 18sxi E84024
16 2000802642 User Interface - 30sxi
17 801632 Burner - 18sxi E84021
17 801702 Burner - 30sxi E84249
10 3
11
16
12
1
2
12503
4
8
5
7
9
6
14
17
13
15
Diagram 15.1
Because of our constant endeavour for improvement, details may vary slightly from those shown in these instructions.
0020008155A
48
Loading...