Intro
To watch a video of the installation visit support.neur.io
This booklet will guide an electrician or a professional
installer through the typical installation process of
the Neurio Sensor on a two-phase system (the most
common power system in North America). If you have
a one-phase, three-phase or solar system, please visit
support.neur.io for instructions.
ITEMS NEEDED BEFORE STARTING:
+ Smartphone with the Neurio app installed
+
Flashlight — after all your power will be turned o
+
Thick rubber gloves (for working near live wires)
+
#2 Phillips and flathead screwdrivers
+
One (1) empty 15 or 20 amp dual (double)
pole breaker*
+
4" length of 12 or 14 gauge wire
+
Contents of Neurio box
*NOTE: The voltage cables on the Neurio Sensor need to be
installed on two empty breakers (one for each phase) or one empty
dual (double) pole breaker. However, some regional codes allow
you to piggyback wires on existing breakers by using the supplied
wiretaps and attaching the voltage wires from Neurio to the existing
cables before they go into a breaker. See Step 4 for diagrams. Please
consult your local electrical code for approved methods.
CAUTION: This product must be installed by an
electrician or other qualified professional. Before
following this guide, please read and review the
safety warnings provided at the end of this book.