Global Industrial 641430 User Manual

2505 Mill Center Parkway, Buford, GA 30518
1-800-645-1232
Horizontal Baby Changing Station
Installation Instructions
Instructions d’installation de la station
à langer horizontale
Instrucciones para la instalación de la
estación horizontal para cambiar pañales
Models Included / Les Modèles Inclus / Modelos Incluídos:
641430
WARNING
• Failure to follow these warnings and the installation instructions could result in serious injury
or
discard.
death.
all instructions before installing
diaper changing station. Keep these instructions. DO NOT
AVERTISSEMENT
• Le
• Lisez attentivement toutes les instructions avant d’installer la station à langer. Conservez ces
non
respect de ces avertissements et instructions d’installation peut entraîner des blessures ou
la mort.
NE
les
jetez PAS.
ADVERTENCIA
• El no seguir estas advertencias y las instrucciones para la instalación podría causar lesiones
muerte.
o la
• Lea todas las instrucciones antes de instalar la estación para cambiar pañales. Guarde estas NO las deseche.
AB20341A
ASSEMBLY INSTRUCTIONS
ADULT INSTALLATION REQUIRED. TOOLS REQUIRED:
Power drill with 7/32”, 1/8” and 1/2” masonry bits (C)
(A)
Level Measuring tape
screwdriver with bull nose phillips bit (D)
Power
(B)
A
C
D
B
Unpack carton and identify all parts.
ALL INSTRUCTIONS BEFORE ASSEMBLY of Diaper Changing Station.
READ
PARTS LIST
Parts Description Quantity
Hardware for installation: 3” Wood Screws 4 3/4” Finishing Washers 4 3” Machine Screws 2 3/4” Flat Washers 4 Toggle Anchors 2 1-1/4” Caps 6
3” Wood Screws
For Wood Studs:
3/4” Finishing Washers
3/4” Flat Washers
3” Machine Screws
For Use With Toggle Anchors:
3/4” Flat Washers
34-1/4”
(870 mm)
17-1/2”
(445 mm)
Toggle Anchors
15-3/8”
(390 mm)
1
1-1/4” Caps
A.D.A. Compliance:
306.3 Knee Clearance
307.2 Maximum Protruding Objects
308.2 Forward Reach
308.3 Side Reach
309.4 Operation
902.3 Work Surface Compliant when properly installed.
WARNING
A
MUST be located and used for at least one side of the diaper changing station.
stud
if
The diaper changing station is no stronger than the anchors or walls to which they are attached and, therefore, MUST be
secured in order to support the weight they are intended to support. Contact an architect or building contractor
any questions.
INSTALLATION
1. Locate wood stud where left side of changing station will be mounted to the wall.
2. Measure up 42” (107 cm) from the and mark the wall. This locates the position for the top left attachment hole.
NOTE: Mark on wall MUST be in center of wood stud.
3. Align hole in top left corner of changing station with mark on wall and hold in place.
4. Using a level and measuring tape, mark the remaining three (3) holes. After marking holes, set changing station down on ground.
5. Use a power drill and appropriate bit to drill four (4) holes in the wall. This may require 2 people.
NOTE 1: For wood studs:
a 7/32” masonry bit for the pilot hole until you hit the wood
- If finished
stud, then change to 1/8” bit.
- Use wood screws, finishing washers and
NOTE 2: For use with toggle anchors:
has metal studs, or has an underlying surface of concrete block, use 1/2” bit.
- For holes NOT located in a wood stud, toggle anchors MUST be used (Fig. c). See “Using Toggle Anchors” section.
wall surface is tile or masonry over wood studs, use
washers (Fig. a).
machine
wall surface
screws
has wood studs that are not 16” on center,
and washers
(Fig. b)
.
Flat
Washer
Finishing
Washer
Wood
Screw
Changing
Changing
Station
Wood Stud
Station
Wood Stud
Fig. a
Toggle Anchor
Flat
Washer
Machine
Screw
Fig. b
6. Align holes in changing station with drilled holes and secure top left corner of changing station to wall stud using the appropriate screw and washer. Continue to secure the three (3) remaining corners using the appropriate screws and washers as described in Note 1 or Note 2.
installation through the metal brackets.
All 4 of these locations MUST be used for safe installation. The lower holes ensure
7. Ensure all four (4) screws are tight and snap caps over screw heads.
Using Toggle Anchors:
1. Insert metal end of toggle anchor into 1/2” hole.
2. Slide zip strip down snugly against wall.
3. Snap off break-away pieces of toggle anchor (Fig. d).
4. Align holes in changing station with toggle anchors and secure top left corner of changing station to
wall
using
machine screws and washers. Continue to secure the three (3) remaining corners
using
machine screws and washers.
WARNING
Wood Stud
Break-Away
Fig. c
Toggle Anchor
Fig. d
5. Ensure all four (4) screws are tight and snap caps over screw heads.
2
Loading...
+ 7 hidden pages