Global Industrial 49P403 User Manual

globalindustrial.ca
Distribucion Industrial Globales S DE RL DE CF
Assembly Instructions Instrucciones de Ensamblaje Directives d’assemblage
Customer Service
Servicio de atención al Cliente
US: 1-800-645-2986
Bus Smoking Shelter
ATTENTION:
Prior to installation, consult with all local municipal codes regarding installation of temporary shelters. Choose the location of your shelter carefully. Check for overhead utility lines, tree branches or other structures. Check for underground pipes or wires before anchoring to the ground.
WARNING:
Anchor the shelter to the ground before use. Periodically check the anchors to ensure stability of the shelter. Keep away from electrical wires.
• Use extreme caution when erecting the frame.
• Avoid using a high torque setting when drilling. High torque may damage plexi-glass panels.
• DO NOT hang objects from the roof or cross bars.
• DO NOT install near roof lines or other structures that could shed snow, ice, or excessive run off onto your shelter.
• DO NOT perform any modifications to the shelter.
Service à la clientèle
México: 01.800.681.6940
Model 493404
CONTENTS
Ref. Qty. Description Ref. Qty. Description
1 5 Foot 13 2 Rear Center Trim 2 2 Front Pillar 14 2 Side Wall Panel 3 2 Rear Corner Wall Pillar 15 4 Side Corner Trim 4 4 Side Cross Bar 16 2 Side Upper Trim 5 1 Rear Center Wall Pillar 17 2 Roof Panel 6 4 Rear Cross Bar 18 4 Tube Cover 7 1 Rear Roof Cross Bar H1 10 Floor Anchor 8 1 Center Roof Cross Bar
9 2 Outer Roof Cross Bar H2 72 M5.5 x 30mm Self Tapping 10 1 Front Roof Cross Bar 11 2 Rear Wall Panel H3 50 M4 x 20mm Self Tapping 12 1 Rear Upper Trim
Sheet Metal Screw
Sheet Metal Screw
1
4
3
2
4
1
Note: A minimum of 2 people are required for assembly.
2
6
1
6
6
5
6
1
1
052417
Bus Smoking Shelter
Assembly Instructions
3
5
Repeat step 1 to assemble this portion.
4
7
8
9
9
6
Floor Anchoring Guide
SUGGESTION:
It would be easiest to start the floor anchoring process after completing step 6.
ATTENTION:
Choose the floor anchoring location carefully. Check for underground pipes or wires before floor anchoring.
10
H3
Align all pilot holes
and secure all
joints using H3.
Use the foot to mark 2 diagonal hole locations.
Drill holes 23/8" deep using a 1/2" concrete drill bit.
H1
Insert and set concrete anchor into hole.
A B
2
Bus Smoking Shelter
Assembly Instructions
H2
12
11
87
See detail A
H2
12
13
11
DETAIL A
(Bird's Eye View)
9
See detail B
11 1113
16
H2
15
15
14
15
Note: Evenly distribute 5 screws
for all vertical trims and 4 screws for all horizontal trims.
DETAIL B
(Bird's Eye View)
11 1113
15
14
15
15
14
3
Bus Smoking Shelter
Assembly Instructions
10
17
H3
17
Front View
H3
17
Roof panels slightly
overlap at the center.
17
11
Note: The overall width of the
combined roof panels should be approximately 761/2".
18
Finished
Assembly
4
Loading...
+ 8 hidden pages