gledhill Torrent T210 DE, Torrent T144 DE Design & Installation Instructions

Torrent
a mains pressure hot water supply incorporating
a thermal store
Design & Installation
Instructions
All models comply with the WMA
specication for thermal stores.
adjacent to the appliance
Page 2
Issue 3 : 05-08
Section Page
Description 3
System Design 4
Installation 7
Commissioning 10
Servicing 12
Fault Finding 15
Parts 16
Terms & Conditions 17
These instructions should be read in conjunction with the installation/servicing instructions issued by the manufacturer of the heat source being used. Any installation must be in accordance with the relevant requirements of the Gas Safety Regulations, Local Building Regulations, I.E.E. Wiring Regulations and Byelaws of the Local Water Undertaking. It should be read in accordance with the relevant recommendations of the following: BS 6798; BS 5549; BS 5546; BS 5440:1; BS 5440:2; CP 331:3 BS 6700: BS 5258 and BS 7593: 1992
It must be installed by a competent person as stated in the Gas Safety Regulations. Manufacturers notes must NOT be taken as over-riding statutory obligations.
Torrent is not covered by Section G3 of the 1985 Building Regulations but the installation is notifiable to Building Control unless it is carried out under an approved competant person scheme.
Although the secondary supply (domestic) is at mains pressure, it is not necessary to fit an expansion chamber, pressure or temperature relief valve.
This information is provided to assist generally in the selection of equipment.
Responsibility for selection and specification of our equipment must however remain that of our customer and any experts or consultants concerned with the installation(s).
PLEASE NOTE: THAT WE DO NOT THEREFORE ACCEPT ANY RESPONSIBILITY FOR MATTERS OF DESIGN SELECTION OR SPECIFICATION, FOR THE EFFECTIVENESS OF AN INSTALLATION OR UNIT CONTAINING ONE OF OUR PRODUCTS.
All goods are sold subject to our Conditions of Sale which are set out at the rear of this specification. In the interest of continuously improving the Torrent range, Gledhill Water Storage Limited reserve the right to modify the product without notice, and in these circumstances this booklet, which is accurate at the time of printing, should be disregarded. An updated set of Instructions will be produced and supplied with new appliances and available on request.
A WRAS LISTED PRODUCT DEVELOPED BY GLEDHILL WATER STORAGE IN THE 1980’s IN CONJUNCTION WITH BRITISH GAS PLC.
BRITISH PATENT NOS. 1358166, 2136099 BRITISH PATENT APPLICATIONS PUBLISHED UNDER NOS. 2136099, 2153503, 2153504, 8516025
COMMISSION-
ING
Page 3
DESCRIPTION
INTRODUCTION
Torrent is a range of primary thermal stores designed to provide mains pressu re hot water without the requirements of a pressure and temperature relief valve. Notification to Building Control to comply with Section G3 of the Building Regulations is not required. This is because the thermal store is vented in the normal way. Unlike unvented storage cylinders the Torrent range of mains pressure hot water supply units require no maintenance. This reduces running cost for the home-owner while offering high performance showers and higher flow rates to fill a bath in approximately 4 minutes.
Torrent is available in two basic variants :-
1. Torrent Direct - For providing hot water heated by electricity. (Figure 1)
2.
Torrent Indirect - For use with gas or
oil boilers. (Figure 2)
Because this product does not require a safety discharge from a temperature and pressure relief valve, any installations will be easy to incorporate into the building and will not suffer from the problems associated with using PVCu soil stacks to take the discharge from unvented cylinders.
TORRENT DIRECT (Figure 1)
Torrent Direct is an electrically heated, fully packaged mains pressure hot water appliance. It is a combination unit which incorporates a feed and expansion tank, and eliminates the problems associated with a cold water cistern in the roof space.
It is supplied complete with two low watts density immersion heaters for extra quiet operation as recommended by the Electricity Council and BEAB approved for safety.
“Draw-off” for baths and “flow ” for power showers are fed from this one compact unit which means there are more siting options, maximising building design flexibility.
Torrent direct models are listed in Table 1.
TORRENT INDIRECT (Figure 2)
Torrent indirect is a mains pressure vented hot water cylinder designed for use with gas or oil boiler and is suitable for both open vented and sealed heating systems.
Torrent indirect models are listed in Table 2.
F & E tank supplied separately with indirect models
Direct models have the F & E tank included within the case
Page 4
SYSTEM DESIGN
INSTALLATION
Ensure that the water level in the feed and expansion cistern is set correctly when filling manually or by adjusting the ballvalve before switching on the electricity supply to the unit.
It is an important part of the commissioning procedure to ensure that the thermostat settings are accurate by allowing the tank sufficient time to hea t up and switch off without reaching boiling point. Thermostats are pre-set to 77°C. The upper immersion heater need only be used for day time topping up if necessary.
NOTE: NEVER COMMISSION ELECTRICAL INSTALLATIONS TO THE APPLIANCE UNTIL THE WATER IN THE F & E TANK IS UP TO THE WATER LEVEL MARK. FAILURE TO DO SO WILL DRY FIRE THE IMMERSION HEATERS.
If it is necessary to replace the immersion heater these should be obtained complete with pre-set thermostat from your Local Gledhill Depot.
Figure 1 Torrent Direct
TORRENT - DIRECT
This is a thermal store directly heated by electric imme rsion heater. The feed and expansion cistern is included in the finished case with the feed and vent pipe factory supplied and connected.
Adjustable thermostatic mixing valve
To hot taps/showers (22mm)
Cold mains feed (22mm)
Immersion heater (Off Peak)
Immersion heater (Boost)
TABLE 1 TORRENT DIRECT MODELS (Figure 1)
Model Capacity
Store (litres)
Hot Flow
Rate (litres)
Dimensions mm
Includes F & E Tank
Min Cupboard Size Suggested Dwelling Type
Height x Diameter Width x Depth x Height
T144 DE 160 15 1650 x 550 700 x 600 x 1900 1 - 2 bedrooms
1 bathroom
T210 DE 230 15 1870 x 595 750 x 600 x 2120 2-3 bedrooms
1 bathroom / 1 shower
All models Off peak immersion heater : 3kW; 230V;50Hz (Type 2)
On peak immersion heater : 3kW;230V;50Hz (Type 2) Mains pressure working : 1.5 - 3.5 bar (All proprietary equipment must be suitable for a maximum working pressure of 10 bar)
Page 5
SYSTEM DESIGN
Figure 2 Torrent Indirect
The primary pipework connecting the boiler and the thermal store should be sized to achieve a maximum of 11oC rise across the boiler or the maximum temperature rise specified by the boiler manufacturer. But in any instance it should not be less than 22mm copper tube.
TORRENT - INDIRECT
In an open-vented heating (Figure 5) the primary store and the heating circuit are filled from the same feed and expansion tank, supplied separately. Therefore the water treatment can be introduced through the feed and expansion tank. When calculating the quantity of water treatment, the volume of thermal store should be taken into account.
In a sealed heating system (Figure 6) the primary store water does not mix with sealed heating circuit. Therefore water treatment must be introduced via header tank for the primary store and via radiator for the heating circuit.
BOILER SIZING
It is only necessary to calculate the heating requirements in accordance with BS 5449. The allowance for domestic hot water (shown in the table below) depends upon the operating mode selected for the 3 port-valve. For example; if the system is designed to operate with priority to domestic hot water , i.e. full divert, then no additional allowance for hot water is required for sizing the boiler.
retaWtoHcitsemoDrofecnawollA
ledoM
)Wk(retaWtoHcitsemoDrofecnawollA
edoMtreviDlluF edoMerahSwolF
031T 0 2
071T 0 3
002T 0 5.3
Adjustable thermostatic mixing valve
To hot taps/showers (22mm)
Cold mains feed (22mm)
Immersion heater (optional)
Primary Coil
300
F & E Cistern supplied separately
TABLE 2 TORRENT INDIRECT (Figure 2)
Model Nominal
Store
capacity
Hot Water Flow Rate
Dimensions of thermal
store over insulation (not
including F & E tank)
Min Cupboard
Size
Suggested Dwelling Type
Litres l/min height x dia width x depth x
height
T130 130 18 1250 x 550 700 x 600 x 1800 2/3 bedroom house with one bathroom and
separate en-suite shower room
T170 170 18 1450 x 550 700 x 600 x 2000 2/4 bedroom house with one bathroom and
one or two separate en-suite shower rooms
T200 190 25 1600 x 550 700 x 600 x 2150 3/4 bedroom house with one bathroom and
up to 3 separate en-suite shower rooms or 2
bathrooms and 2 separate en-suite shower
rooms
All models * Maximum working pressure Primary thermal store = 6m Primary heating coil = 3.0 bar * Standard components Control thermostat, DHW mixing valve
Page 6
SYSTEM DESIGN
COLD AND HOT WATER DISTRIBUTION DESIGN - ALL MODELS
Torrent models are designed to be fed directly from mains. They fulfill the requirements of Water Byelaw 91, and therefore do not require a check valve to be fitted to the supply pipe. The performance of the Torrent is directly related to the adequacy of the cold supply to the dwelling. This must be capable of providing for those services which could be required simultaneously and the maximum demand should be calculated. Torrent will operate at dynamic pressures as low as 1.5 bar (at the appliance) which must be available when local demand is at its maximum, but the preferred range is between 2 and 3.5 bar.
As a general guideline, although a 15mm external service may be sufficient for the smaller dwelling with one bathroom, a 22mm service is preferred (25mm MDPE) and should be the minimum for larger dwellings.
If a water meter is fitted in the service pipe, it should have a nominal rating to match the anticipated maximum simultaneous hot and cold water demand, calculated in accordance with BS 6700. This could be 50 litres per minute in some properties.
If the incoming static mains water pressure exceeds 3.5 bar at any point in the 24 hour cycle then a pressure limiting valve set at 3.5 bar should be fitted downstream of the stop tap where the cold supply enters the property. Units must be fitted strictly in accordance with the requirements of the Local Water Undertaking who should be consulted prior to installation. In the event of any difficulty please contact us as the manufacturer. Equipment used in the system should be suitable for a working pressure of 10 bar. A typical arrangement for the hot and cold water system is shown in Figure 3.
BALLVALVE/OVERFLOW - ALL MODELS
Because it supplies the whole of the primary/heating system a ballvalve and overflow must be installed in the feed and expansion cistern when the Torrent Indirect is used in an open vented heating system. A ballvalve and overflow can also be fitted with Torrent Direct models or Torrent Indirect models fitted in sealed primary heating systems.
However because it only supplies the thermal store the feed and expansion cistern on these two appliances/systems can be filled manually if required ie through a hose pipe fitted with a double check valve. In this situation an overflow can still be fitted if required to ensure that if a leak occurs on the internal coils it can be discharged safely to the outside of the building and not discharge internally from the feed and
TYPICAL HOT AND COLD DISTRIBUTION
Check valve NOT REQUIRED unless supply pipe services more than one dwelling
Check valve NOT REQUIRED unless scale inhibitor is a chemical type.
Pressure limiting valve
(Not required unless mains pressure is greater than 3.5 bar)
Supply pipe
Second dwelling
Sink
Scale inhibitor (where necessary)
Bath
H.B.
W.C.
BS1212 Ballvalve
Figure 3 Hot and Cold Distribution Pipe Arrangement - All Models
Note: The cold feed to the
Torrent should approach from below to avoid heat
creepage during idle
periods.
expansion cistern itself. If a ballvalve is fitted a warning/overflow pipe must always be fitted.
USE IN HARD WATER AREAS
- ALL MODELS
The patented design of the heat exchange module is such that the turbulence through the coil slows down the formation of scale in even the hardest water conditions, at normal operating pressures. However, where the water can be considered hard, it is recommended that an effective proprietary in-line scale inhibitor is installed. It is important that where the supply to the Torrent is in 22mm the in-line descaler is also 22mm. In practice servicing is not normally required but in hard water areas requirements can be considered similar to those needed for instantaneous or ‘combi’ appliances. The installation of the scale inhibitor should be in accordance with the manufacturers instructions and with the Water Byelaws.
PLASTIC PIPEWORK - ALL MODELS
Th is ap pliance i s suita bl e fo r use wi th plastic pipework as long as the mat erial is recommended for the purpo se by the manufacturer and is installed fully in accordance with their recommendations. We recommend the use of barrier pipe for heating systems, which will mean the system can have British Gas service cover in regions offering this service. A short 300mm length of copper pipe must be fitted at the hot outlet from the thermostatic mixing valve.
WATER TREATMENT
In all Torrent models treating the primary water will not contaminate domestic hot water supply.
Loading...
+ 14 hidden pages