GlassCrafters ACERO Series, ACERO AS-60T-38, ACERO AS-54T-38, ACERO AS-48T-38, ACERO AT-66T-38 Installation Instructions Manual

...
GLASSCRAFTERS, INC 193 Veterans Blvd., Carlstadt, NJ 07072
1+(888) 683-1362 -- (Fax) 201-525-1117 sales@glasscraftersinc.com
ACERO Frameless Shower/Tub Enclosure
Installation Instructions
The following instruction sheet is for the installation of the models:
SHOWER ENCLOSURES: AS-60T-38
TUB ENCLOSURES: AT-66T-38 63”- 66”w X 66”h , AT-60T-38 57”- 60”w X 66”h
All Units are available in four finishes: Brushed Stainless Steel (BSS), Polished Stainless Steel (PSS), Iron Black (IBK) or Oil Rubbed Bronze (ORB)
57”- 60”w X 76”h , AS-54T-38 51”- 54’w X 76”h, AS-48T-38 45”- 48”w X 76”h
FOR BEST RESULTS
Glasscrafters recommends the installation
be performed by a trained installer.
Shower Enclosure
INSTALLING
THESE UNITS
REQUIRES
2 PERSONS
WARNING: TO INSTALL ON CAST IRON, FIBERGLASS, ACRYLIC OR RESIN TUB OR SHOWER BASE
Please use extreme care while unpacking and handling your GlassCrafters’ Shower or Tub Enclosure. If you need
replacement parts or have installation questions and to report any damage contact our GlassCrafters’ customer service
SAVE THESE INSTRUCTIONS
FOR FUTURE REFERENCE
Tub Enclosure
Check with the tub or shower base manufacturer to determine the tooling required.
team at 888-683-1362, Monday thru Friday from 8:00 am to 5:00 pm (EST).
Installation shall be made according to manufacturer instructions and drawing.
Glasscrafters recommends the installation be performed by a trained installer.
Revised 4/2019
CAUTION: Risk of injury or product damage. Do not attempt to cut tempered glass.
Tools Required - For installation of Your Shower Enclosure
IMPORTANT! Children should be supervised at all times while in Tub/Shower Enclosure. IMPORTANT! Never use Door Handle or Towel Bar to support yourself. This is
for tow
els or wash cloths only.
PLEASE STOP THE INSTALLATION AND CONFIRM WITH FACTORY IF THE ACTUAL NUMBER OR TYPE OF PARTS IS DIFFERENT
Parts Description
ITEM NO. DESCRIPTION QTY.
1 Vertical Wall Jamb ....................1
2 Fixed Glass Panel ....................1
3. Glass Door................................1
4. Door Handle Assembly.............1
6. Bottom “U” Channel..................1
7. Clear Setting Blocks .................3
8. Center Guide Assembly............1
9. Horizontal Rail .........................1
(with Panel Screw Assembly ....
10. Horizontal Rail Mounting
Wall Brackets ..........................2
11. Plastic Guide Insert ..................1
12. Door Stop/Bumper ....................2
13. Roller Assembly........................2
14. Panel Screw Assembly .............2
(with Header ............................
15. Anti-Lift Standoff Assembly.......2
16. Clear “Bubble” Vinyl Bumper ....1
17. End Cap .................................1
18. Curb Dam .................................1
19. Clear “H” Vinyl ...
......................1
20. Plastic Wall Anchors.................12
21.Pan Head Screws, #8 x 1 1/4” ..7
22. Flat Head Screws, #8 x 1 1/4”..5
23. Hex Key Set (4)........................1
24. Splash Guard ...........................1
Level
Caulking gun
#2 phillips screwdriver
Rubber Mallet
Electric Drill/ Power Screwdriver
Cutting Pliers
Suction Glass Lifters (rated for more than 100 lbs)
Safety glasses
WARNING: TO INSTALL ON CAST IRON, FIBERGLASS, ACRYLIC OR RESIN TUB OR SHOWER BASE-
manufacturer to determine the tooling required.
-
Check with the tub or shower base
Pencil
Drill bit, 5/16” masonry (for installation on ceramic tiles or marble)
Center Punch
Hacksaw or chop saw
(for stainless steel)
LOCTITE
Miter Box or Square
Measuring tape
Loctite 243 Blue
243
Threadlocker
BLUE
Medium strenght
ASSEMBLY AND INSTALLATION INSTRUCTIONS:
Glasscrafters recommends the installation
be performed by a trained installer.
• Read the manual and become familiar
with the steps involved in installation.
• This product requires Two persons for
safe installation.
• Always wear s
s
tallation.
afety glasses during this in-
• The proper dimensions for this
installation were submitted at the time of order. The Glass Panel and Door may overlap to accommodate minor smaller opening. One end of the Horizontal Rail many be cut with a hacksaw for stainless steel, but it must fit completely in the Horizontal Rail Mounting Brackets for a safe installation.
• When installing any mechanical part t
hrough the pre-drilled holes in the glass
s
door and panel be sure to use the gaskets and bushings supplied between any metal element and the glass. Do no over-tighten any fittings.
• The glass used in this enclosure is Tempered Safety Glass and features a Tempered Safety Glass logo. Do not install if Tempered Safety Glass logo is missing. Call Customer Service.
• Tempered Safety glass cannot be cut, grou
nd, polished or manipulated in any
w
ay.
• If the installation is over ceramic tiles the wall Jamb must lay flat on these tiles for the entire height of the unit.
• Silicone Sealant is used to seal some parts during installation and the inside of the enclosure as shown in Detail #10. Do not
IMPORTANT:
Determine if your Tub/Shower
Stall Enclosure ledge is Level and
the Wall are plumb.
• 3/8” max. OOS (Out Of Square) for the Door Side;
• 5/8”max. OOS (Out Of Square) for the Panel Side;
• 3/8” max. OOS (Out Of Square) on the Bottom (Base)
of the enclosure;
If your unit is Out-Of-Square or
Plumb greater than above STOP!
and call Customer Service.
The Phone number is
1-888-683-1362 .
2
3/4” MINIMUM CURB WIDTH
REQUIRED
caulk from the outside of the enclosure.
When ordering replacement parts,please specify the Model Number, Item Number & Part Description.
Save these Installation Instructions For Future Reference.
Write your Dealer information down on Notes Section in the back of this guide. Ask your Dealer for JOB LOG NUMBER
(Lxxxxxx-xxx) Referencing to your shower enclosure.
2
Center Guide Assembly #8
Bottom
“U” Channel
#6
Horizontal Rail
#9
(Assembled with
Panel Screws #14)
Door
Stop/
Bumper
#12
Horizontal Rail
Mounting Bracket
Assembly
#10
Vertical
Wall Jamb #1
Door -- #3
Roller Limiter
#15
Roller Assembly #13
Fixed Panel #2
Curb Dam
End View
#18
End Cap
#17
Clear Vinyl
Door Bumper #16
Clear Setting Blocks #7
Clear Plycarbonate Splash Guard #24
Clear “H” Vinyl #19
Plastic Wall Anchor
#20
Panhead #8 1 1/4”
#21
Flathead #8 1 1/4”
#22
2.5 mm
3 mm
4 mm
5 mm
HEX L KEYS #23
Panel Screws
#14
(Assembled on Header #9)
Locking Set Screws
Locking Set Screws
(Inner)
(Outer)
Handle Assembly #4
(view from bottom)
Guide 3/8” Glass Plastic Insert #11
Note: the thinner Plastic Insert is recommended for use with the Splash Guard (#24). See page 11.
Guide #8a
Alternate Plastic Guide #11d
Note: the alternate Plastic Guide is is for use with 3/8” glas and no splash guard
Cover Plate #8b
Double Face Tape #8c
IMPORTANT: Read all instructions carefully and become familiar with all parts before installation.
Unpacking: • A box cutter should not be use to open any box.
• Please remove all staples from the box prior to unpacking metal and glass.
• Stand Panels upright on a cushioned base, such as a piece of carpet or towel.
• Do not remove corner protectors during staging of installation.
• Never place glass directly on hard surfaces.
• Any assembly that requires the panel to lay flat must be on a cushion surface.
3
Align edge
Pencil Centerline
Roller adjustment See page 13, Step 10
Installation Overview --
Showing steps for installation. Refer to pages 6-15 for step-by-step installation descriptions.
6
9
4
A
A1
10
4
6
1e
11
7
5
3
1
1
2
1
4
8
Preliminary Steps: Inspect the complete product when
opening the box to ensure that all parts are accounted for, intact and void of any damage from shipping.
STEP A -- Assemble the Door:
a) Stand the Glass door upright on a carpet or tarp cushion to protect the glass. Position with the inside of the door facing out. Have the second installer support the door during installation of these parts.
b) Install the Clear Vinyl Bumper on the handle side of the door. Use a rubber mallet to tap into place. Trim even with the glass top and bottom. ( See Detail A1 below)
c) Install the Roller assembly in the top pre-drilled holes in the door. The Roller is on the outside face of the glass with the gaskets and plastic bushing between the metal parts and the glass. The adjustment mechanism nut are in the inside face. (See the Roller Assembly detail for parts assembly). (Reserve final adjustment of the roller assembly until after final installation of the door.)
d) Install the Bottom splash Guard on the door with the flange facing to the inside. Trim even with the glass.
Detail Door Assembly
Apply Threadlocker glue
LOCTITE 243 Blue Medium Strength
NOTE: Assembled door must be placed inside the shower or tub before the fixed panel is finally installed. (see step 6.
Detail Roller Assembly
Apply Threadlocker glue
LOCTITE 243 Blue Medium Strength (not provided with this unit)
Outside of Enclosure
Detail #A1
(Close-up view Clear Vinyl Bumper on Glass Door)
(Close-up view Bottom Splash Guard on Glass Door)
5
WARNING: TO INSTALL ON A CAST IRON, FIBERGLASS,
Use level to make sure lines are plumb
76”
66”
71 7/8”
61 7/8”
Panel Screws
Trim Rail This End Only
Horizontal Rail
GLASS TILE, ACRYLIC OR RESIN TUB OR SHOWER BASE
Check with the tub or shower base manufacturer to
determine the tooling required.
Detail 1C
Using the penciled centerline on the wall use a level to recheck the exact vertical position. Mark the top height for the unit at 66” or 76”.
Mark for the finished height of enclosure
STEP 1. Determine the Plumb Condition of the opening: Use a level to determined that the enclosure
is plumb on both sides.
Determine if your Tub/Shower Stall Enclosure curb is Level and the Wall are plumb.
• 3/8” max. OOS (Out Of Square) for the Door Side;
• 5/8”max. OOS (Out Of Square) for the Panel Side;
• 3/8” max. OOS (Out Of Square) on the Bottom (Base) of the enclosure.
If any side is out of plumb more than the above STOP
AND CALL CUSTOMER SERVICE.
Detail 1A
76” high unit
66 high unit
Detail 1D
4 1/8”
Mark for bottom of Wall Bracket 4 1/8” below the mark for the unit height
Detail 1B
Draw a pencil lines: 1) front to back on the exact center of the curb’ 2) left to right across the curb;
3) plumb vertical from the curb on the wall opposite the spray head.
Extend the Centerline on the curb and mark a pencil line on the verti­cal wall for the location of the vertical Wall Jamb.
Find the Midpoint of the Curb and mark a pencil line from front to back
6
Find the Centerline of the curb and mark a pencil line from left to right.
STEP 1E . Measure and Cut the Header to size
Using the mark for the bottom of the bracket measure the width of the opening for the header
location. Use a level to check the exact vertical position for the width. Subtract 3/8” to 1/2” from
this width to allow for the brackets. Mark and cut the header. (Header does not install until Step 6.)
• Use the mark for bottom of Wall Bracket.
• Measure the width of the unit the level height.
• Subtract 3/8” to 1/2” and mark this reduced width on the header and cut the end of the heade opposite the holes for the fixed panel with a hacksaw. NOTE: take care with the stainless steel cladding on the Header that it does not bend or scratch.
CUT ONLY DOOR SIDE OF THE HORIZONTAL RAIL, NOT THE PANEL SIDE
STEP 2 -- Install the Bottom “U” Channel and Cen-
Bottom”U” Channel
Bottom
”U” Channel
Top View of Bottom “U” Channel (Step 2d)
Side View of Vertical Wall Channel (Step 3a)
Base
Base
Vertical
Wall Channel
Bottom
“U” Channel
Silione
Sealant
ter Guide:
a) Using the centerline on the base as a guide, place the Bottom “U” Channel on the base on the outside of the centerline. The end of the U Channel should touch the wall marked for the wall channel l The plumb line mark on the wall opposite the shower head will be the guide for the wall channel. b) Align the outside edge of the Center Guide to butt against and align with the Bottom “U” Channel. Mark the locations for the screw holes in both predrilled parts. c) Move the parts aside and drill the holes. Use the proper bit for the enclosure materials d) Put a small amount of silicone sealant in each hole, insert the plastic wall anchor. Clean the top of the base of all debris. Put a thick, continuous bead of Silicone Sealant on the underside of the Bottom “U” Channel and the Center Guide. Also apply a bead of silicone sealant to of the end of the Bottom “U” Channel on the wall side before it is installed.
(Detail #2d). Screw both parts into place with the #8 1 1/4” flat head screws (#22).
Thin Plastic Insert
Cover Plate
e) To complete the installation of the Center Guide apply
Center Guide
the double face tape supplied to the areas around the screw holds,
End Cap
Align
U Channel
remove the tapes
second side cover­ing and press the cover plate into place. Be sure that the thin plastic insert (#11) for the glass is inside the Center Guide.
STEP 3 -- Install the Vertical Wall Jamb for the Fixed Panel:
a) Position the Vertical Wall Jamb on top of the Bottom “U” Channel as installed. It must align to th outside of the marked plumb line and be directly over the Bottom “U” Channel. (Detail #3). Recheck for level and plumb. b) Mark the position for the pre-drilled holes in the level and plumb Vertical Wall Jamb. Set jamb aside and drill using proper bit for the enclosure materials. Clean the surface of debris, add a small amount of silicone sealant in each hole and then insert the plastic wall anchors. c) Place the Vertical Wall Jamb on the Bottom “U” Channel aligned directly over the Bottom “U” Channel.Screw into place with three #8 1 1/4” panhead screws (#21).
CURB
Bottom Opening
(Left to Right)
Max. 3/8”
Out-of-Square
DETAIL #2
Panel Side
Max. 5/8”
Out-of-Square
Door Side Max. 3/8”
Out-of-Square
Plumb Line
DETAIL #2d
Put Silicone Sealant on
the underside of the Bottom “U” Channel
and where the
Bottom “U” Channel
meets the wall
Centerline
DETAIL #3DETAIL #2d
(NOTE: complete sealing of the inside of the unit will be done as the final step).
7
STEP 4 -- Assemble the Horizontal Rail on the Fixed
Panel Screws
Door Bumper
Door Bumper
Rail Mounting Wall Brackets
Rail Mounting Wall Brackets
Horizontal Rail
Panel for position:
a) The Panel Screws are shipped in position on the Horizontal Rail. Unscrew to assemble the Horizontal Rail on inside of the fixed glass panel. (See Details 4a & 4b).
Attach the Horizontal Rail to the Fixed Panel on the inside face using the two Panel Screw Assembly sets supplied pre-installed on the Horizontal Rail. ( See detail #4) Be sure the assembly is secure and tighten the set screw on the Panel Screws with the Allen Wrench supplied.
Detail 4b -- Test Fit of Assembled Horizontal Rail
DETAIL #4a-- Horizontal Rail installed on the Fixed Panel
(As viewed from the inside)
Next, slide both Door Stop/Bumpers on the Horizontal Rail, one at each end of the Horizontal Rail with the rubber bumper facing to the middle. Temporarily tighten to hold in place. Then slide the Horizontal Rail Mounting Wall Brackets fully on both ends of the Horizontal Rail and tighten into place. Test fit the assembly next to the bottom U Channel and in the Wall Channel. It should fit in the opening with not more than 3/16” space at either end to allow for adjustment within the wall bracket. Move outside the unit and stand the glass on a carpet or padding to protect the glass.
DETAIL #4c -- Assemble The Header for test fit
DETAIL #4d -- Test Fit the Header and Fixed panel
3/16” space to allow for adjustment
8
STEP 5 -- Set the Fixed Panel for position:
Place the clear Setting Blocks in the Bottom “U” Channel, evenly space about 2” from each end. Do not place on top of any of the screw heads. Two persons should be used to lift the assembled Fixed Panel to fit the panel in the Threshold and slide the panel into the Vertical Wall Jamb.
STEP 6 -- Installation of the Horizontal Rail Wall Mounting Brackets:
Check for level and Plumb position. a) Using a pencil, mark the outline of both the left and right Horizontal Rail Mounting Wall Brackets.­b) Remove the assembled Fixed Panel with the Horizontal Rail and lean against a wall outside of the enclosure. Stand the glass on a carpet or padding to protect the glass.
c) Loosed the set screw on the top and remove the Mounting Brackets from the Horizontal Rail. Place the Mounting Brackets in the outlines as marked on the wall and mark for the screw locations. Drill the holes. Use the proper bit for the enclosure materials. Place a small amount of silicone sealant in the holes and inset the plastic anchors. Screw the inner Wall Brackets into place using the #8 1 1/4” flat head screws (#22). d) Assemble the Rollers on the Door. (The Anti- Lift Standoffs are installed after the Door is installed on the Rail.)
DETAIL #5a -- Clear Setting Blocks
DETAIL #6a -- Mark the positions for the Horizontal Rail Mounting Wall Brackets
Check For Level
e) VERY IMPORTANT— MOVE THE ASSEMBLED DOOR into the enclosure with the Rollers facing to the outside of the shower. Place the glass door on a rug or padding to protect the glass. (The side with the holes for the Handle should be on the side opposite the Fixed Glass Panel.)
f) Return the outer Mounting Brackets to each end of the Horizontal Rail. Replace the Fixed Panel in position in the Vertical Wall Jamb and Bottom “U” Channel. Slide the outer part of both Horizontal Rail Mounting Brackets flush to the wall over the inner portion as mounted in the wall. Re-check for level and plumb and fix into place with the set screws and Allen Wrench provided.
DETAIL #6b -- Inner portion of Horizontal Rail Wall Mounting Bracket as affixed to the wall in the marked positions.
Check For Plumb
9
STEP 7 -- Install the Door from the Inside of the Unit:
Two persons should be used to lift the Door onto the Horizontal Rail. The bottom of the door goes in the Plastic Insert in the Center Guide. Install the Anti-Lift Standoff Assemblies in the pre-drilled holes in the door below the Horizontal Rail. The Anti-Lift Standoff threaded knob inserts from the inside. Be sure to use the gaskets between the knobs and the glass as well as the plastic bushing within the hole to protect the glass. Screw the Anti-Lift Standoff Assemblies in place hand tight.
(Final installation with the set screw is completed in Step #10 after the roller adjustment procedure.) 7b) Move the door to the closed position and then relocate the Door Stop/Bumper to the proper location against the roller when the clear vinyl bumper makes contact with the wall. 7c) Move the door to the fully open position and relocate and set the Door Stop/Bumper to prevent the door handle from hitting the panel and/or to prevent the door glass from hitting the wall.
DETAIL #7
(As viewed from the outside)
DETAIL #7a
Using the set screw at the bottom fix the Door Stop/Bumper in position
Anti-Lift Standoff is installed on the Door under the Horizontal Rail to prevent unmounting of the door. Do Not tighten in place until after the roller adjustment in Step #10.)
DETAIL #7b
(Panel with fittings as viewed from the side)
10
DETAIL #8b
Double Face Tape
Fixed Glass Pan
Glass Door
Center Guide
Bottom Cover Curb Dam
End Cap
Wall Channel
Plastic Insert
DETAIL #8c— Section view
Inside of the unit
Inside of the unit
Fixed Glass Pan
Glass Door
Center Guide
End Cap
Wall Channel
Thin Plastic Insert
Splash Guard
Bottom Cover Curb Dam
STEP 8 -- Install the End Cap and the Curb Dam:
a) To Install the End Cap first put a bead of Silicon Sealant inside the base of the end of the U Channel. Add sealant to the inside face of the vertical part of the End Cap. Slide the End Cap into the U Channel and press firmly into place.
b) Place the Curb Dam into position in front of the U channel to butting the wall. Mark the Curb Dam to fit and cut to size with a stain­less steel hacksaw. Test fit and mark the curb end position on the wall, parallel with the centerline. Place a small amount of silicone sealant on each end. Wipe the base clean of all debris. Clean surface with de­natured alcohol. (Do Not remove the pencil marks for the outside of the Curb Dam.) The Curb Dam comes with Double Face Tape on the bottom, peel away the paper covering place in position to your marks and press into place as aligned with the marks and the End Cap.
DETAIL #8a
DETAIL #8c— Section view showing the recommended upgrade with the Installation of the Splash Guard as shown in Step 1.
Inside of the unit
Recommended upgrade—replace the plastic in­sert with the thinner insert when using the optional Poly Bottom Splash Guard (See Detail 12D)
DETAIL #8d— Special Installation without the Splash Guard
Outside of the unit
If you have chosen not to install the upgrade in Step 1 and now find that there is excessive splashing or leaks a Splash Guard is supplied for the door bottom. To install this part: a) remove the door; b) cut to size and install the Splash Guard on the bottom of the glass; c) switch the plastic insert in the Center Guide for the one supplied with thinner walls; d) reinstall the Door.
11
STEP 9 -- Install the Clear “H” vinyl:
To install the “H” Clear Vinyl on the Door from the inside. Begin at the bottom edge with the flange pointing to the space between the Door and the Fixed Panel. Press or tap into place with a Rubber Mallet. Trim with cutting pliers to fit just below the Horizontal Rail.
DETAIL #9
(As viewed from
the inside)
DETAIL #9a
(As viewed from
the inside)
12
DETAIL #9b Clear “H” Vinyl
(As viewed from the inside)
STEP 10 -- Adjust Roller Height:
Remove the Threaded Knob covering the Roller mechanism on the inside of the unit. Using the 2mm Hex Wrench in the Hex Slot position on either side of the Spacer hold the assembly in position while loosening the locking nut as shown below with the 4mm Hex Wrench.
DETAIL #10
Using the 2mm Hex wrench turn the Roller on the Axel to lift and adjust the door for level. Hold in place and tighten the Locking Nut. Remove the Hex Wrenchs and replace the Threaded Knob.
(Do Not Over-tighten the Locking Nut or the Threaded Knob.)
Remove Knob Cover during adjustments
13
STEP 11 -- Install the Handle:
Insert the inside portion of the Handle (the part with the tapered knob) through the glass into the outer handle. Use vinyl gaskets and bushings to protect the glass. Us the proper Hex “L” wrench to tighten the set screws in the outer Handle to fix the Handle to the Door.
DETAIL 11 -- Installing the Handle
(As viewed from the inside)
Inside Enclosure
Outside Enclosure
DETAIL 11b
(Handle Shown from Below. The set Screw is on the outside.)
14
STEP12 -- Seal from the inside with Silicone:
End Cap
Plastic Insert
Splash Guard
Apply Silicone Sealant along the inside face of the Vertical Wall Jamb, Bottom “U” Channel, Curb Dam and the seam between the Cover Plate and the U Channel as per the drawing and details #12. (No sealant is required on the Center Guide.)
Let cure for 24 hours before use.
DETAIL #12 -- Caulking Top view
DETAIL #12a --
Sealing the Wall Jamb and Curb Dam
Silicone Sealant is shown here as applied to the INSIDE of the unit.
15
Acero Series Models
Catalog Number PSS- Polished Stainless Steel
BSS Brushed Stainless Steel IBK Iron Black ORB Oil Rubbed Bronze
Shower Enclosures
Metal Finish AS-60T-38 PSS AS-60T-38 BSS AS-60T-38 IBK AS-60T-38 ORB AS-54T-38 PSS AS-54T-38 BSS AS-54T-38 IBK AS-54T-38 ORB AS-48T-38 PSS AS-48T-38 BSS AS-48T-38 IBK AS-48T-38 ORB
Tub Enclosures
Metal Finish AT-66T-38 PSS AT-66T-38 BSS AT-66T-38 IBK AT-66T-38 ORB AT-60T-38 PSS AT-60T-38 BSS AT-60T-38 IBK AT-60T-38 ORB
NOTES:
Model Number… ___________________________________
Dealer ________________________________________________
Job Log # _____________________________________________
CLEANING INSTRUCTIONS:
Never use scouring powder, pads or sharp instruments on metal work or glass panels. We recommends the use of a squeegee after each shower to eliminate water spots on the inside of the glass panels. An occasional wiping down on the glass panels an metal parts with a mild detergent, diluted in water, is all that is need to keep your Shower/Tub enclosure looking brand new.
Cleaning Recommendations: Never use abrasive cleaners or cleaners containing ammonia. This may cause chemical damage .
For cleaning, we recommend using ammonia free Sprayway brand glass cleaner, which is available at a variety of retail outlets. www.spraywayinc.com/content/glass-cleaner
GLASSCRAFTERS, INC 193 Veterans Blvd., Carlstadt, NJ 07072
16
1+(888) 683-1362 (F) (201) 525-1117 sales@glasscraftersinc.com
Revised 4/2019
Loading...