![](/html/dd/dd57/dd5792e9df3ef4f0ccc181472a2c7b210d305090def13713c581ae04e5f12756/bg1.png)
Echelon™ Cycle Shelter
GROUND FIXING & END PANEL INSTALLATION INSTRUCTIONS
GROUND FIXING KIT CONTENTS
OPTIONAL END PANEL FIXING KIT CONTENTS:
ITEM 1 - Self Tapping Anchor Bolt (M10 x 100mm) x12
ITEM 2 - Washer (M12 x 23mm) x12
TOOLS/EQUIPMENT REQUIRED:
- Drill + 10mm masonry drill bit.
- 17mm socket + Socket wrench.
- Spiral brush + Air blower (Optional)
- 4mm Allen Key (Supplied)
1 Panel Kit 2 Panel Kit
Please also refer to the ‘Manual Handling Operations Regulations 1992’ during the handling of the
product and materials used for installation. Glasdon recommends that a full Health and Safety
analysis is carried out prior to installation.
IMPORTANT NOTE: ENSURE THAT ALL RELEVANT PERSONNEL READ THESE INSTRUCTIONS PRIOR TO USE
1 of 4
DIAGRAM NOT TO SCALE
ITEM 3 - 3mm Polycarbonate End Panel x 1
ITEM 4 - Socket Button head screw (M6 x 20mm) x 39
ITEM 5 - Spring Washer M6 x 39
ITEM 6 - Penny Washer (M6 x 25mm) x 39
ITEM 7 - Spacer (M6 x 10 x 3mm) x 39
x 2
x 78
x 78
x 78
x 78
1
4
5
2
3
6
7
![](/html/dd/dd57/dd5792e9df3ef4f0ccc181472a2c7b210d305090def13713c581ae04e5f12756/bg2.png)
2 of 4
The base should be at, steel oat nished, level and square and preferably be raised slightly
above the surrounding ground level.
The concrete base should be a minimum 25N/20mm mix strength equivalent of BS. 5328, Section
2, Part 10, Grade C25.
Using the supplied unit as a template, drill through 3 of the 4 (See Detail View A) base xing
positions in each of the feet with a 10mm masonry drill to a minimum depth of 120mm.
Clean drill hole thoroughly using a spiral brush and remove all dust using a blow out pump,
airline or similar.
Insert the ground xing and washer into the drilled hole and tighten with Socket and Wrench Set.
For optimum xing performance the following procedure is recommended.
INSTALLATION - GROUND FIXING INSTRUCTIONS
Concrete Surface Mount
Adjustable Feet
80mm
80mm
4000mm
2285mm
A
200mm
Detail View A
Minimum
Conctrete Depth
Minimum distance afrom
any edge of the concrete.
In cases of uneven ground, use the adjustable feet to level the shelter. Using the socket wrench,
untighten the xing.
Use a pump truck or available lifting equiptment to raise the shelter to the desired level. Place the
xing through the chosen level hole and tighten using the socket wrench.
To fully secure overtighten the xing using a socket wrench to break o the shear nut head.
25mm