Gilson SP-0, SP-1, SP-2, SP-2.5, SP-3 Operating Manual

...
Universal Splitters
SP-0, SP-1, SP-2, SP-2.5, SP-3, & SP-33
OPERATING INSTRUCTIONS:
1. Adjust splitter bars for desired chute width as follows:
A. Loosen two wing nuts, one on each end of splitter.
B. Lock the hopper in the “open” position by using the Safety
Lock beside the hand lever. (NOT necessary on Models
SP-0, SP-3, and SP-33.)
C. Flip the adjustable chute bars back and forth to form alternate
right and left chutes of desired width. A chute width of two to three times materials topsize is recommended. Check to be sure the width chosen results in the same number of chutes in either direction.
OPERATING MANUAL
D. Tighten wing nuts, remove Safety Lock, and close hopper.
2. Place sample in closed hopper, distributing as you pour, and level by hand until material is evenly distributed from side-to­side and from front to back in hopper. Position pans.
3. Open gates of hopper using a smooth, rather fast motion of the hand lever. Sample will divide to half the original portion in each of the bottom pans.
NOTE: Hopper gate of Models SP-3 and SP-33 are spring loaded and lever is merely released from holding notch to open hopper.
4. If a smaller sample fraction is needed, transfer portion in one pan to closed hopper, level, and split again. Repeat until the desired fraction is reached, 1/4, 1/8, 1/16, 1/32, etc.
5. Sampling accuracy can only be as good as the methods em­ployed. We suggest the following additional tips be employed as part of your standard sampling procedures:
A. Prior to splitting your sample fraction, mix the sample by
repetitive dividing and recombining entire sample in the hopper. Repeat until starting sample is thoroughly mixed.
B. When pouring samples into hopper, always use care to
distribute material back and forth in layers as you pour.
SP-2
C. If bridging or hang-up of material occurs in the chute bar
area, reset the splitter for wider chute widths.
D. Always be sure your chute bar setting gives an equal number
Model SP-0: 1in, 2in, 3in, 4in, 6in, 8in, 12in Model SP-1: 1/2in, 1in, 1-1/2in, 2in, 3in, 4in, 6in Model SP-2: 1/2in, 1in, 1-1/2in, 3in Model SP-2.5: 1/4in, 1/2in, 3/4in, 1in, 1-1/2in, 2in, 3in Models SP-3 & SP-33: 1/8in, 1/4in, 3/8in, 1/2in
E. When using Model SP-0, material in the two pans on one
side of the splitter should be treated as a single sample – i.e. combine the two when re-splitting or for retention of final sample.
(Continued on back.)
Rev: 07/23/2014
PHONE: 800-444-1508 P.O. Box 200, Lewis Center, Ohio 43035-0200 FAX: 80 0 -2 55 -5314 740-548-7298 E-mail: customerservice@gilsonco.com Website: www.globalgilson.com 740-548-5314
6. To position chute attachment on Model SP-1, remove wing nuts
from the studs on back of splitter. Insert top of bag loading chute over support angles that n ormally hold material pan, fitting holes over threaded studs. Replace wing nuts. With bag-tightening lever in horizontal position (right or left), draw top of bag over sharp corners of chute bottom and reverse fold bag on top of bag-tightening lock tab. Lift lever to secure bag.
SP2.5 ONLY:
Two position stop is used on hopper gate lever. When in Position 1, safety stop holds hopper open during cleaning or bar adjustment. Position 2 controls the maximum amount hopper can open. Failure to utilize this stop may allow material to feed outside of chute area.
7. Models SP-0, SP-2.5, SP-3, and SP-33 are manufactured with 60° chute slopes as required for coal or coke (ASTM D 2013, D 346) or for other materials requiring steep slope for proper sample flow. Other models may be easily changed to 60° from standard 45° chute slopes by adding the following adapter kits in the field:
Kit for SP-1 Model SPA-103 Kit for SP-2 Model SPA-106
POSITION 1
POSITION 2
SAFETY STOP (HOLDS HOPPER OPEN)
LEVER STOP (CONTROLS HOPPER MAXIMUM OPENINGS)
Loading...