Gilson GX-27X Series, ASPEC GX-271, GX-271 Setup Instructions

Setup Instructions
GX-271 Liquid Handler and GX-271 ASPEC™
GX-27X Series Z-Arm
This document contains instructions for setting up and installing the Z-arm on the GX-271 instruments. For complete setup instructions, refer to the user’s guide included on the documentation CD that is shipped with the instrument.
Warning! All of the components on the Z-arm must be installed before the Z-arm is attached to the instrument. Do not install the Z-arm until instructed to do so in this document.
The Z-arm and its components should be assembled and installed in the following order:
1 Isolator Probe Holder Installation
2 Guide Foot Installation
3 Fraction Collection Valve Installation (Optional)
a) Low Mount
4 Z-Arm Installation
5 Adjusting the Z Travel Height
6 Probe Installation
7 LLD (Liquid Level Detection) Cable Installation
8 Final Z-Arm Height Adjustment
Technical Specifications
Technical Specification Definition
Arm speed
Vertical punch strength
125 mm/sec in Z dimension
4.5 kg (10.0 lb)
Phone: 608-836-1551 • Fax: 608-831-4451 • E-mail: sales@gilson.com, service@gilson.com, training@gilson.com • www.gilson.com
3000 Parmenter Street • P.O. Box 620027 • Middleton, WI 53562-0027 USA
Gilson S.A.S. • 19, avenue des Entrepreneurs, BP 145, F-95400 VILLIERS LE BEL France
©2008 Gilson, Inc. All rights reserved. LT319636-04
Gilson, Inc. World Headquarters

Isolator Probe Holder Installation

Follow the instructions below to install the isolator probe holder (part number 2604615) on the isolator mounting block on the Z-arm.
Note: The isolator mounting block is factory-installed. Do not remove it from the Z-arm.
1 Using the 3 mm Allen wrench included in the GX-27X accessory package,
remove the screw from the bottom of the isolator mounting block on the Z-arm.
2 Slide the isolator mounting block down as far as it will go to the bottom of
the Z-arm.
Note: There may be some resistance when sliding the isolator mounting block.
3 Lay the Z-arm on its back on a flat surface.
4 Orient the isolator probe holder so that the D notch is at the top and the
connector for the LLD cable is facing out. Place the D notch in the isolator probe holder over the lower part of the isolator mounting block.
isolator mounting block
LLD cable connector
isolator probe holder
5 Place the screw removed in step 1 up through the bottom of the isolator
probe holder and into the isolator mounting block and tighten using the 3mm Allen wrench.

Guide Foot Installation

The guide foot (ordered separately) includes the probe guide insert and four screws.
There are different size probe guide inserts available depending on the outer diameter of the probe being used. Each insert is marked with a number of spots. Refer to the table on the right for more information.
The guide foot is installed on the Z-foot of the Z-arm.
1 Lay the Z-arm on its back on a flat surface.
2 Locate the probe guide insert and place it on the top of the guide foot. The
probe guide insert should be oriented so the wider part is at the bottom and the three holes are at the top.
3 Place the guide foot below the Z-foot and align the holes on the guide foot
with the holes on the Z-foot.
4 Place the four Phillips screws
through the bottom of the guide foot into the Z-foot and tighten.
Z-foot
Z-arm
guide foot
3 mm Allen wrench
Insert Number of Spots
1.3 mm 0
1.5 mm 1
1.8 mm 2
2.3 mm 3
2.7 mm 4
probe guide insert
spots
guide foot
guide foot installed on Z-foot
Page 2 of 5 LT319636-04
Phillips screws
Loading...
+ 3 hidden pages