Giant LP121HT User Manual 2

Model LP121HT
Triplex Ceramic Plunger Pump Operating Instructions/ Repair and Service Manual
Updated 3/98
Contents:
Installation Instructions: page 2 Pump Specifications: page 3 Exploded View: page 4 Parts List / Kits: page 5 Torque Specifications: page 5 Operating Instructions: page 6 Repair Instructions: pages 7 Dimensions: back page Warranty Information: back page
INSTALLATION INSTRUCTIONS
Installation of the Giant Industries, Inc., pump is not a complicated procedure, but there are some basic steps common to all pumps. The following information is to be considered as a general outline for installa­tion. If you have unique requirements, please contact Giant Industries, Inc. or your local distributor for assistance.
1. The pump should be installed flat on a base to a maximum of a 15 degree angle of inclina­tion to ensure optimum lubrication.
2. The inlet to the pump should be sized for the flow rate of the pump with no unnecessary restrictions that can cause cavitation. Teflon tape should be used to seal all joints. If pumps are to be operated at temperatures in excess of 2210 F, it is important to insure a positive head to the pump to prevent cavitation. See Page 6
3. The discharge plumbing from the pump should be properly sized to the flow rate to prevent line pressure loss to the work area. It is essential to provide a safety bypass valve between the pump and the work area to protect the pump from pressure spikes in the event of a blockage or the use of a shut-off gun.
4. Use of a dampener is necessary to minimize pulsation at drive elements, plumbing, connec­tions, and other system areas. The use of a dampener with Giant Industries, Inc. pumps is optional, although recommended by Giant Industries, Inc. to further reduce system pulsa­tion. Dampeners can also reduce the severity of pressure spikes that occur in systems using a shut-off gun. A dampener must be positioned downstream from the unloader.
5. Crankshaft rotation on Giant Industries, Inc. pumps should be made in the direction desig­nated by the arrows on the pump crankcase. Reverse rotation may be safely achieved by following a few guidelines available upon request from Giant Industries, Inc. Required horsepower for system operation can be ob­tained from the chart on page 3.
6. Before beginning operation of your pumping system, remember: Check that the crankcase and seal areas have been properly lubricated per recommended schedules. Do not run the pump dry for extended periods of time. Cavitation will result in severe damage. Always remember to check that all plumbing valves are open and that pumped media can flow freely to the inlet of the pump.
Finally, remember that high pressure operation in a pump system has many advantages. But, if it is used carelessly and without regard to its potential hazard, it can cause serious injury.
IMPORTANT OPERATING CONDITIONS
Failure to comply with any of these conditions invalidates the warranty.
1. Prior to initial operation, add oil to the crankcase so that oil level is between the two lines on the oil dipstick. DO NOT OVERFILL.
Use SAE 90 Industrial Gear Oil.
Crankcase oil should be changed after the first 50 hours of operation, then at regular intervals of 500 hours or less depending on operating conditions.
2. Pump operation must not exceed rated pressure, volume, or RPM. device must be installed in the discharge of the system.
3. Acids, alkalines, or abrasive fluids cannot be pumped unless approval in writing is obtained before operation from Giant Industries, Inc.
4. Run the pump dry approximately 10 seconds to drain the water before exposure to freezing temperatures.
A pressure relief
2
Specifications
LP121HT Pump
Volume ........................................................................................................ Up to 17.6 GPM
Discharge Pressure ..................................................................................... Up to 1200 PSI
Inlet Pressure .............................................................................................. Up to 90 PSI
Speed .......................................................................................................... Up to 570 RPM
Plunger Diameter ........................................................................................ 36 mm
Stroke .......................................................................................................... 40 mm
Crankcase Oil Capacity .............................................................................. 116 fl.oz.
Temperature of Pumped Fluids .................................................................. Up to 221 oF
Inlet Port ..................................................................................................... 1" BSP
Discharge Port ............................................................................................ 1-1/4" BSP
Crankshaft Mounting .................................................................................. Either Side
Shaft Rotation ................................................................................ Top of Pulley Towards Fluid End
Weight ......................................................................................................... 110 lbs.
Crankshaft Diameter ................................................................................... 35 mm
PULLEY INFORMATION
Pulley selection and pump speed are based on a 1725
RPM motor and "B" section belts. When selecting
desired GPM, allow for a ±5% tolerance on pumps
output due to variations in pulleys, belts and motors
among manufacturers.
1. Select GPM required, then select appropriate
motor and pump pulley from the same line.
2. The desired pressure is achieved by selecting the
correct nozzle size that corresponds with the pump
GPM.
LP121HT PULLEY SELECTION AND HORSEPOWER
REQUIREMENTS
RPM GPM 300 PSI 600 PSI 900 PSI 1200 PSI
200 6.2 1.3 2.6 3.8 5.1 300 9.3 1.9 3.8 5.8 7.7 400 12.4 2.6 5.1 7.7 10.2 500 15.5 3.2 6.4 9.6 12.8 570 17.6 3.7 7.3 11.0 14.6
HORSEPOWER INFORMATION
Horsepower ratings shown are the power require­ments for the pump. Gas engine power outputs must be approximately twice the pump power requirements shown above. We recommend that a 1.1 service factor be specified when selecting an electric motor as the power source. To compute specific pump horsepower requirements, use the following formula:
(GPM X PSI)/1450 = HP
3EXPLODED VIEW - LP121HT
Loading...
+ 5 hidden pages