GE Security TVN-4004-24-4T, TVN-4002-12-2T Quick Start Guide

GE
Security
TruVision NVR 40 Quick Start Guide
Content
Description 1 Handling safety 1 Operating safety 1 Rack system precautions 1 Package content 2 Unpacking the NVR 40 2 Before you begin 2 NVR 40 installation and rack mount 2 Front panel 2 Turning on the TruVision NVR 40 3 TruVision NVR 40 configuration 3 Front panel LEDs 4 Troubleshooting 4 Packaging and warranty conditions 4

Description

The TruVision NVR 40 is a network video recorder capable of recording video from up to 12 or 24 IP cameras (depending on the specific model). TruVision NVR 40 has either two or four SATA disks (storing 1 TB each).
This quick start guide gives you step-by-step instructions on how to install and configure the TruVision NVR 40 unit.
Important: If you are using the device within a GE-NAV 3.0
(or later) environment, go to the following site to get the latest version of the software: http://www.gesecurity.com/portal/site/GESecurity/menuite m.11620ebca5cc0a06574efe10140041ca/?vgnextoid=d0b5 6e992c81e110VgnVCM100000592d7003RCRD
If you are using the VisioWave/UltraView CCS or VSC software solution, refer to CCS or VSC user manuals.

Handling safety

A fully assembled TruVision NVR 40 unit can weigh up to 18 kg (40 lb.). Do not try to lift this by yourself. A safe lifting height is 20U.

Operating safety

Permanently unplug the unit if you think that it has become damaged and before you move it.
The TruVision NVR 40 unit operates from a power supply input voltage range of 100 to 240 VAC, 50 to 60 Hz.
A safe electrical earth connection must be provided to the power cord.

Rack system precautions

The following safety requirements must be considered when the unit is mounted in a rack:
The unit must be mounted in a 19” rack.
The rack construction must support the total weight of the installed units and the design should incorporate stabilizing features suitable to prevent the rack from tipping or being pushed over during installation or in normal use.
When loading a rack with the units, fill the rack from the bottom up and empty it from the top down.
The rack design should take into consideration the maximum operating ambient temperature for the unit, which is 40°C (104°F).
The rack should have a safe electrical distribution system and it must not be overloaded by the total number of units installed in the rack.
The electrical distribution system must provide a reliable earth for each unit and for the rack.
© 2009 GE Security, Inc. P/N 1069163 • REV 1.0 • ISS 13OCT09

Package content

NVR 40 installation and rack mount

The package contains:
One TruVision NVR 40 unit
One accessories box with handles and screws
Two power cords (one for use in EU and the other in North America)
One CD with TruVision NVR 40 user manuals
One CD with GE-NAV 3.0 application software
This quick start guide

Unpacking the NVR 40

1. Position the shipping case within 2 m (6 ft.) of the site where you intend to use your storage unit.
2. Inspect the packaging for crushes, cuts, water damage, or any other evidence of mishandling during transit. If you suspect damage, photograph the packaging before you open it.
3. Take care to open the box right side up.
4. Remove the accessories box.
5. Gently remove the TruVision NVR 40 unit from the shipping case and put it in a safe place.
A set of rack mounting handles and screws are included in the package. To mount the unit on the rack, follow the procedure below:
Caution: Refer to “Rack system precautions” on page 1
before you begin the assembly procedure.
1. Take out the screws and handles from the box included in the package.
2. Using the screws, connect the handles to the NVR 40 unit. See Figure 2, item 2.
3. Lift the unit and align with rack.
4. Carefully align the unit with the rack and slide it into position, and then fix the unit to the rack with the screws provided. See Figure 2, item 1.
WARNING: To prevent injury, grasp the unit underneath the lower edge, and lift with both hands. To prevent injury, keep your back straight and lift with your legs, not your back.
Figure 2: NVR 40 handles and screw position for rack mount
Figure 1: Unpacking the unit

Before you begin

Before you begin, make sure the site where you intend to set up and use your storage unit has the following:
Standard power from an independent source or a rack power distribution unit with a UPS
• Host computer

Front panel

All connectors are located on the front panel of the chassis (see Figure 3 on page 3), they include:
One PS-2 keyboard connector (purple) and one PS-2 mouse connector (green)
Four high-speed USB 2.0 ports
One VGA connector
Two Ethernet ports (10/100/1000 Mbps)
One On/Off button
• One power socket
• One interface module
2 TruVision NVR 40 Quick Start Guide
Loading...
+ 2 hidden pages