Genie Lift Tools GS-2669, Lift Tools GS-3369, Lift Tools GS-4069 Operator's Manual

Page 1
S
-
2
S
-
S
-
A
Operator's Manual Supplement
Lift Tools™ Material Carrier
G G G
669 3369 4069
NSI/CSA Models
First Edition First Printing Part No. 1288240GT
Page 2
Operator's Manual Supplement First Edition • First Printing
Introduction
Introduction
Material Carrier Safety
Danger
Failure to obey the instructions and safety rules in this manual will result in death or serious injury.
Note: These installation instructions only apply to the Genie models listed on the front cover.
Read, understand and obey all warnings and instructions provided with the material carrier.
Do not exceed the rated platform capacity. The weight of the material carrier assembly will reduce the rated platform capacity and must be subtracted from the total platform load.
The material carrier assembly weighs 80 lbs/36 kg.
Be sure the material carrier is securely installed.
When the material carrier assembly is attached, this manual should be considered a permanent part of your machine and should remain with the machine at all times.
Symbol and Hazard Pictorials Definitions
Material Carrier weighs
80 lbs /
36 kg
1288240GT
80 lbs/36 kg.
Read the supplement manual, part number 1288240GT.
2 Lift Tools™ Material Carrier Part No. 1288240GT
Page 3
First Edition • First Printing Operator's Manual Supplement
Introduction
Pre-operation Inspection
Be sure that the operator’s, safety manual,
responsibilities manual and any necessary supplements are complete, legible and in the storage container located in the platform.
Be sure that all decals are legible and in place. Inspect the work area for obstructions that
could inhibit safe loading and unloading of the Material Carrier.
Check the Material Carrier for damage, improperly installed or missing parts and unauthorized modifications.
Nuts, bolts and other fasteners Cracks in structural components Dents or damage to the Material Carrier
Decal Inspection
Use the inspection to verify that all decals are legible and in place.
Part No. Decal Description Qty
1287851GT Decal, Max Capacity 2
Part No. 1288240GT Lift Tools™ Material Carrier 3
Page 4
Operator's Manual Supplement First Edition • First Printing
NOTICE
Operating Instructions
Operating Instructions
Material Carrier Operation
1 Verify the material carrier assembly and
installation instructions have been followed properly and that the material carriers are secured to the platform railings.
2 Place the load so that it rests in both material
carriers. The length of the load should be parallel with the platform.
3 Center the load in the material carrier.
WARNING
4 Secure the load to each material carrier. Pass
the nylon strap over the load. Connect the hook to the material carrier. Tighten the ratchet strap.
5 Gently push and pull on the load to make sure
the material carriers and load are secure.
6 Keep the load secured when the machine is in
motion.
Tip-over hazard. The center of the load must be within the perimeter of the main deck of the platform.
WARNING
Tip-over hazard. The weight of the material carrier assembly and the load in the material carrier will reduce the rated platform capacity of the machine and must be factored into the total platform load.
WARNING
Tip-over hazard. The weight of the material carrier assembly and the load in the material carrier may limit the maximum number of occupants in the platform.
Component damage hazard. Do not use the machine to place loads into position.
Maximum Material Carrier Capacity
GS-2669
GS-3369
GS-4069
Material Carrier Assembly Weight
700 lbs
317 kg
500 lbs
227 kg
350 lbs
159 kg
80 lbs
36 kg
4 Lift Tools™ Material Carrier Part No. 1288240GT
Page 5
First Edition • First Printing Operator's Manual Supplement
Installation Instructions
Installation Instructions
Tools Required:
Observe and Obey:
This procedure shall be completed by a person
authorized to install the Material Carrier.
Immediately tag and remove from service a
damaged or malfunctioning machine.
Repair any machine damage or malfunction
before operating the machine.
Before Starting Installation:
Read, understand and obey the safety rules
and operating instructions in the appropriate operator's manual.
Be sure that all necessary tools and parts are
available and ready for use.
Read this procedure completely and adhere to
the instructions. Attempting shortcuts may produce hazardous conditions.
3/8 inch wrench
7/16 inch wrench
9/16 inch wrench
3/4 inch wrench
3/8 inch socket
7/16 inch socket
9/16 inch socket
3/4 inch socket
Ratchet
Components of Kit 1288239GT
Description
U-bolt, 3/8-16 x 2 x 3, PLTD 131681GT 8
Screw, HHF, 1/2-13 x 3.24, Gr 8, ZAG
Nylock flange nut, 1/2-13, G, ZAG
Nylock flange nut, 3/8-16, G, ZAG
Assembly, Material carrier post 1289762GT 2
Weldment, Rail attachment 1288628GT 4
Weldment, Base 1288629GT 2
Installation instructions 1288240GT 1
Genie part
number
1256850GT 2
1274172GT 2
1274322GT 16
Qty.
Part No. 1288240GT Lift Tools™ Material Carrier 5
Page 6
Operator's Manual Supplement First Edition • First Printing
Installation Instructions
Note: Perform this procedure on a firm, level surface with the machine in the stowed position.
Note: Refer to the illustrations for the material carrier mounting locations.
Note: The material carrier mounted to the railing of the extension deck must be located within the perimeter of the main deck whether the platform extension deck is retracted or extended.
2 Insert the material carrier post assemblies into
the rail attachments. Genie part number 1289762GT.
Note: The ratchet straps must be located towards the center of the machine.
3 Secure the base weldment to the post using
the provided retaining fasteners. Torque to 31 ft-lbs / 42 Nm. Genie part number 1288629GT, 1256850GT, 1274172GT.
WARNING
Tip over hazard. Failure to mount the material carrier as instructed, could result in the machine tipping over, causing death or serious injury.
1 Mount the rail attachments to the to the
platform using U-bolts and nylock flange nuts. Hand tighten. Genie part number 1288658GT, 131681GT, 1274322GT.
Note: Remove and discard the hex nuts and flat washers supplied with the U-bolts.
main deck extension deck
4 Secure the material carrier to the extension
deck railing. Torque to 31 ft-lbs / 42 Nm.
5 Align the material carriers and tighten the
U-bolts. Torque to 31 ft-lbs / 42 Nm.
6 Insert the supplement Operator's Manual into
the manual storage box located in the platform.
6 Lift Tools™ Material Carrier Part No. 1288240GT
Page 7
First Edition • First Printing Operator's Manual Supplement
Installation Instructions
Deck Retracted
1
2
3
4
1
2
1 material carrier 2 U-bolt and nylock flange nut 3 swing gate
Part No. 1288240GT Lift Tools™ Material Carrier 7
5
4 main deck 5 extension deck
Page 8
Operator's Manual Supplement First Edition • First Printing
Installation Instructions
Deck Extended
1
2
3
4
1
2
5
1 material carrier 2 U-bolt and nylock flange nut 3 swing gate 4 main deck 5 extension deck
8 Lift Tools™ Material Carrier Part No. 1288240GT
Page 9
First Edition • First Printing Operator's Manual Supplement
Installation Instructions
Optional Location - Deck retracted
Part No. 1288240GT Lift Tools™ Material Carrier 9
Page 10
Operator's Manual Supplement First Edition • First Printing
Installation Instructions
Optional Locations - Deck Extended
DANGER
Tip-over hazard. Do not install more than one set of material carriers in the platform. The illustration represents the two possible locations the material carrier can be installed when the platform is extended.
10 Lift Tools™ Material Carrier Part No. 1288240GT
Page 11
First Edition • First Printing Operator's Manual Supplement
Installation Instructions
This page intentionally left blank.
Lift Tools™ Material Carrier Part No. 1288240GT Operator's Manual Supplement First Edition • First Printing
Part No. 1288240GT Lift Tools™ Material Carrier 11
Page 12
Loading...