Genexis DRG488 User Manual

User manual
DRG488
Content
1. DRG488 overview
2. Installation of the DRG488
2
3
5
1
Box content:
• DRG488 product
• Four (4) self-adhesive footpads
• Two angle brackets
• Six (6) screws
• Power adapter
• DRG488 user manual
LED & button functionality
LED Activity Description
Power Green
Flashing Red
Power is on and boot completed DRG488 is booting Hardware error
Uplink Green
Yellow
1000M WAN link established* 100/10M WAN link established*
LAN Green
Yellow
1000M link* 100/10M link*
1. DRG488 overview
*blink on activity
User interfaces
Interface Description
1 WAN port
2 Ethernet LAN ports
3 Power connector
4 SFP port
5 LAN LEDs
6 Power LED
7 Uplink LED
8 Reset pinhole
Reset Button Description
Reboot
Factory default
Press reset button for less than 5 seconds and release to initiate reset.
Press and hold reset button for more than 5 seconds (when LEDs will blink) and release to initiate a factory reset. All configuration
data will be lost!
2
1 2
5
3
468
7
3
2. DRG488 installation
Option A: Placing the DRG on your desktop
To protect any surface that the DRG is standing on, there are four rubber pads that need to be attached.
1. Peel the protective paper from the rubber pads to expose the adhesive side.
2. Press each of the pads on the bottom of the DRG casing, as shown below.
3. Place the DRG on your desktop
Step 1: Select a suitable location for the DRG
Before installing the DRG, ensure your working environment meets the minimum operating require­ments of the equipment.
Characteristics Requirements
Temperature Between 0 and 45 degrees
Celcius
Operating Humidity
Max. relative humidity of 90%, non-condensing
Ventilation Minimum 10 centimeters on
all sides for cooling. If in a closet, ensure there is ade­quate airflow.
Step 2: Placement options
The DRG488 installation kit provides parts that allow you to place the DRG in various locations. Select the procedure best suited to your operating environment:
4
Option B: Mounting the DRG on the wall
To mount the DRG directly on a wall, ensure that the location is not next to electrical power cables or gas/water pipes.
1. Drill the necessary holes in the wall for sup­porting the DRG. The fixing-screw positions are shown below. A drilling template is pro­vided as separate download from the Genexis website.
2. Insert and tighten the mounting screws in the holes in the wall with the screw head approx. 2mm from the wall.
3. Position the DRG in such a way that each screw head is aligned with a mounting screw hole.
4. Push the DRG onto the screw heads and slide gently downwards until the screws lock the DRG firmly into position.
Option C: Mounting the DRG with brackets
If the DRG is to be securely installed, for example in a cabinet, angle brackets are supplied to mount the DRG horizontally or vertically.
1. Attach both angle brackets to the screw holes on the side of the DRG488, using the supplied screws.
2. Mount the DRG488 in the cabinet or on a rack, using the appropriate screws.
PWR
1 2 3 4
Uplink
5 6 7 8
10/100/1000 Mbps
PWR
1 2 3 4
Uplink
5 6 7 8
10/100/1000 Mbps
5
3. Connecting the DRG488
Step 1: Connecting to the network
Depending on the way you would like to connect the DRG488 to the broadband network (fiber SFP or copper WAN), different cables are used.
Using the Copper uplink
Use a RJ-45 Cat 5e Ethernet cable to connect the DRG488 to the broadband network socket by push­ing the cable connector gently, but firmly into the ‘WAN’ port until it locks.
Using the SFP fiber uplink
Use a fiber patch cable to connect the DRG488 to the broadband network by gently pushing the fiber connector into the ‘SFP’ module (Ensure that an MSA-compliant SFP module is properly installed in the SFP port).
Step 2: Connecting a device to the DRG488
Locate a free Ethernet LAN port for your device (see chapter 1) and push the RJ-45 Ethernet connector of your device gently into the DRG488 LAN port until it locks.
Step 3: Powering the DRG488
1. Connect the power cable from the power adapter (as delivered with the DRG488) to the DRG ‘power’ port.
2. Connect the power adapter to a main power outlet.
3. The power LED will now light up. The power LED remains lit while the product is connected.
Note: If the power LED does not light up and there is no obvious problem, please contact the supplier of your network connection.
Copyright © Genexis BV 2014 rev.1
Europe-EU Declaration of Conformity
Hereby, Genexis BV declares that this product is in compliance with the essential requirements and other relevant provisions of Directive 1999/5/EC.