General Hydroponics WaterFarm Upgrade User Manual

Circulating Upgrade KitCirculating Upgrade Kit
The WaterFarm 8 Pack Circulating Upgrade Kit contains everything
needed to reconfigure an 8 Pack and add nutrient circulation capability to an existing system. This promotes even growth and more consistent results overall.
Using the 13/16” spade bit and template,
Using the 13/16” spade bit and template,
1.
mark and drill a second grommet hole in
mark and drill a second grommet hole in each WaterFarm reservoir opposite the
each WaterFarm reservoir opposite the original hole and insert a ½” grommet
original hole and insert a ½” grommet into each new hole.
into each new hole.
Using the 13/16” spade bit and template,
Using the 13/16” spade bit and template,
2.
mark and drill a second grommet hole on
mark and drill a second grommet hole on either the left or right side of the controller
either the left or right side of the controller and insert a ½” grommet into the hole.
and insert a ½” grommet into the hole. Then use the ¼” drill bit and template to
Then use the ¼” drill bit and template to mark and drill a hole for the air hose outlet
mark and drill a hole for the air hose outlet in the controller.
in the controller.
Kit Includes:
• 9 1/2” Grommets
• 15 1/2” Straight Barbed Fittings
• 4 1/2” Elbow Barbed Fittings
• Blue Tubing 1/2” x 8”
Template
13/16”
4 Gal WaterFarm Reservoir
3.
Insert a ½” elbow all the way into the hole that was
Insert a ½” elbow all the way into the hole that was drilled in the controller and connect the blue tube
drilled in the controller and connect the blue tube from the circulating pumping column on the inside of
from the circulating pumping column on the inside of the controller. Feed the airline through the airline
the controller. Feed the airline through the airline outlet hole and connect to the single output pump.
outlet hole and connect to the single output pump.
• Blue Tubing 1/2” x 9’
Circulating pumping column
• Air Hose 1/4” x 6’
• Single Output Air Pump
Circulating Pumping Column
REQUIRES DRILL
FOR ASSEMBLY
• 13/16” Spade bit
• 1/4” Drill bit
13/16”
1/4”
Template
1/4”
13/16”
8 Gal Controller Bottom Bucket
4.
Remove all old barbed fittings and insert a ½” barbed straight fitting in each of the individual reservoirs
Remove all old barbed fittings and insert a ½” barbed straight fitting in each of the individual reservoirs and a ½” barbed elbow into the two end reservoirs. Use ½” blue tubing to connect the reservoirs in a loop
and a ½” barbed elbow into the two end reservoirs. Use ½” blue tubing to connect the reservoirs in a loop as shown below. The circulating pumping column will pump the nutrient solution into the controller from
as shown below. The circulating pumping column will pump the nutrient solution into the controller from the individual WaterFarm reservoirs and circulates it back through the system.
the individual WaterFarm reservoirs and circulates it back through the system.
Template
8 Gal Controller Bottom Bucket
p030409am
Loading...