Circulating Upgrade KitCirculating Upgrade Kit
The WaterFarm 8 Pack Circulating
Upgrade Kit contains everything
needed to reconfigure an 8 Pack and
add nutrient circulation capability to
an existing system. This promotes
even growth and more consistent
results overall.
Using the 13/16” spade bit and template,
Using the 13/16” spade bit and template,
1.
mark and drill a second grommet hole in
mark and drill a second grommet hole in
each WaterFarm reservoir opposite the
each WaterFarm reservoir opposite the
original hole and insert a ½” grommet
original hole and insert a ½” grommet
into each new hole.
into each new hole.
Using the 13/16” spade bit and template,
Using the 13/16” spade bit and template,
2.
mark and drill a second grommet hole on
mark and drill a second grommet hole on
either the left or right side of the controller
either the left or right side of the controller
and insert a ½” grommet into the hole.
and insert a ½” grommet into the hole.
Then use the ¼” drill bit and template to
Then use the ¼” drill bit and template to
mark and drill a hole for the air hose outlet
mark and drill a hole for the air hose outlet
in the controller.
in the controller.
Kit Includes:
• 9 1/2” Grommets
• 15 1/2” Straight Barbed Fittings
• 4 1/2” Elbow Barbed Fittings
• Blue Tubing 1/2” x 8”
Template
13/16”
4 Gal WaterFarm Reservoir
3.
Insert a ½” elbow all the way into the hole that was
Insert a ½” elbow all the way into the hole that was
drilled in the controller and connect the blue tube
drilled in the controller and connect the blue tube
from the circulating pumping column on the inside of
from the circulating pumping column on the inside of
the controller. Feed the airline through the airline
the controller. Feed the airline through the airline
outlet hole and connect to the single output pump.
outlet hole and connect to the single output pump.
• Blue Tubing 1/2” x 9’
• Circulating pumping column
• Air Hose 1/4” x 6’
• Single Output Air Pump
Circulating Pumping Column
REQUIRES DRILL
FOR ASSEMBLY
• 13/16” Spade bit
• 1/4” Drill bit
13/16”
1/4”
Template
1/4”
13/16”
8 Gal Controller Bottom Bucket
4.
Remove all old barbed fittings and insert a ½” barbed straight fitting in each of the individual reservoirs
Remove all old barbed fittings and insert a ½” barbed straight fitting in each of the individual reservoirs
and a ½” barbed elbow into the two end reservoirs. Use ½” blue tubing to connect the reservoirs in a loop
and a ½” barbed elbow into the two end reservoirs. Use ½” blue tubing to connect the reservoirs in a loop
as shown below. The circulating pumping column will pump the nutrient solution into the controller from
as shown below. The circulating pumping column will pump the nutrient solution into the controller from
the individual WaterFarm reservoirs and circulates it back through the system.
the individual WaterFarm reservoirs and circulates it back through the system.
Template
Air Pump
8 Gal Controller Bottom Bucket
p030409am