![](/html/7c/7cb8/7cb846f33dda14c22d576f7310806d2cad47a0e798b6d1480fa832b4eb2f1dc3/bg1.png)
GE
Lighting
AlbeoTM LED Luminaire
Heavy Industrial High Bay Lighting
(ABR1-Series)
Features
• UL 1598 Suitable for Wet Locations
• IP66 Rated Ingress Protection
BEFORE YOU BEGIN
Read these instructions completely and carefully.
Installation Guide
WARNING/AVERTISSEMENT
RISK OF ELECTRIC SHOCK
• Turn power off before inspection, installation or removal.
• Properly ground electrical enclosure.
RISK OF FIRE
• Follow all NEC and local codes.
• Use only UL or IEC approved wire for input/output connections.
Minimum size 18 AWG.
This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and
(2) this device must accept any interference received, including interference that may cause undesired operation. CAN ICES-005 (A) / NMB-005 (A)
Note: This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules. These limits are
designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment
generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful
interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be
required to correct the interference at his own expense.
Save These Instructions
Use only in the manner intended by the
manufacturer. If you have any questions,
contact the manufacturer.
RISQUES DE DÉCHARGES ÉLECTRIQUES
• Coupez l’alimentation avant d’inspecter, installer ou déplacer le luminaire.
• Assurez-vous de correctement mettre à la terre le boîtier d’alimentation électrique.
RISQUES D’INCENDIE
• Respectez tous les codes NEC et codes locaux.
• N’utilisez que des ls approuvés par UL ou IEC pour les entrées/sorties de
connexion. Taille minimum 18 AWG.
Prepare Electrical Wiring
Electrical Requirements
The LED driver must be supplied with
120-277 VAC or 347/480 VAC, 50/60 Hz per product
label and connected to an individual properly
grounded branch circuit, protected by a 15 or 20
ampere circuit breaker.
imagination at work
Grounding Instructions
The grounding and bonding of the overall system
shall be done in accordance with National Electric
Code (NEC) Article 600 and local codes.
![](/html/7c/7cb8/7cb846f33dda14c22d576f7310806d2cad47a0e798b6d1480fa832b4eb2f1dc3/bg2.png)
Unit Installation
Provide at least 12” of clearance from the top of the xture to any ceiling or surface above.
Carefully unpack unit and
1
properly inspect for defects
before installing. Wear work
gloves to prevent dirt and
oil from being transferred to
the luminaire.
Choose a mounting method: chain or cable,
2 3
rod mount, or pendant mount .
Fixture Weight
ABR1-Series
Conguration
Single 21 23
Dual 45 49
Max. Weight (lbs.)
120/277V 347/480V
Wire colors:
Black Live
White Neutral
Green Safety Ground
Purple 0-10V (+)
Gray 0-10V (–)
NOTE: The standard conguration uses a 3-conductor SOOW cable. The dimming option adds a separate 2-conductor
SOOW cable for 0-10V control wires.
NOTE: For applications requiring the “R” corrosion resistant nish, use mounting hardware appropriate for the environment.
Chain or Cable Mounting
Please follow all UL, NEC and minimum load rating guidelines when selecting and installing a cable or chain.
NOTE: When selecting chain, a joint in a circular chain link shall be welded. A joint in a chain link of another shape shall not
be located within 30 degrees of the vertical unless welded.
Attach to
structural
member
Attach to
structural
member
Dual FixtureSingle Fixture
Hang two chains/cables from a structural member of the ceiling. Fixture must be supported independently of an outlet
box. Loop chain/cable through the mounting slots next to each xture end. Chain/cable mounting locations must be in the
slots at the ends of the xture.
Threaded Rod Mounting
Attach to
Fasten
with nuts
Secure two 1/2” threaded rods into structural members in ceiling. Place a nut on each threaded rod where xture should
hang. Slide rod mount brackets onto threaded rods and tighten second nut onto rods to secure xture.
NOTE: Safety chains can be used in mounting slots at end of xture.
structural
member
See Note
Single Fixture
See Note
Dual Fixture