SA2-004 Installation Guide
SwitchAir Active Network Switch Cooling
Effective cool air delivery for rear rack mounted switches
with front (port) air intake.
Installation Precaution:
• Install SwitchAir such that the required airflow for safe operation of equipment is not compromised.
• Take precaution to avoid interference with the switch input power cords when installing on a live unit.
SwitchAir Installed in Rack
Installs in minutes while network switch is live.
UL, cUL 60950, CE,
FCC Class A
90-264 VAC 50/60Hz
15 watts
LED Power Indicator

Geist Americas
800.432.3219
geistglobal.com
Geist DCIM
1.877.449.4150
geistglobal.com
Geist Europe
+44. (0) 1823.275100
geistglobal.com
Geist Asia
China
+86.755.86639505
geistglobal.com
Installing the SwitchAir
(1) A The channels attach to the inside of the
rack using cage nuts and screws. The
front side channels use the top and
bottom holes for their attachment. The
rear channels are supported by the
stabilizing tabs that attached to the air
trunk. When the air trunk is inserted into
place the stabilizing tabs slide into the
channels.
(2) Insert Air Trunk between channels on top of network
switch. The stabilizing tabs slide into the opening on
each channel. Secure the air trunk to the rack using
cage nuts and screws.
(3) Attach Wipers to chassis using provided pan head
screws.
(4) Slide Chassis into channels and attach to rack using
customer provided cage nuts and screws.