Geist cool SwitchAir SA2-004 Installation Manual

geistglobal.com
GM1180
SA2-004 Installation Guide
SwitchAir Active Network Switch Cooling
Installation Precaution:
Install SwitchAir such that the required airflow for safe operation of equipment is not compromised.
Take precaution to avoid interference with the switch input power cords when installing on a live unit.
SwitchAir Installed in Rack
Installs in minutes while network switch is live.
SA2-004 Specifications
Rail Depth Range
26 5/8” to 29 5/8”
Airflow
94 CFM
Chassis Depth
9”
Switch Intake/Exhaust
Front/Rear
Channel Depth
26”
Safety/Approvals
UL, cUL 60950, CE, FCC Class A
Input Power/Indicator
90-264 VAC 50/60Hz
15 watts
LED Power Indicator
Warranty
Two Years
Input Connector
C14
Geist Americas
800.432.3219 geistglobal.com
Geist DCIM
1.877.449.4150 geistglobal.com
Geist Europe
+44. (0) 1823.275100 geistglobal.com
Geist Asia
China +86.755.86639505 geistglobal.com
GM1180
Installing the SwitchAir
(1) A The channels attach to the inside of the
rack using cage nuts and screws. The front side channels use the top and bottom holes for their attachment. The rear channels are supported by the stabilizing tabs that attached to the air trunk. When the air trunk is inserted into place the stabilizing tabs slide into the channels.
(2) Insert Air Trunk between channels on top of network
switch. The stabilizing tabs slide into the opening on each channel. Secure the air trunk to the rack using cage nuts and screws.
(3) Attach Wipers to chassis using provided pan head
screws.
(4) Slide Chassis into channels and attach to rack using
customer provided cage nuts and screws.
1
2
Air
Network
3
Wiper
Chassis
Wiper
4
Air
Chassis
Channel
Loading...