Installation
Instructions
If you have questions, call 800.GE.CARES or visit our website at: www.monogram.com
ZXR858, ZXR859 and ZXR8510
Recirculating Accessories
For Model ZV850, Island Vent Hood
M
o
n
o
g
r
a
m
®
Installation Preparation
BEFORE YOU BEGIN
Read these instructions completely and carefully.
• IMPORTANT – Save these instructions
for local inspector’s use.
•
IMPORTANT – Observe all governing
codes and ordinances.
• Note to Installer – Be sure to leave these
instructions with the Consumer.
• Note to Consumer – Keep these instructions with
your Owner’s Manual for future reference.
• Skill Level – Installation of this appliance requires
basic mechanical and electrical skills.
• Completion time – 1 to 3 hours.
• Proper installation is the responsibility of the installer.
• Product failure due to improper installation is not
covered under the Warranty.
For Monogram local service in your area,
1.800.444.1845.
For Monogram service in Canada, call
1.888.880.3030.
For Monogram Parts and Accessories, call
1.800.626.2002.
CAUTION:
Due to the weight and size of this vent hood and to
reduce the risk of personal injury or damage to the
product, TWO PEOPLE ARE REQUIRED FOR
PROPER INSTALLATION.
WARNING: The improper connection of
the equipment-grounding conductor can result in a risk
of electric shock. Check with a qualified electrician or
service representative if you are in doubt whether the
appliance is properly grounded.
WARNING:
TO REDUCE THE RISK OF FIRE, ELECTRICAL
SHOCK OR INJURY TO PERSONS, OBSERVE
THE FOLLOWING:
A. Use this unit only in the manner intended by the
manufacturer. If you have any questions, contact the
manufacturer.
B. Before servicing or cleaning unit, switch power off
at the service panel and lock service panel to prevent
power from being switched on accidentally. If the
service panel cannot be locked, fasten a tag or
prominent warning label to the panel.
For general ventilating use only. Do not use to
exhaust hazardous or explosive materials or vapors.
Structural framing, installation work and electrical
wiring must be done by qualified person(s) in
accordance with all applicable codes and standards,
including fire-rated construction.
Sufficient air is needed for proper combustion and
exhausting of gases through the flue (chimney) of
fuel burning equipment to prevent back drafting.
Follow the heating equipment manufacturer’s
guidelines and safety standards such as those
published by the National Fire Protection Association
(NFPA), and the American Society for Heating,
Refrigeration and Air Conditioning Engineers
(ASHRAE), and the local code authorities.
Local codes vary. Installation electrical connections
and grounding must comply with applicable codes.
In the absence of local codes, the vent should be
installed in accordance with National Electrical Code
ANSI/NFPA 70-1990 or latest edition.
CONTENTS
Installation Preparation
Required Accessories .................................................. 3
Product Dimensions ................................................... 3
Duct Cover Accessories .............................................. 4
Power Supply .............................................................. 4
Tools and Materials Required .................................... 4
Remove Packaging, Check Contents ......................... 5
Install Ceiling Support ............................................... 6
Installation Instructions
Step 1, Mount Template ........................................... 6
Step 2, Install Upper Support Frame ...................... 7
Step 3, Install Lower Support Frame ....................... 7
Step 4, Secure Wiring ............................................... 8
Step 5, Size and Install Ductwork ............................ 8
Step 6, Install Decorative Duct Covers .................... 9
Step 7, Install Hood ................................................ 10
Step 8, Connect Electrical ...................................... 10
Step 9, Slide Duct Covers Down,
Install Utility Bars ....................................... 11
Step 10, Install Filters ............................................... 11
Step 11, Finalize Installation .................................... 11
2
Installation Preparation
REQUIRED ACCESSORIES
This book provides step by step instructions to install
the Monogram ZV850 ceiling mounted hood for
recirculating operation.
• One of the following accessory kits is required for nonvented ceiling mounted installations of model ZV850.
Choose the correct kit according to ceiling heights:
ZXR858 – For 8 ft. ceiling height.
ZXR859 – For 9 ft. ceiling height
ZXR8510 – For 10 ft. ceiling height.
PRODUCT DIMENSIONS
The vent hood must be installed 24″ min. and 30″ max.
above the cooking surface. 25-1/2″ is recommended for
best performance and to ensure that the duct cover
meets the ceiling. The cooking surface should be at least
36″ above the floor. Installation will be easier if the vent
hood is installed before the cooktop and countertop is
installed.
• Order the required accessory at the same time as the
vent hood and have on site before installation.
• Each kit includes decorative duct covers, a support
frame, air deflector and charcoal filters.
*Height
to Ceiling
8-1/4"
*25-1/2" Recommended
36" Reference
35-3/8"
27-1/2"
* 26-1/4” for 8 ft. Ceiling
Using ZXR858 Accessory
38-1/8” for 9 ft. Ceiling
Using ZXR859 Accessory
50-1/8” for 10 ft. Ceiling
Using ZXR8510 Accessory
* The distance between the cooking surface and the bottom of the
hood must be at least 24” and up to 30”. The 25-1/2” recommended
installation height, above the standard 36” countertop, will ensure
duct cover fit to the ceiling.
3
Installation Preparation
USING DUCT COVER ACCESSORIES
A duct cover accessory is required for all ceiling
heights. Use this chart to determine the correct Duct
Cover Accessory for 8-ft. to 10-ft. ceilings that must be
ordered with the hood.
ZV850SB Installation Heights
Actual
Ceiling
Height
7′ 11″
8′ 0″
8′ 1″
8′ 2″
8′ 3″
8′ 4″
8′ 5″
8′ 6″
8′ 7″
8′ 8″
8′ 9″
8′ 10″
8′ 11″
9′ 0″
9′ 1″
9′ 2″
9′ 3″
9′ 4″
9′ 5″
9′ 6″
9′ 7″
9′ 8″
9′ 9″
9′ 10″
9′ 11″
10′ 0″
*Based on 36″ countertop height.
*Possible Hood
Installation Height
24-1/2″
25-1/2″
25-1/2″ to 26-1/2″
25-1/2″ to 27-1/2″
25-1/2″ to 28-1/2″
25-1/2″ to 29-1/2″
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
ZV850SB Duct Cover Dimensions
Recirculating
Installation
ZXR858C
ZXR859C
ZXR8510C
A
14-3/16″
21-7/8″
26″
Recirculating
Accessory
B
15″
22-1/2″
27-15/16″
ZXR858C
ACCESSORY
ACCESSORY ZXR859C
ACCESSORY ZXR8510C
9-7/16"
A
15-3/4"
POWER SUPPLY
IMPORTANT - (Please read carefully)
WARNING:
FOR PERSONAL SAFETY, THIS APPLIANCE MUST
BE PROPERLY GROUNDED.
Remove house fuse or open circuit breaker before
beginning installation.
Do not use an extension cord or adapter plug with
this appliance. Follow National electrical codes or
prevailing local codes and ordinances.
Electrical supply
This vent hood must be supplied with 120V, 60Hz,
and connected to an individual, properly grounded
branch circuit, and protected by a 15 or 20 amp
circuit breaker or time delay fuse.
• Wiring must be 2 wire with ground.
• If the electrical supply does not meet the above
requirements, call a licensed electrician before
proceeding.
• Route house wiring in the ceiling, as close to the
installation location as possible. Allow an additional 3 feet length from ceiling joists to reach the
junction box on the hood.
• Connect the wiring to the house wiring in accordance with local codes.
Grounding instructions
The grounding conductor must be connected to a
ground metal, permanent wiring system, or an
equipment-grounding terminal or lead on the hood.
WARNING: The improper connection of
the equipment-grounding conductor can result in a
risk of electric shock. Check with a qualified electrician or service representative if you are in doubt
whether the appliance is properly grounded.
TOOLS AND MATERIALS
REQUIRED
• Tape measure
• Knife
• Spirit level
• Wire cutter/stripper
• Wire nuts
• Electric drill and 5/32” bit
B
• Phillips and flat-blade
screwdrivers
• Hammer
• Pliers
• Center punch
4
(NOT SUPPLIED)
• 10 mm Hex wrench/socket
• Safety glasses
• Duct tape
• Plumb
• Gloves to protect against sharp
edges
• 120V 60Hz. 15 or 20 Amp, 2 wire
with ground. Properly grounded
branch circuit.
• Strain relief for junction cover
• 6” round duct, length to suit
installation