GE ZV925SLSS User Manual

Installation Instructions
36" Island Chimney Vent Hood
ZV925
49-80329-4
Installation Instructions
BEFORE YOU BEGIN
Read these instructions completely and carefully.
IMPORTANT Save these instructions for local
inspector’s use.
IMPORTANT – Observe all governing codes and
ordinances.
Note to Installer – Be sure to leave these instructions
with the Consumer.
Note to Consumer – Keep these instructions for
future reference.
Skill Level – Installation of this vent hood requires
basic mechanical and electrical skills.
Completion time – 1 to 3 hours.
• Proper installation is the responsibility of the installer.
• Product failure due to improper installation is not covered under the Warranty.
CAUTION:
Due to the weight and size of these vent hoods and to reduce the risk of personal injury or damage to the product, THREE PEOPLE ARE REQUIRED FOR PROPER
INSTALLATION.
PRUDENCE :
À cause du poids et des dimensions du ces hottes et pour réduire les risques de blessures ou de dommages du produit, IL FAUT TROIS PERSONNES POUR FAIRE
UNE INSTALLATION CORRECTE.
WARNING:
To reduce the risk of fire or electrical shock, do not use this range hood with any external solid-state speed control device. Any such alteration from original factory wiring could result in damage to the unit and/or create an electrical safety hazard.
AVERTISSEMENT :
Pour réduire le risque d’incendie ou de choc électrique, il ne faut pas utiliser cette hotte avec un régulateur de vitesse électronique externe. Toute modification de ce type du branchement d’usine peute endommager l’appareil ou créer un risque de choc électrique.
TO REDUCE THE RISK OF FIRE, USE ONLY METAL DUCTWORK.
WARNING: TO REDUCE THE RISK OF FIRE,
manufacturer. If you have any questions, contact the manufacturer.
B. Before servicing or cleaning unit, switch power off at the
service panel and lock service panel to prevent power from being switched on accidentally. If the service panel cannot be locked, fasten a tag or prominent warning label to the panel.
AVERTISSEMENT :
POUR RÉDUIRE LE RISQUE D’INCENDIE, DE CHOC ÉLECTRIQUE OU DE BLESSURES, IL FAUT OBSERVER LES REGLES SUIVANTES : A. Utilisez cet appareil uniquement de la maniére prévue par
le fabricant. En cas de question, consultez le fabricant.
B. Avant toute intervention ou nettoyage, coupez
l’alimentation électrique au disjoncteur et verrouiller le panneau du disjoncteur pour éviter la mise sous tension accidentelle. S’il n’est pas possible de verrouiller le panneau du disjoncteur, attachez un placard ou une étiquette trés visible au panneau.
• For general ventilating use only. Do not use to exhaust hazardous or explosive materials or vapors.
• Structural framing, installation work and electrical wiring must be done by qualified person(s) in accordance with all applicable codes and standards, including fire-rated construction.
• Sufficient air is needed for proper combustion and exhausting of gases through the flue (chimney) of fuel burning equipment to prevent back drafting. Follow the heating equipment manufacturer’s guidelines and safety standards such as those published by the National Fire Protection Association (NFPA), and the American Society for Heating, Refrigeration and Air Conditioning Engineers (ASHRAE), and the local code authorities. When applicable, install any makeup (replacement) air system in accordance with local building code requirements. Visit GEAppliances. com for available makeup air solutions.
• Local codes vary. Installation of electrical connections and grounding must comply with applicable codes. In the absence of local codes, the vent should be installed in accordance with National Electrical Code ANSI/NFPA 70-1990 or latest edition.
CAUTION: To reduce risk of fire and to properly
exhaust air, be sure to duct air outside. Do not vent exhaust air into spaces within walls or ceilings or into attics, crawl spaces or garages.
PRUDENCE : Il faut prendre soin d’installer
un conduit vers l’extérieur pour réduire le risque d’incendie et pouvoir évacuer l’air correctement. Il ne faut pas évacuer l’air dans l’espace entre les parois d’un mur, un plafond ou un grenier, un espace sanitaire ou un garage.
2
Design Information
CONTENTS
Design Information
Product Dimensions ...............................................................................3
Advance Planning
Advance Planning ..................................................................................4
Power Supply ...........................................................................................4
Duct Fittings ............................................................................................ 5
Installation Preparation
Installation Height .................................................................................6
Tools and Materials Required ...........................................................7
Remove the Packaging .......................................................................7
Parts Provided ..........................................................................................8
Installation Preparation
Construct Ceiling Support ...........................................................9–11
IQVWDOODWLRQ,QVWUXFWLRQV³9HQWHGWRWKH2XWVLGH
Step 1, Mount Template ...................................................................12
Step 2, Adjust Frame Height...........................................................12
Step 3, Cut Duct to Length for Vented Installation ............13
Step 4, Install the Support Frame ................................................13
Step 5, Install Hood Attachment Screws .................................13
Step 6, Mount the Hood onto the Support .............................14
Step 7, Connect Cables .....................................................................14
Step 8, Connect Electrical ................................................................15
Step 9, Prepare the Duct Covers ..................................................16
Step 10, Install Upper Duct Cover ...............................................16
Step 11, Install Lower Duct Cover ...............................................17
Step 12, Install Duct Cover Trim ...................................................17
Step 13, Install Metal Filter ..............................................................17
Step 14, Finalize Installation ...........................................................17
IQVWDOODWLRQ,QVWUXFWLRQV³5HFLUFXODWLQJ
Step 1, Mount Template ...................................................................18
Step 2, Adjust Frame Height...........................................................18
Step 3, Install Air Deflector, Cut Duct
for Recirculating Operation ............................................19
Step 4, Install Upper Support Frame ..........................................19
Step 5, Install Lower Structure to Upper Structure ............20
Step 6, Install Blower/Motor ...........................................................20
Step 7, Install Hood Attachment Screws .................................21
Step 8, Mount the Hood onto the Support .............................21
Step 9, Connect Cables .....................................................................21
Step 10, Connect Electrical .............................................................22
Step 11, Prepare the Duct Covers ...............................................23
Step 12, Install Upper Duct Cover ...............................................23
Step 13, Install Lower Duct Cover ...............................................24
Step 14, Install Duct Cover Trim ...................................................24
Step 15, Install Filters ......................................................................... 25
Step 16, Finalize Installation ...........................................................25
PRODUCT DIMENSIONS
*Height
*Height
to
to
Ceiling
ceiling
2 3/4"
3 1/4"
35 7/8"
27 9/16"
27 9/16"
* The supplied duct cover fits 7'-11" to 9' ceiling
heights. For 9'-1" to 10'-1" ceilings, order ZX92510.
These vent hoods are supplied with a support frame for ceiling heights of 7'-11" to 10'-1".
Decorative duct covers conceal the ductwork running from the top of the hood to the ceiling.
ZX92510 accessory is available for ceiling heights of 9'-1" to 10’-1".
35 7/8"
24"min.*
30"max.*
36"min.
* Exact installation
height depends on ceiling height.
NOTE: Installation height should be measured from the cooking surface to the bottom of the outer glass portion of the hood.
This hood must be installed 24" min. and 30" max. above the cooking surface. The cooking surface should be at least 36" above the floor.
This hood may be vented to the outdoors, or it can be installed for recirculating operation.
This hood can be installed over any Monogram electric or gas cooktop. It cannot be installed over a Monogram Professional cooktop or range.
3
Advance Planning
ADVANCE PLANNING
Ductwork Planning
• These vent hoods are equipped for 8" round ductwork.
• Determine the exact location of the vent hood.
• Plan the route for venting exhaust to the outdoors.
• Use the shortest and straightest duct route possible. For satisfactory performance, duct run should not exceed 100 ft. equivalent length for any duct configurations.
• Refer to “Duct Fittings” chart to compute the maximum permissible length for duct runs to the outdoors.
• Use rigid metal ductwork only.
• Install a roof cap with damper at the exterior opening. Order the cap and any transitions needed in advance.
• When applicable, install any makeup (replacement) air system in accordance with local building code requirements. Visit GEAppliances.com for available makeup air solutions.
Ceiling Framing for Adequate Support
• These vent hoods are heavy. Adequate structural support must be provided. The ceiling structure must be capable of supporting the weight of the hood and any inadvertent user contact loads (approximately 200 pounds). The hood support frame will be supported by 2 x 4 cross framing.
• Installation will be easier if the vent hood is installed before the cooktop or countertop below is installed.
Accessory Duct Cover
• All models are shipped with a duct cover for ceiling heights of 7'-11" to 9'.
ZX92510 accessory 36-3/4"duct cover is available to reach 9'-1"to 10'-1" ceiling heights. The accessory should be ordered with the hood and be on site before final framing and wall finishing.
POWER SUPPLY
IMPORTANT - (Please read carefully)
WARNING:
FOR PERSONAL SAFETY, THIS APPLIANCE MUST BE PROPERLY GROUNDED.
ATTENTION : POUR DES RAISONS DE
SÉCURITÉ, CET APPAREIL DOIT ÊTRE CORRECTEMENT MIS À LA TERRE.
Remove house fuse or open circuit breaker before beginning installation.
Do not use an extension cord or adapter plug with this appliance. Follow National electrical codes or prevailing local codes and ordinances.
Electrical Supply
This vent hood must be supplied with 120V, 60Hz, and connected to an individual, properly grounded branch circuit, and protected by a 15 or 20 amp circuit breaker or time delay fuse.
• Wiring must be 2 wire with ground.
• If the electrical supply does not meet the above requirements, call a licensed electrician before proceeding.
• Route house wiring in the ceiling, as close to the installation location as possible. Allow additional length from ceiling joists to reach the junction box on the bottom of the hood support frame.
• Connect the wiring to the house wiring in accordance with local codes.
Grounding Instructions
The grounding conductor must be connected to a ground metal, permanent wiring system, or an equipment-grounding terminal or lead on the hood.
WARNING: The improper connection of
equipment-grounding conductor can result in a risk of electric shock. Check with a qualified electrician or service representative if you are in doubt whether the appliance is properly grounded.
AVERTISSEMENT :
Le mauvais branchement du fil de mise à la terre peut causer un choc électrique. En cas de doute, consultez un électricien qualifié ou un technicien pour déterminer si l’appareil est à la terre.
4
Advance Planning
DUCT FITTINGS
This Hood Must Use an
8d Round Duct. It Can
Transition to a
3-1/4d x 12d Duct.
Use this chart to compute maximum permissible lengths for duct runs to outdoors.
NOTE: Do not exceed maximum permissible equivalent lengths!
Maximum duct length: 100 foot for range hoods.
Flexible ducting:
If flexible metal ducting is used, all the equivalent feet values in the table should be doubled. The flexible metal duct should be straight and smooth and extended as much as possible.
DO NOT use flexible plastic ducting.
NOTE: Any home ventilation system, such as a ventilation hood, may interrupt the proper flow of combustion air and exhaust required by fireplaces, gas furnaces, gas water heaters and other naturally vented systems. To minimize the chance of interruption of such naturally vented systems, follow the heating equipment manufacturer’s guidelines and safety standards such as those published by NFPA and ASHRAE. When applicable, install any makeup (replacement) air system in accordance with local building code requirements. Visit GEAppliances.com for available makeup air solutions.
Total Equivalent Quantity Equivalent Duct Piece Dimensions Length* Used Length
Round, 1 ft. straight (per foot length)
3-1/4" x 12" 1 ft. straight (per foot length)
90° elbow 17 ft.
45° elbow 10 ft.
ø[ 90° elbow 43 ft.
3-1/4" x 12" 45° elbow 26 ft.
3-1/4" x 12" 90° flat elbow 102 ft.
8" round to 3-1/4" x 12" transition 2 ft.
3-1/4" x 12" to 8" round transition 5 ft.
8" round to 3-1/4" x 12" transition 90° elbow 6 ft.
3-1/4" x 12" to 8" round round transition 90° elbow 13 ft.
Round wall cap with damper 32 ft.
3-1/4" x 12" wall cap with damper 75 ft.
Round roof cap 44 ft.
* Actual length of straight duct plus duct fitting
equivalent. Equivalent length of duct pieces are based on actual tests conducted by GE Evaluation Engineering and reflect requirements for good venting performance with any ventilation hood.
Total Duct Run
5
Installation Preparation
DETERMINE INSTALLATION HEIGHT
• Decorative duct covers are provided to conceal the ductwork running to the ceiling.
• This hood can be installed for recirculating operation. No kits required.
The hood installation height, from the cooking surface to the bottom of the hood, depends upon ceiling height.
For optimum performance, the hood must be 24" min. and 30" max. above the cooking surface.
Use the chart on this page to accurately determine installation height and support frame adjustment, and to select the correct size top trim piece (A, B, C or D).
D
C
B
A
ZX92510 Accessory Duct cover includes a 36-3/4" long duct cover and 3 sets of duct cover top trim pieces labeled E, F, G.
Possible Hood Mounting Ceiling Installation Frame Trim Piece Height Height (inches) Height (inches) Needed
7'-11" 26 30 1/2 A
8' 8'-1" 24 34 1/2 B 8'-1" 28 30 1/2 A 8'-2" 25 34 1/2 B 8'-2" 29 30 1/2 A 8'-3" 26 34 1/2 B 8'-3" 30 30 1/2 A 8'-4" 27 34 1/2 B 8'-5" 24 38 1/2 C 8'-5" 28 34 1/2 B 8'-6" 25 38 1/2 C 8'-6" 29 34 1/2 B 8'-7" 26 38 1/2 C 8'-7" 30 34 1/2 B 8'-8" 27 38 1/2 C 8'-9" 24 42 1/2 D 8'-9" 28 38 1/2 C 8'-10" 25 42 1/2 D 8'-10" 29 38 1/2 C 8'-11" 26 42 1/2 D 8'-11" 30 38 1/2 C 9' 27 42 1/2 D
ZX92510 Accessory Duct Cover
9'-1" 24 46 1/2 E 9'-1"d 28 42 1/2 D 9'-2" 25 46 1/2 E 9'-2" 29 42 1/2 D 9'-3" 26 46 1/2 E 9'-3" 30 42 1/2 D 9'-4" 27 46 1/2 E 9'-5" 24 50 1/2 F 9'-5" 28 46 1/2 E 9'-6" 25 50 1/2 F 9'-6" 29 46 1/2 E 9'-7" 26 50 1/2 F 9'-7" 30 46 1/2 E 9'-8" 27 50 1/2 F 9'-9" 24 54 1/2 G 9'-9" 28 50 1/2 F 9'-10" 25 54 1/2 G 9'-10" 29 50 1/2 F 9'-11" 26 54 1/2 G 9'-11" 30 50 1/2 F 10' 27 54 1/2 G 10'-1" 28 54 1/2 G
27 30 1/2 A
6
Installation Preparation
TOOLS AND MATERIALS REQUIRED
(NOT SUPPLIED)
Duct tape
Pencil and tape measure
Spirit level
Step ladder
Carpenter’s square
Wire cutter/stripper
Safety glasses
Saber saw or sawsall
Pliers
socket or pivoting
hex socket with 6"
Metal snips
3/8" swivel
extensions
Wire nuts
Flashlight
Hammer
Key hole saw
Electric or battery-operated drill and 3/16" bits, Phillips and flat blade screwdriver bits.
8" round metal duct, length to suit installation.
Phillips and flat blade screwdrivers
Strain relief for junction cover.
120V 60Hz. 15 or 20 Amp, 2-wire with ground. properly grounded branch circuit.
REMOVE THE PACKAGING
CAUTION: LIFT THE HOOD OUT OF THE
BOX BY THE CENTER METAL PORTION. DO NOT LIFT BY THE GLASS SIDES.
PRUDENCE : LEVEZ LA HOTTE À
L’EXTÉRIEUR DE LA BOÎTE PAR LA PORTION MÉTAL CENTRAL. NE LEVEZ PAS PAR LES CÔTÉS DE VERRE.
CAUTION: Wear gloves to protect
against sharp edges.
PRUDENCE : Portez des gants pour
éviter les blessures causées par les tranchants.
• Grasp the hood by the metal insert in the center and lift straight up and out of the box.
• Remove and properly discard the plastic wrapping.
• Remove parts box, duct covers and other packaging.
7
Installation Preparation
PARTS PROVIDED
Locate the parts packed with the hood.
Air deflector for
recirculating installation
HARDWARE PACKAGE
Locate and check contents. Screws shown actual size.
12 sheet
42 screws total:
• 24 support frame screws
• 10 hood attachment screws
• 2 upper duct cover attachment screws
• 4 recirculating deflector screws
• 2 duct cover bracket attachment screws
Stainless steel filter
metal
screws
2 Duct cover
brackets
6 ceiling mounting screws
12 cage
nuts
2 thumb
screws
1 charcoal filter for
recirculating installation
Telescoping
support frame
Upper duct cover trim pieces
2 each of 4 sizes
Lower duct cover trim pieces
Note: Some additional hardware/screws included.
Drill 3/16
7-1/16≤ to
Centerline
of Holes
49-80406
Printed in Italy 04-06 JR
Pilot Holes
Approx. 1-1/2
Deep
Cut a 1≤Dia. Wire Access Hole
36Hood Template
Dia.
8-1/2
10-1/16≤ to Centerline
of Holes
FRONT OF HOOD
Cut a 1≤Dia. Wire Access Hole
7-1/16≤ to
Centerline
of Holes
Drill 3/16
Pilot Holes
Approx. 1-1/2
Deep
Template
8
24-3/4"
23-1/4"
Decorative duct covers
(14"wide, 12-3/16" deep when assembled)
Installation Preparation
CONSTRUCT CEILING SUPPORT
Plan the Location of the Hood and Ductwork
• Use a plumb bob to check the location. The countertop/cooktop below the hood must be centered with the hood.
Ceiling
Hood ducting centerline
Front
13-3/4"
27-9/16"
Align with center of cooktop
Side view
• The hood should extend beyond the front and rear edge of the cooking appliance.
• The duct in the ceiling must be centered over the cooktop.
Cooktop
Countertop
Ceiling Support Structure
• At the hood location, install 2 x 4 cross framing between ceiling joists as shown. (2x4’s are required to support the weight of the hood.)
10-1/16"
Install cross-framing
EXAMPLE A
symmetrically over
duct/cooktop
centerline
16" joist
7-1/16"
8” duct
spacing
• Arrange cross framing in the ceiling to suit the existing structure.
• Your ceiling joists will be like one of the following examples.
2x4 cross framing
Front
of
hood
Align duct to center of cooktop
Top view – ceiling joists parallel to front of hood
9
Cooktop outline
Loading...
+ 19 hidden pages