GE ZV850SB1SS, ZV850SB2SS, ZV850SB3SS, ZV850SB4SS, ZV850SB5SS Installation Guide

...
Page 1
GE Monogram ®
Installation
Instructions
36" Island
Vent Hood
Model
ZV850
Monogram°
Page 2
IMPORTANT - Save these instructions for local inspector's use. IMPORTANT - OBSERVE AI,L GOVERNING (;ODES AND ORDINANCES.
Note to Installer - Be sure to leave these instructions with the Consumer. Note to Consumer - Keep these instructions with your Owner's Manual for flmne reference.
WARNING: This appliance must be properly grounded. See "Electrical Supply," page 5.
If you have a question concerning the installation of this product, call the GE Answer
Center ®Consumer Information Service at
800.626.2000, 24 hours a day, 7 days a week. If you received a damaged vent hood, you
should immediately contact your dealer or builder.
For Monogram local service in your area,
1.800.444.1845.
For Monogram service in Canada, call
1.888.880.3030.
For Monogram Parts and Accessories, call
1.800.626.2002.
(;cAUTION! Due to the weight and size of this vent hood
and to reduce the risk of personal i_jury or damage to the product, TWO PEOPI,E ARE REO,.UIRED FOR PROPER INSTAI,I,ATION.
Proper installation is the responsibility of the installer. Product failure due to improper
installation is not covered under the GE
Appliance _¥arranty. See the Owner's
Manual for warranty information.
_i_SkRNING:
To reduce the risk of fire or elecuical shock, do not use this hood with any external
solid-state speed conuol device. Any such alteration flom original factory wiring could result in damage to the unit and/or create an elecuical safety hazard.
To reduce the risk of fire and to properly exhaust air, be sure to duct air outdoors. Do
not vent exhaust air into spaces within walls or ceilings or into attics, crawl spaces or garages.
_i_SkRNING: TO REDUCE THE RISK OF FIRE,
USE ONIX METAl, DUCTWORK
TO REDUCE THE RISK OF FIRE, EI,ECTRICAI, SHOCK OR INJURY TO
PERSONS, OBSERVE THE FOI,I,OWING:
A. Use this unit only in the manner intended
by the manufactureL If you have any questions, contact the manufacturer.
B. Before servicing or cleaning unit, switch power off at the service panel and lock service panel to prevent power flom being switched on accidentally. If the service panel cannot be locked, fasten a tag or prominent warning label to the panel.
For general ventilating use only. Do not use to exhaust hazardous or explosive materials or vapors.
Structural flaming, installation work and elecuical wiring must be done by qualified person (s), in accordance with all applicable codes and standards including fire-rated
construction. Sufficient air is needed for proper combustion
and exhausting of gases through the flue
(chimney) of tirol burning equipment to prevent back drafting. Follow the heating equipment manufacturer's guidelines and safety standards such as those published by
the National Fire Protection Association
(NFPA), and the American Society for Heating, Refligerafion and Air Conditioning Engineers (ASHRAE), and the local code
authorities. I,ocal codes vary. Installation elecuical
connections and grounding must comply
with applicable codes. In the absence of
local codes, the vent should be installed in accordance with National Electrical (;ode
ANSI/NFPA 70-1990 or latest edition.
Contents
Model Available ............................................ 3
Required Accessory ...................................... 3
Recirculating Operation .............................. 3
Product Dimensions ..................................... 3
Using Duct Cover Accessories ..................... 4
Installation Preparation
Tools and Materials Required ..................... 5
Power Supply ................................................ 5
Duct Fittings ................................................. 6
Step 1, Advance Planning ........................ 7, 8
Installation
Step 2, Remove the Packaging .................... 9
Step 3, Check Installation Hardware .......... 9
Step 4, Mount Template ............................ 10
Step 5, Install Support Frame .................... 10
Step 6, Secure Wiring ................................ 11
Step 7, Size and Install Ductwork .............. 11
Step 8, Install Decorative Duct Covers ..... 12
Step 9, Install Hood ................................... 13
Step 10, Connect Electrical ....................... 13
Step 11, Slide Duct Cover Down,
Install Side Utility Bars ................ 14
Step 12, Install Filters ................................. 15
Step 1,3,Finalize Installation ..................... 15
Page 3
Design Intormation
36" Island Vent Hood
Model Available
Required Aeeesso U
Reeireulating
Operation
Product Dimensions
Model This vent hood is designed to ZV850 be used in vented ceiling mounted
installations.
ZX858 - Fox 8 ft. ceiling height.
This kit includes decorative duct covers and support flames to reach an 8 ft ceiling height.
ZX859 - Fox 9 ft. ceiling height.
This kit includes decorative duct covers and support flames to reach an 9 ft ceiling height.
This hood may be installed for recirculadng
operation. One of the following kits is required and must be ordered with the hood. ZXR858 - For 8 ft. ceiling height. ZXR859 - For 9 ft. ceiling height. ZXR8510 - For 10 ft. ceiling height.
The vent hood must be installed 24" rain. and
30" max. above the cooking surface. 25-1/2" is recommended for best venting performance
and to insure that the duct cover meets the
ceiling. The cooking surface should be at least 36" above the floor. Installation will be easier if
the vent hood is installed before the cooktop
and countertop is installed.
NOTE: Accessories to meet proper ceiling height are required to complete
the installation.
ZX8510 - Fox 10 ft. ceiling height. This kit includes decorative duct covers and
support flames to reach a 10 ft. ceiling height.
Order the required accessox y at the same time as the vent hood and have on site before
installation.
Both the hood and accessory must be
on site at the time of installation. Follow
the installation insuuctions packed with
the accessory to complete the installation.
*He ght
] toCeiling
"25-1/2" Recommended
36"Reference
*26-1/4"for8ft. Ceiling
UsingZX858Accessory
38-1/8"for9 ft. Ceiling
UsingZX859Accessory
50-1/8"for10ft.Ceiling
UsingZX8510Accessory
Thedistance between the cooking surface and the bottom of the hood must be at least24" and upto 30". The 25-1/2" recommendedinstallation height, abovethe standard36" countertop,will insure duct coverfit to the ceiling.
Page 4
Design Intormation
36" Island Vent Hood
Usinff Duct
Cover Accessories
A duct cover accessory is required for all
ceiling heights. Use this chart to determine the
correct Duct Cover Accessory for 8 ft. to 10 ft. ceilings that must be ordered with the hood.
ZV850SBInstallation Heights
Actual
Ceiling * PossibleHood
Height Installation Height
7' 11" 24-1/2"
8'0" 25-1/2"
8' 1" 25-1/2"t0 26-1/2" 8' 2" 25-1/2"t0 27-1/2"
8' 3" 25-1/2" t0 28-1/2" 8' 4" 25-1/2" t0 29-1/2"
8' 5" 30" max. 8' 6" 30" max. 8' 7" 30" max. 8' 8" 30" max. 8' 9" 30" max.
8' 10" 30" max. 8' 11" 30" max.
9' O" 30" max. 9' 1" 30" max. 9' 2" 30" max.
9' 3" 30" max. 9' 4" 30" max. 9' 5" 30" max. 9' 6" 30" max. 9' 7" 30" max.
9' 8" 30" max.
9' 9" 30" max. 9' 10" 30" max. 9' 11" 30" max.
10'O" 30" max.
DuctCover Accessory
>-
o o3
co
co
IJJ ¢o
oX
_.3 N
m C.0
O3 C0
x
N >-
et-
o
uJ
<_
m
Lg3
O3
x N
>- n-
o o3 o3
uJ
co co
<_
ZV850 Duct Cover Dimensions
Vented
Installation A
ZX858SB 14-3/16" ZX859SB 20-1/2"
ZX8510SB 26"
B ,
15-3/16"
22-1/2" 27-1/2"
9-7/16" .
15-3/4"
j-
* Based on36" countertop height.
Page 5
Installation Preparation
36" Island Vent Hood
7bols and
Materials
Required
(not supplied)
Tapemeasure
Knife
Spirit level
Wire cutter
Wire stripper
Wire nuts
Electric drill and 5/32" bit
Phillips screwdriver
Flat blade screwdriver
Hammer
Pliers
10 mmHexwrench/socket
Safety glasses
Tapeto mounttemplate
Glovesto protectagainst sharp edges
IMPORTANT- (Please read careflflly)
FOR PERSONAI, SAFETY, THIS
APPI,IANCE MUST BE PROPERIX
(;ROUNDED.
Remove house flase or open circuit breaker before beginning
installation.
Do not use an extension cord or adapter plug with this appliance. Follow National
Elecuical Code or prevailing local codes and ordinances.
120V60Hz.15or20 Amp, 2wire with ground. Properlygroundedbranchcircuit.
Strain relief for junction box cover.
Plumb
Center punch
Grounding Instructions
The grounding conductor must be connected to a ground metal, permanent wiring system, or an equipment-grounding terminal or lead
on the hood.
Electrical supply This vent hood must be supplied with 120V,
60Hz, and connected to an individual, properly grounded branch circuit, and
protected by a 15 or 20 amp circuit breaker or time delay flase.
Wiring must be 2 wire with ground.
If the elecuical supply does not meet tim above requirements, call a licensed elecuician before proceeding.
Rotate house wiring in the ceiling, as close to the installation location as possible.
Allow an additional 3 feet length flom
ceiling joists to reach the junction box on the hood.
Connect the wiring to the house wiring in accordance with local codes.
Warning: The improper
connection of the equipment-
grounding conductor can result in a risk of elecuic shock. Check with
a qualified elecuician or service representative if you are in doubt whether the appliance is properly grounded.
Page 6
Installation Preparation
36" Island Vent Hood
Duct
fittincs
Use this chart to
compute maximum permissable lengths
for duct runs to
outdoors.
Note: Donot exceed maximumpermissable
equivalent lengths!
Maximumductlength: 100footforrangehoods.
Flexible ducting:
If flexible metal ducfing is used, all
the equivalent feet
values in the ruble should be doubled. The flexible metal
duct should be
straight and smooth and extended as
much as possible.
Do NOT use flexible
plastic ducfing.
Equivalent Quantity
Duct Piece Dimensions
Ro t/Ild,
straight
/_ 3-1/4" x 10"
Q_ 90 ° elbow 12 It.
@_ 3-1/4" x 10" 8 ft.
_@,_ 6" I'ound to
straight
45 ° elbow 7 It.
3-1/4" x 12" 10 It. 3-1/4" x 10" 14 ft.
90 ° elbow
3-1/4" x 12" 6tt. 45 ° elbow
3-1/4" x 10" 33 It.3-1/4" x 12" 24 It. 90 ° fiat elbow
rectangular 2 It.
I,ength* Used
lit.
(per foot
length)
lit.
(per fbot
length)
Total
Equivalent I,ength
Note:Any homeventilation system, suchas a ventilation hood, may interruptthe proper
flow of combustion air and exhaust required by fireplaces,
gas furnaces, gaswater heaters andother naturally vented systems.Tominimizethe chance of interruption of such naturally vented systems,follow the heating equipment manufacturer'sguidelinesand safety standards such asthose published by NFPAandASHRAE.
_1_ Rectangular
_ 3-1/4" x l0" 4 ft.
_ 3-1/4" x 10" 4 ft.
to 6" round 2 It.
3-1/4" x 12" 4 ft.
6" I'Ot/Ild to
rectangular transition 90 ° elbow
3-1/4" x 12" 4ft. Rectangular to 6" round
transition 90 ° elbow
wall cap
Round
with dainper 24 ft.
3-1/4" x 10" 24 ft.3-1/4" x 12" 18 ft. Rectangular wall cap
with damper
Round roof cap 33 ft.
_Actual length of straight duct plus duct fitting
equivalent. Equivalent length of duct pieces are based on actual tests conducted by GEEvaluation Engineering and reflect requirements for good venting performance with any ventilation hood.
Total Duct Run __
Page 7
Installation Preparation
36" Island Vent Hood
Advance Planning
"7-5/8"
Plan the location Determine the exact location of the vent hood.
Use a plumb to check location to be sure
The hood should project forward 1-1/2"
Observe the recommended 25-1/2" space
8-3/4" , Cross 1
Framing 1
i i i i i i i i
countertop/cooktop location below the hood
will align exacdy.
beyond the flont edge of the cooking appliance. See illusuadon.
between the cooking surface and bottom
of hood.
TopViewof SupportFraming
i
i i i
, 1B"
i i i i i i
i+l
i i i i
TypicalSupportFrameMounting
i
i
i
/!
i
i
i
Front
Approx.1-1/2''_"
BeyondCooking Surface
i i
Ceiling
i Hood
I :....]z D_ttinllne
Jl
..............................27_1/2_.........................
i i
Cooktop
Cross
Side I
v_ew I
Upper
/'//
I
Ceiling
/
/
\\\
Support
Frames
I
___- Countertop
SideView
_ Framing
,-'_8-3/4"_;
i i
Frontof
Hood
*The framing should bespaced 8-3/4" onthe sidesand 7-5/8" at the front from centerline to centerlineto accept mounting screws inthe
vent support frame.
Ceiling support structure
At the hood location, install 2 x 4 cross flaming between ceiling joists as shown.
The 2 x 4 cross flaming can be installed standing or fiat, depending on duct run. See illusuadon of ductwork, page 8.
Lower f
Note."The cross framing must be spaced 8-3/4" on
the sidefrom centerline to centerline inorder to
accept the hood mounting screws.
Page 8
Installation Preparation
36" Island Vent Hood
s1
Advance Planning
(continued)
Arrange cross flatning in tile ceiling to suit tile existing structure. See examples.
- Secure each 2 x 4 block with at least four (4), #10 wood screws, 3" long (minimum size screws, not supplied). Use 8 wood screws
total for tile two supports.
The cross framing must be accurately aligned to assure correct positioning of
the hood.
The cross framing must be level in all directions. Check with a spirit level and
adjust if necessary.
IMPORTAN#The ceiling structure must becapable of supporting
the weight ofthe hood(approximately 100 pounds)and any
inadvertent usercontact loads. It is recommendedthat the hood support frame be supported by a minimum of 2x4 crossframing.
CrossFraming
Ceil
UpperHalf
OfSupport
Joist __Hood
Frame
Height ....
Adjustment
Slot
b,
Support
-- _ Frame Opening
1 :t
Ductwork
Use tile shortest and suaightest duct route possible. For satisfactory performance, duct run should not exceed 100 feet equivalent length for any duct configuration.
Refer to "Duct Fittings" chart to compute tile maxilnum permissible length for duct rtms
to tile outdoors.
This vent hood must use 6" round duct. Tile 6" round duct can transition to 3-1/4" x 10"
or 3-1/4" x 12".
Install tile house ductwork to run horizontally between ceiling joists
or suaight tap through tile roof.
Finish the Ceiling Finish tile ceiling surface. Be sure to mark locadon of the ceiling joists and cross flaming. Check to be sure that ceiling is level, use shims if necessary.
....... I
i i i i i i i
G"
Vent Straight Up
ThroughTheCeiling
CeilingJoint
........)_ 2x4
DuctElbow
VentBetween
2
Standing
CeilingJoists
Page 9
Remove the Paekacin¢
Installation
36" Islan, d Vent Hood
The vent hood is packed separately flom the required accessory ZX858, ZX859 or ZX8510.
Remove the flame, cove_; parts box, side bars and packaging.
Remove junction box cover.
Install suain relief onto junction box coveL
Cheek Installation Hardware
I,ocate the hardware accesso_ T box packed with the hood and check contents.
E
4 FlatWashers
4 Hexhead
wood lag screws
(6mmx 2-1/2")
or
(1/4 x2-1/2")
Decorative Screws
g
2Phillips Head
8 FrameAttachment
Screwswith Washers
(attachedto
accessorysupport
frames)
4 (lOmm) Nuts and LockWashers
/o o \
N° Frontof Hood o/
" Q) "\ /
Template
2 SideBars With 4 Machine Screws
_ heckservice manualenvelopetaped
3 Filters
Check contents of the required
accesso_T, ZX858, ZX859 or ZX8510.
Support Frames with 8 Screws
and8 Washers
to the front of the hoodto be sure it
contains onestop screw. Leavethis screw in the envelope.
MountingScrewHoles
Decorative Duct Covers
Page 10
Installation
36" Island Vent Hood
Template
Install Support
Frame
Align the template with the marks on the ceiling and tape in place.
- Be sure the template is oriented correctly,
with the fiont of the hood.
Use a plumb to be sure the mounting holes
will provide parallel alignment with the
countertop below.
Center punch all hole locations.
Drill pilot holes in the 4 screw locations. Use a 5/32" bit and drill approximately
1-1/2" deep.
Cut the 6-1/4" dia. duct opening and approx.
1" dia. wire access hole.
Upper '
Support Fror
Frame Of
Hoc
! !
'-L_.__..
Lower
Support .........-i:....
Frame
. Support
Frame
Opening
CheckLevelin BothDirection
/o o \
o FrontofHood
\\ 0 /
". ..... /-" WireAccessHole
Hood.. .....LowerSupport
wlountlng_
Flange ", ,, ........................
._d_"A:7._"-_.. 13-5/8
25-1/2"Recommended
Countertop
]
"39-1/8"
*'75-1/8"
toFloor
1o
Install upper support frame
Secure the upper support flame to the ceiling joists and/or cross flaming with the 4 screws provided. For maximum rigidity
and strength, the screws must be driven
into the center of the joists and/or cross
flaming.
Check to be sure the support frame is
level, vertically and horizontally.
*!ilote:39-1/8" to top of hoodflange can be increased
up to 42" max.
*'75-1/8" rain.tofloor, 77-7/8" max.
Install lower support frame
Insert lower support flame (flom required accessory ZX858, ZX859 or ZX8510) into the
upper support flame and loosely secure with 8 screws and washers (4 on flont and 4 on back sides).
Adjust the lower support flame up or down to the desired height above the countertop. Tighten screws.
Important: Again, check to be sure the support is level in both directions. There is no wW to level the hood after the hood is secured to
the flame.
Page 11
Wiring
Route house Mring through the ceiling hole and pull a length to reach the hood junction box, approximately 6" below the support.
Tape the wire to the flont of the flame support to prevent damage during
installation and service.
Installation
36" Island Vent Hood
FrontSide
Support
Frames
r77 _
? ?
o o )Tape
? ? /
/.
J
# Ce!ling
'\\\
/
:- House
\^I;4%
s,e7
Size And
Install Duetworh
To Find Required Duct Length:
Measure flom house duct flange to bottom of support flame. (Dimension A)
- Add at least 1" to Dim. A for duct overlap
at the top.
- Submmt 1-3/4" for hood insertion into the
bottom of the flame to determine required
duct length.
(;tat the 6" duct to required length.
Note: The bottom of the duct must be external
(female) connection to the top of the hood.
The bottom end should be flared slightly, to facilitate installation of the hood.
Install duct tap through support flames and attach to house ducting with sheet metal
scIews.
Seal the connection with duct tape.
HouseDuct....
DuctConnection
ToHood........
Side
View
Support
Frame
BottomSupport
FrameFlange
11
Page 12
Se8
Install
Decorative Duct Covers
Pretap
2 Screw /
Holes
.1
i-l
f_
/
TopDuct
Cover
InstallScrewon
EachSide
TopDuct
Cover
Installation
TopDuct
Dover
BottomDuct
Cover
36" Island Vent Hood
Bottom Duct Cover
// --\\\
,,,(Stop Screw oX.....
Install Stop Screw in One
of 3 Holes
Premp or drive decorative screw into the
screw holes on the support flame. This will make screw installation easier.
Separate the two decorative duct covers.
Select the inside (top) covet, which has two
screw holes in the top.
Slide the decorative duct covet over the
support flame and push to the ceiling.
Attach to the hood support at the top with
2 supplied decorative screws.
I,ocate the stop screw in the envelope taped to the flont of the hood. Set aside.
Slide the bottom decorative duct over the installed top duct and push tap past the stop
screw hole location.
Install the supplied temporat T stop screw in one of 3 holes in the support flame or the top duct covet to prevent the bottom decorative duct covet flom sliding down.
The stop screw must be
installed. Failure to do so could result in personal injury or damage to the duct
cover.
12
Page 13
Installation
36" Island Vent Hood
Install Hood
Align Duct
Connectorto .. HouseDuct
Note: TWO PEOPLE ARE REQUIRED TO COMPLETE THIS INSTALLATION!
I,ifl the hood up to the support frame. Carefldly align tim hood mounting studs into the support flame holes, and at tim same time, guide tim hood duct connector
into tim house duct.
Install 4 nuts and lock washers to the mounting studs. Tighten with a 10mm
wrencll.
/ Align
Mounting Studs
Bottom I
gU?tr j
StopScrew __ o / Install
--l /4,ock
H II[ot _ --1 J washer
_ 4Nuts
Check hood level in both directions.
Check to be sure that the duct is positioned over tim hood connectoL
Seal tim duct connection with duct rope.
Note: Do not drive screws through lower duct connection. Doing so will prevent proper damper operation.
10
Connect
Electrical
Verify that power is turned off at the source.
If house wiring is not 2-wire with a ground wire, a ground must be provided by the insmlleL
When house wiring is aluminum,
be sure to use U.I,. approved anti-oxidant compound and aluminum-to-copper connectors.
Install strain relief into tim knockout of tim junction box coveL
Insert house wiring through strain relief and
tighten.
Connect white leads to branch circuit white
lead.
Connect black leads to branch circuit black
lead.
Connect green/yellow leads to branch
circuit green or bare ground lead.
Secure all connections with wire ntlts Oil
each elecuical connectoL
Push wires into junction box and replace
coveL Be sure wires are not pinched.
13
Page 14
Slide Duct
Cover Down,
Install Side
Utility Bars
1
Installation
36" Island Vent Hood
J
J
Hold the deco_afive duct cove_ and _emove the tempora_y stop sc_ew. Retmn
the sctew to the seevice manual envelope foi fllttl_e use.
Slide the lower duct cover down onto the hood.
Install the side utility ba_s with screws
as shown.
14
Page 15
Install Filters
LowerFilter
Slots
Remove protective film on filters.
Tip the filter into the lower slots at the rear of the opening. I,ift the filter and pull the
knob forward until the filter rests on the slots.
To remove the filters, grasp the knob, push the filter towards the rear and flit
downwards.
Installation
36" Island Vent Hood
\
\
\
\
\
e 13
Finalize Installation
Remove the protective film covering the conuol panel on the flont face of the hood, and any other packaging materials.
Check all 4 lamps to assure dghmess in sockets.
Refer to the Owner's Manual for operating insuuctions.
15
Page 16
Monogram:
GEConsumer& Industrial
GEAppliances GeneralElectricCompany Louisville,KY40225
monogram, com
5")2007 GE Company
NOTE: While performing installations described in this book, safer} glasses or goggles should be worn.
I+br Mo_og'ram local service i_ )'our area, call
1.800.444.1845.
NOTE: Prod/let impro\vment is a continuing endea or at General Electric.
There[k_re, materials, appearance and specifications are s/ll_ject to change
witho/lt notice.
Pub. No. 49-8970-2 04/07.]R
Printed in halv
!)43!)6398
Loading...