GE WattStation Wall Mount User Manual

GE Energy
WattStation
User Manual
Wall Mount
imagination at work
WattStation should be installed only a licensed contractor, and/or a licensed electrician in accordance with all applicable state, local and national electrical codes and standards. WattStation should be inspected by a qualified inspector prior to initial use. Under no circumstances will compliance with the information in this manual relieve the user of his/her responsibility to comply with all applicable codes or safety standards.
COMPONENT
TORQUE VALUE
TOLERANCE
M5 x 0.8 screw
30 in-lb
+/- 2 in-lb #12 thread-cutting screw
30 in-lb
+/- 2 in-lb 10-32 UNF screw
35 in-lb
+/- 5 in-lb 6-32 UNC screw
12 in-lb
+/- 2 in-lb Fuse block lugs
45 in-lb
+/- 2 in-lb Field wiring lugs
50 in-lb
+/- 2 in-lb Din-rail mounted terminal block lugs
12 in-lb
+/- 2 in-lb Contactor lugs
50 in-lb
+/- 2 in-lb Ground bar lugs
35 in-lb
+/- 2 in-lb M3 x 0.5 screw
12 in-lb
+/- 2 in-lb #8 thread cutting screw
30 in-ib
+/- 2 in-lb 3/4" cable strain relief fitting
Hand-Tight + 1/4 turn
N/A
WARNING: Danger of electrical shock or injury. Turn OFF power at the panelboard or load center before working inside the equipment or removing any component. Do not remove circuit protective devices or any other component until the power is turned OFF.
WattStation should be installed only by a licensed contractor, and/or a licensed electrician in accordance with all applicable state, local and national electrical codes and standards.
Loading...
+ 11 hidden pages