GE Surface Time-Saving Wellheads Brochure

GE Oil & Gas
Time-Saving Wellheads
Pressure Control SH3 Speedhead™ System
The SH3 Speedhead™ System takes multi-bowl technology one step further than ever before. By landing two strings of pipe in one compact forged housing, the SH3 system eliminates one complete BOP nipple-down/nipple-up thereby
saving signicant rig time. Additionally, specially designed
service tools can reduce installation time even further. The time saved (estimated at approximately 17 hours) makes this
product a cost-eective alternative to conventional spool type
surface wellheads.
Compared to conventional wellheads, the SH3 wellhead improves safety by reducing the number of potential leak
paths. The system completely eliminates one major ange
connection and replaces all external lockdown screws with internal retaining rings similar to those used on subsea systems.
In order to take full advantage of the time-saving capabilities of this system, the SH3 system is normally recommended for applications where the risk of a casing becoming stuck is very low.
Features —
• Improved safetyEliminates one ange – Eliminates all lockdown screws
• Time savings – Reduced BOP/diverter handling – Replaces lockdown screws with lock rings
• Flexible system – Emergency equipment – Alternate casing programs – Adapts to conventional equipment for extended
casing programs
Availability —
Top Flange
Size
11” 5,000/10,000
13-5/8” 5,000/10,000 13-3/8”
Top Flange
Pressure (psi)
Casing
9-5/8” 7” 2-3/8” thru 4-1/2”
10-3/4” 7-5/8” 2-3/8” thru 4-1/2”
Casing for
Lower Hanger
8-5/8” 2-3/8” thru 5-1/2” 9-5/8” 2-3/8” thru 7”
10-3/4” 2-7/8” thru 7-5/8”
Casing or Tubing
for Upper Hanger
295-2669
Typical Time Savings with SH3 System —
Operation Conventional SH3 System
Cut Pipe and Weld on Starting Head As Required As Required Wait-on-Cement Intermediate Casing As Required As Required Release Hanger Running Tool and Wash Out N/A 1 Hour Install and Test Annular Seal N/A 1 Hour Break Connection and Lift BOP Stack 4 Hours N/A Install Slip Hanger and Rough Cut Casing 3 Hours N/A Final Cut Casing and Install Intermediate Spool 4 Hours N/A Nipple-Up BOP Stack 8 Hours N/A Test BOP Stack As Required As Required Tubing Completion As Required As Required
Totals 19 Hours 2 Hours
Time Saved (17 Hours) x Hourly Rig Rate = Money Saved
SH3 Speedhead™ System