GE RAK7022 Data Sheet

Installation instructions
for your new
RAK7022
Transition duct adapter
Before you begin—Read these instructions completely and carefully.
IMPORTANT—OBSERVE ALL GOVERNING CODES AND ORDINANCES. Note to Installer—Be sure to leave these instructions with the Consumer. Note to Consumer—Keep these instructions with your Owner’s Manual for future reference.
Tools Needed
Phillips head screwdriver Center punch
Drill and 1/4” bit Hammer
1/4” and 5/16” Nut drivers
Parts Included
Transition duct assembly
Metal seal strip
Foam gaskets (2)
Metal clips (2)
Thumb screws (2)
Important Notes
This instruction describes how to modify an
existing GE duct adapter to be used with the new rounded room cabinet front (AZ22 and AZ32 series).
STEP 1 Removal of the chassis from the case
1. Disconnect the power to the unit.
2. For AZC or AZR series: a. Remove room cabinet front. b. Remove the three screws securing the
transition duct to the bottom of the lateral duct adapter.
c. Carefully slide the transition duct forward
and remove (see illustration in next step).
3. For AZ21 or AZ31 series: a. Remove the two thumb screws securing the
transition duct to the bottom of the lateral duct adapter.
b. Carefully slide the transition duct forward and
remove.
c. Remove room cabinet front.
61⁄2”
73⁄32”
4. The old transition duct, the three screws (if used) and any gaskets used to seal the old transition duct to the chassis will not be needed for the new installation but should be kept for possible reuse of the old chassis in this installation location.
5. Remove the chassis-to-case screws (two on each end) and carefully slide the chassis from the case.
Lateral duct adapter
Transition duct
Pub No. 30-7787-2 08-10 GE
STEP 2 Thumb screw hole location
(This step is necessary only if thumb screws were not previously used.)
1. Slide the new transition duct into place. Push it all the way in until it stops. Make sure the transition duct is straight and not “cocked” relative to the lateral duct adapter.
Transition duct
STEP 3 Chassis modification and installation
1. Remove the room cabinet front from the new chassis by pulling out at the bottom to release it. Lift it up to clear the rail along the chassis top.
2
1
2. Slide the chassis into the case and secure with four screws through the chassis flange holes.
NOTE: The lateral duct adapter and mounting brackets are omitted for clarity.
2. Center punch the transition duct mounting screw hole locations into the lateral duct adapter. Use the holes in the flanges at each end of the transition duct as a template. Make sure that the transition duct is all the way back when the center punch impressions are made.
Lateral duct
adapter
Metal clip
(flat side
down)
3. Remove the transition duct and drill two 1/4” diameter holes at the center punch locations. Slide the metal clips onto the flanges at these holes as shown in the illustration.
Wall case
3. Test fit seals as described below before removing paper backing.
4. Remove paper backing from each seal and place as shown. Seal at right side should be located towards left side of metal flange. It should be flush with the top rear and extend over the lower edge of flange. Seal at left side should be located towards the right side of the metal flange. It should be flush with the top rear and extend over the lower edge of flange (as shown in illustration). Be sure both seals are pressed into place on the metal flanges (seals should be as close as possible to screen without overlapping onto it).
Foam gasket
Loading...
+ 4 hidden pages