Lateral duct adapter
Before you begin - Read these instructions completely and carefully. IMPORTANT – OBSERVE ALL GOVERNING CODES AND ORDINANCES. Note to Installer – Be sure to leave these instructions with the Consumer. Note to Consumer – Keep these instructions with your Owner’s Manual for future reference.
Tools Needed
Blade-type Phillips head screwdriver screwdriver
Metal cutter 1/4” and 5/16”
Drill and 7/32" bit
Nut drivers
Top of case
Outside wall
Parts Included
Lateral duct adapter assembly
Mounting plates (2) Screws (4)
Metal seal strip Foam gaskets (2)
Speed Clip (4)
STEP 1 Case preparation
The RAK6053 lateral duct adapter is used to
modify the Zoneline (AZ45 and AZ65 series) so that discharged air may be directed into a secondary room. After the RAK6053 lateral duct adapter is installed on the Zoneline chassis and case, a 44” long lateral duct (RAK601B) may be attached to either the right or left end of the RAK6053 lateral duct adapter.
Ceiling
Note: Minimum Clearance of 10” recommended above RAK6052 for proper air discharge.
Air
discharge
10”
Transition duct
Mounting plate
1”
Outside wall
1/4” Min.
Min. 2”
Min. 2”
Adjacent wall
2. The RAB71* or RAB77* case should be installed in the wall according to instructions packed with the case, but using the following recommended dimensions:
Projection of case into room—1” min. This
is critical to allow clearance for mounting plates and screws. If less than 1” of the case projects into the room, it will be necessary to allow for the additional width in the wall opening for the case.
Projection of case to outside—1/4” min.
Either side of case to adjacent wall—2” min.
The case must be level, not tilted towards outside or inside. Be sure that drapes, window sill overhang, etc. will not interfere with air discharge from the completed lateral duct adapter.
Non-obstructed wall surface above top of
lateral duct adapter—10” min.
* All versions of wall cases.
Floor line
GE is a trademark of the General Electric Company.
Manufactured under trademark license.
Pub No. 31-30812-1 07-16 GEA
STEP 1 (continued)
11/16”
Mounting hole
position
11
16
2
9
1
16
3. Drill two 7/32” dia. holes into each end of the case for attachment of the mounting plates. A template is provided in these instructions. Mounting plates should be mounted before installing the case in the wall opening.
4. Attach the mounting plates to the case with four slotted screws provided. Secure on the inside of the case with speed clips provided.
Speed clips
Mounting
plate
Case
Case
(end view)
Holes 2 places
7/32”
left and right end
Mounting
plate
STEP 2 Adjust the discharge grille or damper
1. Check louvered discharge grille section.
Louvers should point away from the wall and toward the room. If necessary, remove this grille section and turn 180°; reassemble.
Discharge grille
Discharge damper
2. The air discharge damper on top of the lateral duct adapter can be changed for primary and secondary room air distribution.
3. Install new damper under grille on top of lateral duct adapter for 70% air discharge into primary room (room which the unit is installed) and 30% discharge into secondary (adjacent) room. By not installing the new damper, air distribution will be 80% Primary room and 20% secondary room. To install the new damper, place damper centered in the exist grille such that the flange on damper lays inside the grille flange. Place grille over the hole in the duct adapter, ensuring the damper does not fall out of place and secure with the four screws removed in step 1.
4. Attach the duct adapter to the case mounting plates with the screws provided.
5. If necessary, transfer end cap to the opposite end of the adapter. The end cap is attached to the end NOT used for attaching extension duct RAK601B.
Lateral duct adapter
Transition duct
Thumb screws
Discharge grille
and damper
End
cap
6. Separate the transition duct from the lateral duct adapter by removing the two thumb screws. Carefully slide the transition duct forward and off of the lateral duct adapter.
2
Open
end
Mounting
plate
Lateral
duct
adapter
STEP 3 Chassis modification and installation
1. Remove the room cabinet front by pulling out
at the bottom to release it. Lift it up to clear the rail along the chassis top.
2. Slide the chassis into the case and secure with the four screws supplied with the Zoneline unit through the chassis flange holes.
STEP 3 (continued)
4. Align the metal seal strip as shown and secure
with the four louver mounting screws.
Metal seal strip
5. Reconnect power and check operation. Insure the unit is in duct mode. To do this, turn unit off. Press the red “AUX” button and press “mode” button repeatedly until mode 7 appears. Press ‘+’ button to enable. Press “AUX” button again to confirm and exit selection.
3. Remove and save the four screws securing the louver to the chassis. Lift up and remove louver.
Louver
3
STEP 3 (continued)
6. Reinstall the room cabinet front by hooking the
top over the rail along the chassis top. Push it in at the bottom.
STEP 4 Removal of the chassis from the case for service
NOTE: If it becomes necessary to remove the chassis from the case, the following procedure should be performed.
1. Remove the two thumb screws securing the transition duct to the bottom of the duct adapter.
2. Carefully slide the transition duct forward to remove it from the chassis.
3. Remove the room cabinet front.
7. Remove the air filters from room cabinet front.
Air Filters
8. Slide the transition duct into place under the adapter and secure it with the two thumb screws.
4. Remove the chassis from the case for service.
Transition duct
9. Reinstall air filters into unit.
Air Filters
Transition duct