GE RAK5157, RAK5207, RAK5307 Data Sheet

Installation instructions for your new

RAK5157, RAK5207, RAK5307

Power Supply Kit for

Direct Connection

Before you begin – Read these instructions completely and carefully. IMPORTANT – OBSERVE ALL GOVERNING CODES AND ORDINANCES. Note to Installer – Be sure to leave these instructions with the Consumer.

Note to Consumer – Keep these instructions with your Owner’s Manual for future reference.

TOOLS NEEDED

Wire cutter

Adjustable wrench

Phillips head screwdriver

 

CAUTION: Disconnect the electrical power supply before wiring connections.

FOR 265 VOLT DIRECT CONNECT

APPLICATIONS ONLY

IMPORTANT: Connection of a 265V AC product to a branch circuit MUST be done by direct connection in accordance with the National Electrical Code. Plugging this unit into a building-mounted exposed receptacle is not permitted by code.

These models must be installed using the appropriate GE power supply kit for the branch circuit amperage and the electrical resistance heater wattage desired. See the POWER CONNECTION CHART to confirm the appropriate kit.

POWER CONNECTION CHART

GE

 

 

265 Volt

 

 

Power

 

Heater

Supply

 

Wattage

Kit

Circuit Protective Device

@ 265 Volts

RAK5157

15-Amp Time-Delay Fuse or Breaker

2.55 KW

RAK5207

20-Amp Time-Delay Fuse or Breaker

3.45 KW

RAK5307

30-Amp Time-Delay Fuse or Breaker

5.00 KW

 

 

 

It is the responsibility of the installer to ensure the connection of components is done in accordance with electrical codes.

Direct connection to branch circuit wiring inside the provided junction box must be made by connecting as follows.

IMPORTANT NOTES

This kit is for use with 265 Volt 7500 Series GE Zoneline Vertical Packaged Terminal Air Conditioner units only.

This unit must be properly grounded.

The electrical rating marked on the installed Zoneline and power supply kit must be the same as the supply branch circuit.

Aluminum building wiring may present special problems—consult a qualified electrician.

All wiring, including installation of the receptacle, must be in accordance with the NEC and local codes, ordinances and regulations.

This power supply kit provides for connection of 1/2″ trade size electrical conduit and provision for

connection to a wiring system in accordance with the National Electrical Code. ANSI/NFPA No. 70-1996 or latest edition.

Use ONLY the wiring size recommended for single outlet branch circuit.

Proper current protection is the responsibility of the owner.

Recommended branch circuit wire sizes*

Nameplate

 

maximum circuit

AWG wire

breaker size

size**

 

 

15A

14

20A

12

30A

10

 

 

AWG—American Wire Gauge

*Single circuit breaker from main box

**Based on copper wire, single-insulated conductor at 60°C

NOTE: Use copper conductors only.

Pub No. 31-60917 05-02 JR

Printed in the United States

GE RAK5157, RAK5207, RAK5307 Data Sheet

1. REMOVE THE FRONT PANEL

Remove the front case panel by removing the filter, taking out the 4 front screws, the upper 2 screws from the top of the panel and the shipping screws on each side, if present. (Discard the 2 side shipping screws, if present.)

2. REMOVE JUNCTION BOX COVER

Remove the junction box cover by taking out the front 2 screws.

Junction box

Junction box cover

3. ATTACH CONDUIT

Use the round knockout hole at the top of the junction box to install conduit coming from the branch circuit. Install and clamp the conduit through the conduit clamp and bring wire leads into the junction box. Leave 8″ of wire free from the end of the conduit.

Conduit

Conduit

 

clamp

4.MAKE WIRE LEAD CONNECTIONS INSIDE THE JUNCTION BOX

1.Make all wire connections by using appropriate UL-listed electrical connectors and techniques.

2.Connect the white and black leads of the Zoneline power supply kit to the branch circuit Neutral and L1 leads. (The white lead of the power supply kit should be connected to neutral.) Connect the green lead of the power supply kit to the power supply and branch circuit ground.

3.Be sure that all wire leads are inside the junction box and not pinched between the box and the unit. The green insulated ground wire from the Zoneline MUST be connected to the branch circuit ground wire.

4.Plug the 9-pin connector into the 9-pin receptacle in the junction box.

5.Replace the junction box cover by replacing the 2 screws removed earlier.

6.Replace the case front panel by replacing the 4 front screws and the 2 top screws. Replace the filter.

Conduit

Make wire lead connections

Loading...